| Drawings2021 | VALLEY MEDICAL CENTER CENTRAL UTILITIES PLANT | Relocate 12" watermain, 24" stormline and side sewer associated with the construction of a new bldg enclosing 3 chillers, addition to main hospital building housing the facilities workroom, relocation of the loading dock & remodel of former CoGen bldg to house generators. |
| DrawingSet | VALLEY MEDICAL CENTER CENTRAL UTILITIES PLANT | Relocate 12" watermain, 24" stormline and side sewer associated with the construction of a new bldg enclosing 3 chillers, addition to main hospital building housing the facilities workroom, relocation of the loading dock & remodel of former CoGen bldg to house generators. |
| | |
| | |