Name Project Name Project/File Description
Drawings2021
RENTON AVE S & S 3RD ST STORM SYSTEM OUTFALL RELOCATION Construct appx. 95 l.f. of 18`` storm line to route Renton Ave S. storm system from failed outfall. System will connect to I-405 storm system. Project includes repair of hillside erosion at failed outfall. PMGR: Dan Carey, CIP TBD
DrawingSet
RENTON AVE S & S 3RD ST STORM SYSTEM OUTFALL RELOCATION Construct appx. 95 l.f. of 18`` storm line to route Renton Ave S. storm system from failed outfall. System will connect to I-405 storm system. Project includes repair of hillside erosion at failed outfall. PMGR: Dan Carey, CIP TBD
HomeSearchMy WebLinkAbout200402022004020920040223Council 02/02/2004Council 02/09/2004Council 02/23/2004