| Drawings2021 | W-2133 TRANSMISSION MAINS FROM MAPLEWOOD PUMP STATION | Maplewood Trans Mains Schedule D 12`` and 16`` transmission mains in Maplewood Golf Course from Pump Station to Highlands 565 zone AND PART WAY TO 590 ZONE. PMGR Abdoul Gafour CNSLT RH2 Engineering. January 1994. DESIGNED BY RH2 ENGINEERING. CAG-88-011. CONSTRUCTED BY GRANT CONSTRUCTION. CAG-94-013. SEE WTR-21-0010 FOR FILES. SEE W-2222. |
| DrawingSet | W-2133 TRANSMISSION MAINS FROM MAPLEWOOD PUMP STATION | Maplewood Trans Mains Schedule D 12`` and 16`` transmission mains in Maplewood Golf Course from Pump Station to Highlands 565 zone AND PART WAY TO 590 ZONE. PMGR Abdoul Gafour CNSLT RH2 Engineering. January 1994. DESIGNED BY RH2 ENGINEERING. CAG-88-011. CONSTRUCTED BY GRANT CONSTRUCTION. CAG-94-013. SEE WTR-21-0010 FOR FILES. SEE W-2222. |
| | |