Name | Permit Name | Permit Status | Parcel Number | Community Planning Area | Project/File Description | |
---|---|---|---|---|---|---|
A_Traffic_Control_Application_N.288315_170601_v1 | ||||||
MFP17004471 | ||||||
Entry Properties | |
Tags | x-robots-tag |
Modified | 11/23/2024 2:28:24 PM |
Created | 6/3/2023 6:00:27 AM |
Path | \Department Folders\Community and Economic Development (CED)\Current Planning\Land Use Files\2023\LUA23-000189 |
Template | |
CED - Land Use Applications (LUA) | |
Fields | |
Project Name | PR23-000001 Land Use Stand Alone |
LUA Name | Cottonwood Lift Station Improvements |
Alias Names | Renton Lift Station and Force Main Improvements Phase 3, Cottonwood Lift Station Improvements |
Apply Date | 6/2/2023 |
Parcel Number | 1723059103 |
Address | 2101 MAPLE VALLEY HWY, RENTON, WA 98057-3905 |
Plan Status | Approved |
Community Planning Area | Cedar River |
Zoning District | (COR) Commercial Office Residential |
LUA Application Type | Shoreline Exemption |
Project/File Description | The applicant, City of Renton, is requesting a Shoreline Exemption to complete improvements to the existing Cottonwood Lift Station located at 2101 Maple Valley Highway (Attachment 1). The project is one on nine lift station improvement projects scheduled to be completed under Phase 3 of the Lift Station and Force Main Improvement Projects. The proposed work includes replacing pumps, piping, and fittings inside the existing wet well; replacing piping and fittings inside the existing valve vault; installing a new telemetry panel; and routing conduits from the existing valve vault to the new telemetry panel. The subject site is located within an existing utility easement near the Riviera Apartments (Attachment 2). It is estimated that approximately 30 cubic yards (CY) of native material would be excavated to install conduits from the existing valve to the new telemetry panel. The excavation would take place within an existing paved area used as a driveway from the nearby apartment complex. Approximately 10 CY of sand would be imported to bed the conduits and native material would be used to backfill the trench. The remaining disturbed area would be replaced in-kind. The project site is located within the Shoreline High Intensity designation and the Cedar River Reach C (CR-C). Proposed work would occur approximately 50 feet from the ordinary high water mark (OHWM). The subject project would not result in an increase in impervious area beyond what exists today. Construction is anticipated to commence later this summer. |
Associated File Number | PR23-000001 |
Project Completion Date | 6/16/2023 |
Status | Open |
Security | Public |