| Drawings2021 | SUNSET SEWER INTERCEPTOR | Installation of approximately 5850 lf of new 18`` sanitary sewer main within NE Sunset Blvd from Harrington Av NE to Union Av NE. PMGR: Dave Christensen/John Hobson; OWN: City of Renton Wastewater Utility/CIP project. SEE S-2268 Pg 5 of 14 for surface water drwgs. |
| DrawingSet | SUNSET SEWER INTERCEPTOR | Installation of approximately 5 850 l.f. of new 18`` sanitary sewer main & 12`` stormline & 2 type 1 catch basins & 1 type 2 manhole within NE Sunset Blvd from Harrington Av NE to Union Av NE. PMGR: Dave Christensen/Mike Dotson; OWN: City of Renton Wastewater/Surface Water Utility/CIP project. SEE S-2268 Pg 5 of 14 for surface water drws. |
| | |
| | |
| | |