Loading...
HomeSearchMy WebLinkAbout15615 City Pre-app notesArborist Report - Aberdeen Tree Plan ReportConceptual Drainage Control & Generalized Utility PlanEmail confirming approval of fire varianceEx10_Geotechnical Engineering Study_coverpageEx11_TIR Complete (rev 8-8-2016)_coverpageEx12_Arborist Report_coverpageEx13_Construction Mitigation DescriptionEx14_Finley Modification LetterEx15_LLA_OPR2016070790006-1-2Ex16_CI-73 Residential Building Height_coverpageEx17_Advisory Notes to ApplicantEx2_Finley Short Plat MapEx2-17Ex3_Neighborhood Detail MapEx4_Existing Condition PlanEx5_Preliminary TESC & Demolition PlanEx6_Preliminary Grading PlanEx7_Conceptual Drainage Control & Generalized Utility PlanEx8_Preliminary Tree Replacement PlanEx9_Preliminary Landscape PlanExisting Condition PlanFinley - Utility-Grading-topo PlansFinley density worksheetFinley Geo Risk LetterFinley grade-utility 7-14-16Finley Lot Closures SPFinley Public Notice AffFinley Short Plat Complete (Revised 08-08-2016)Finley SP MapFinley SP Master AppFinley SP NarrativeFinley SP Title ReportFinley SP Waiver FormGeotech report-SP SubmittalLA-2 LANDSCAPE PLAN (2)LA-3 DETAIL SHEETLetter to City of Renton (Clark Close) - 08.11.2016Preliminary Grading PlanPreliminary TESC & Demolition PlanShort Plat PlanTIR Complete (rev 8-8-2016)TreeRetentionWorksheet