| Drawings2021 | BOEING WATERMAIN REHABILITATION AT WEST FENCE LINE | Boeing Watermain Rehabilitation; replace an existing on-site water line. Approximately 2,350 L.F. of a 12" fire main and 1,623 L.F. of an 8" watermain will be installed. The existing water line will be abandoned in place. Boeing`s Renton facility in the vicinity of the 4-45/4-79 bldgs along west fence line. PRMG:Kayren Kittrick Anthony Constr. Co. |
| DrawingSet | BOEING WATERMAIN REHABILITATION AT WEST FENCE LINE | Boeing Watermain Rehabilitation; replace an existing on-site water line. Approximately 2,350 L.F. of a 12" fire main and 1,623 L.F. of an 8" watermain will be installed. The existing water line will be abandoned in place. Boeing`s Renton facility in the vicinity of the 4-45/4-79 bldgs along west fence line. PRMG:Kayren Kittrick Anthony Constr. Co."Boeing Watermain Rehabilitation; replace an existing on-site water line. Approximately 2,350 L.F. of a 12" fire main and 1,623 L.F. of an 8" watermain will be installed. The existing water line will be abandoned in place. Boeing`s Renton facility in the vicinity of the 4-45/4-79 bldgs along west fence line. PRMG:Kayren Kittrick Anthony Constr. Co. |
| | |