Name | Project Name | Project/File Description | |
---|---|---|---|
DrawingSet | UPGRADE MAPLEWOOD WTP SCADA | Upgrade Maplewood water treatment plant SCADA. Replace Bristol Babcock 3300 RTU which is obsolete with Control Wave Micro RTU which is new standard for the drinking water system. | |
WTR2703662 | UPGRADE MAPLEWOOD WTP SCADA | Upgrade Maplewood water treatment plant SCADA. Replace Bristol Babcock 3300 RTU which is obsolete with Control Wave Micro RTU which is new standard for the drinking water system. |