| R-364601 | PHASE I WATER SCADA MASTER TELEMETRY UNIT TRANSITION | Batch scanned on 9/17/2014; Phase one of transitioning from the Emerson / Bristol Babcock 3330 master telemetry unit (MTU) to the Emerson Control Wave Micro (CWM) MTU. 2012. Project Manager: J.D. Wilson |
| R-364602 | PHASE I WATER SCADA MASTER TELEMETRY UNIT TRANSITION | Batch scanned on 9/17/2014; Phase one of transitioning from the Emerson / Bristol Babcock 3330 master telemetry unit (MTU) to the Emerson Control Wave Micro (CWM) MTU. 2012. Project Manager: J.D. Wilson |
| | |
| | |
| | |
| | |
| | |
| | |