Name Project Name Project/File Description
Drawings2021
RENTON TECHNICAL COLLEGE MAINTENANCE & CLASSROOM ADDITION Install new 8" waterline including fire hydrants, 8" sewerling, 12" stormwater detention/infiltration and sidesewer for new campus building at Montore Ave NE & NE 4th St. PMGR: Mike Dotson, OWN/DEV: Renton School District #403 ENG: SM Stemper
DrawingSet
RENTON TECHNICAL COLLEGE MAINTENANCE & CLASSROOM ADDITION Install new 8" waterline including fire hydrants, 8" sewerling, 12" stormwater detention/infiltration and sidesewer for new campus building at Montore Ave NE & NE 4th St. PMGR: Mike Dotson, OWN/DEV: Renton School District #403 ENG: SM Stemper
HomeSearchMy WebLinkAboutC_Acceptance Letter_181221