Name | Project Name | Project/File Description | |
---|---|---|---|
W-115301 | BOEING HIGH PRESSURE WATER (FIRE) DISTRIBUTION SYSTEM | Mechanical Mater (Apr 1990); FIRE FLOW ANALYSES PERFORMED BY RH2 FOR BOEING BUILDING 4-86 4-41 4-81 4-82 AND PACCAR SITE. JULY 20 1989 AND NOVEMBER 27 1989. | |
W-115302 | BOEING HIGH PRESSURE WATER (FIRE) DISTRIBUTION SYSTEM | Bldg 4-86 Analysis (Jul 1989); FIRE FLOW ANALYSES PERFORMED BY RH2 FOR BOEING BUILDING 4-86 4-41 4-81 4-82 AND PACCAR SITE. JULY 20 1989 AND NOVEMBER 27 1989. | |