| T-209101 | S 43RD STREET IMPROVEMENTS - LID #329 (TALBOT ROAD S TO SR167) | Electrical Symbols and Schedules Sheet 69 (CD Apr 1991); CIP Project - Roadway widening including curbs, gutters, sidewalks, asphalt concrete paving, landscaping, tunnel, retaining walls, rockery walls, lighting, channelization, signals and utility relocations for storm, water, sanitary sewer. CNTR: RW Scott Construciton; CNSLT: Tudor Engineering; PMGR: Joe Armstrong. 12", 18" & 27" Stormline extension |
| T-209102 | S 43RD STREET IMPROVEMENTS - LID #329 (TALBOT ROAD S TO SR167) | Electrical Site Plan Sheet 70 (CD Apr 1991); CIP Project - Roadway widening including curbs, gutters, sidewalks, asphalt concrete paving, landscaping, tunnel, retaining walls, rockery walls, lighting, channelization, signals and utility relocations for storm, water, sanitary sewer. CNTR: RW Scott Construciton; CNSLT: Tudor Engineering; PMGR: Joe Armstrong. 12", 18" & 27" Stormline extension |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |