Name Project Name Project/File Description
R-269100
I-405 / I-5 TO SR 169 WIDENING STAGE 1 (SR 167) Batch uploaded on April 21, 2011; I-405 / I-5 to SR 169 Widening Stage 1: Stage 1 widened I-405 from SR 167 to I-5 and southbound SR 167 from I-5 to SW 41st. A design-build project. I-405. SR 167 MP 24.59 to 26.23. OWN: WSDOT / CNSLT: BTJV Tri-State. City Contact: Keith Wooley. Funded by 2002 Nickle and 2005 TPA gas taxes.
R-269101
I-405 / I-5 TO SR 169 WIDENING STAGE 1 (SR 167) Batch uploaded on April 21, 2011; I-405 / I-5 to SR 169 Widening Stage 1: Stage 1 widened I-405 from SR 167 to I-5 and southbound SR 167 from I-5 to SW 41st. A design-build project. I-405. SR 167 MP 24.59 to 26.23. OWN: WSDOT / CNSLT: BTJV Tri-State. City Contact: Keith Wooley. Funded by 2002 Nickle and 2005 TPA gas taxes.
HomeSearchMy WebLinkAboutR-246001r-246001TFWzR-2460Set