| SWP2702862.1 | SOUTH 180TH STREET GRADE SEPARATION PROJECT | City of Tukwila is lead agency for constrctn of a below grade crossing at S 180th St/SW 43rd St. Design & constrctn costs to be shared equally w/City of Renton & design involves relocatn of wtr, swr, new strm retentn pond & Tukwila Wetland Mitgatn. WO#25388 Dev/Cntr/Own: Cities of Tukwila & Renton; CNSLT: Berger/Abam Consultants; PMGR: Allen Quynn - CIP. |
| SWP2702862.10 | SOUTH 180TH STREET GRADE SEPARATION PROJECT | City of Tukwila is lead agency for constrctn of a below grade crossing at S 180th St/SW 43rd St. Design & constrctn costs to be shared equally w/City of Renton & design involves relocatn of wtr, swr, new strm retentn pond & Tukwila Wetland Mitgatn. WO#25388 Dev/Cntr/Own: Cities of Tukwila & Renton; CNSLT: Berger/Abam Consultants; PMGR: Allen Quynn - CIP. |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |