| WWP2703473.1 | STONEGATE LIFT STATION REPLACEMENT | Replace and upsize Stonegate LS. Includes eliminating Summerwind LS, install gravity to route flows from Summerwind to Stonegate, redirect Stonegate force main, upsize some gravity sewer downstream of new forcemain. PMGR: John Hobson and David Christensen. STONEGATE LS CONVEYANCE ROAD IMPROVEMENTS SCHEDULE A & B PAGES 1-29; LS REPLACEMENT PAGES 1-42 |
| WWP2703473.10 | STONEGATE LIFT STATION REPLACEMENT | Replace and upsize Stonegate LS. Includes eliminating Summerwind LS, install gravity to route flows from Summerwind to Stonegate, redirect Stonegate force main, upsize some gravity sewer downstream of new forcemain. PMGR: John Hobson and David Christensen. STONEGATE LS CONVEYANCE ROAD IMPROVEMENTS SCHEDULE A & B PAGES 1-29; LS REPLACEMENT PAGES 1-42 |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |