Name | Project Name | Project/File Description | |
---|---|---|---|
Drawings2021 | LINDBERGH HIGH SCHOOL, PHASE I & II | ON-SITE STORM CONVEYANCE, DETENTION & DRIVEWAY APPROACH. LOC: 16426 128TH AVE SE. LUA#11--012, U110046. PRMG: Arneta Henninger; OWN; RENTON SCHOOL DISTRICT 403. CNSLT/ENG: CPL | |
DrawingSet | LINDBERGH HIGH SCHOOL | ON-SITE STORM CONVEYANCE, DETENTION & DRIVEWAY APPROACH. LOC: 16426 128TH AVE SE. LUA#11--012, U110046. PRMG: Arneta Henninger; OWN; RENTON SCHOOL DISTRICT 403. CNSLT/ENG: CPL | |