Name | Project Name | Project/File Description | |
---|---|---|---|
Drawings2021 | RAYMOND AVE SW/SW 12TH ST STORM SYSTEM IMPROVEMENT | Install 12`` CPEP culvert to drain property on east side of Raymond Ave SW. Constructed by Maintenance Dept. CIP Project. PMGR: Dan Carey Date: 10-14-2013. | |
DrawingSet | RAYMOND AVE SW/SW 12TH ST STORM SYSTEM IMPROVEMENT | Install 12`` CPEP culvert to drain property on east side of Raymond Ave SW. Constructed by Maintenance Dept. CIP Project. PMGR: Dan Carey Date: 10-14-2013. | |