Name Project Name Project/File Description
Drawings2021
TACO TIME RESTAURANT ADDITION Taco Time Restaurant Addition improvements include on-site storm drainage system, paved parking lot, driveway relocation and sidewalk replacement and off-site connection to stormline at 200 Rainier Av S. PMGR: Paul Lumbert; OWN: Frank Tonkin; CNSLT: Pacific Engineering Co.
DrawingSet
TACO TIME RESTAURANT ADDITION Taco Time Restaurant Addition improvements include on-site storm drainage system, paved parking lot, driveway relocation and sidewalk replacement and off-site connection to stormline at 200 Rainier Av S. PMGR: Paul Lumbert; OWN: Frank Tonkin; CNSLT: Pacific Engineering Co.
HomeSearchMy WebLinkAboutS-222201S-222202S-222203S-222204S-222205S-222206S-222207S-222208S-222209S-222210S-222211S-222212S-222213S-222214S-222215S-222216S-222217zS-2222set