Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
Ex. 01.1 - Deferral Decision No. DEF 23001823 for Outlot 1 - 4.7.23
Ex. 01.2 - Deferral Decision No. DEF 23001824 for Outlot 2 - 4.7.23
Ex. 02 - Enclosure 2 to Home Depot's Notices of Appeal of Deferral Decision Nos. DEF 23001823 and DEF 23001824 - AKA Examiners' Decision - 8.9.22
Ex. 03 - Enclosure 3 to Home Depot's Notices of Appeal of Deferral Decision Nos. DEF 23001823 and DEF 23001824 AKA email exchanges - 4.3.23 and 4.7.23
Ex. 04 - Enclosure 4 to Home Depot's Notices of Appeal of Deferral Decision Nos. DEF 23001823 and DEF 23001824 AKA Brianne Bannwarth email - 4.21.23 and 4.22.23
Ex. 05 - Enclosure 5 to Home Depot's Notices of Appeal of Deferral Decision Nos. DEF 23001823 and DEF 23001824 AKA Hearing Exhibit 2
Ex. 06 - Enclosure 6 to Home Depot's Notices of Appeal of Deferral Decision Nos. DEF 23001823 and DEF 23001824 AKA Hearing Exhibit 20
Ex. 07 - Enclosure 7 to Home Depot's Notices of Appeal of Deferral Decision Nos. DEF 23001823 and DEF 23001824 AKA Examiner's Decision Upon Reconsideration
Ex. 08 Approved - Civil Construction Plan Set
Ex. 09 - 10.18.22 Ltr from the City of Renton RE Home Depot's proposed lot line adjustment
Ex. 10 - Email exchange between the City of Vancouver and Dan Zoldak - 4.6 - 4.9.23
Ex. 11 - Civil Construction Permit Application Process and Submit Requirements document that our office retrieved on 8.10.23 from the City's website
Ex. 12 Previous hearing EX_14_C_Advisory_Notes
Ex. 13 Previous hearing EX_24_HEX Home Depot PPT
Ex. 14 SR_Home Depot_FINAL (1)
Ex. 15 Site Lighting & Signals
Ex. 16 Final Inspection & Construction Closeout Process
Ex. 17 [2022-02-16 15-04] jding@rentonwa.gov [RE- Home Depot sign] 4693a
Ex. 18 - KC Metro Talbot Lighting Plan 60% Design
Ex. 19 KC Metro Lighting Wiring Schematics 60% Design
Ex. 20 KC Metro Pole Schedule 60% Design
Ex. 21 KC Metro Landscape Schedule 60% Design
Ex. 22 KC Metro Talbot Landscape Plan 60% Design
Ex. 23 KC Metro Landscape Details
Ex. 24 RE_ Talbot - Home Depot (8)
Ex. 24.1 Email Attachment EX_02_P_Conceptual_Site_Plan_220419_v4
Ex. 24.2 Email Attachment EX_20_P_Conceptual_Landscape_Plan_220425_v1
Ex. 25 RE_ KC Metro TCE (7)
Ex. 26 RE_ KC Metro TCE (4)
Ex. 27 RE_ KC Metro TCE (2)
Ex. 28 RE_ Frontage Improvement Deferral (21)
Ex. 29 RE_ Frontage Improvement Deferral (20)
Ex. 30 Email RE Home Depot
Ex. 30.1 - Email Attachment re Party of Record Public Comments -Kelli Sheldon 220314
Ex. 31 - Email RE HD Renton
Ex. 31.1 - Email Attachment RE HD Renton
Ex. 32 - Email RE Frontage Improvement Deferral
Ex. 32.1 KC Metro Talbot Frontage 90% Design
Ex. 33 FW_ Home Depot Renton
Ex. 34 [2023-04-05 19-38] jchavez@rentonwa.gov [FW- Frontage Improvement Deferral ] 465c1
Ex. 34.1 Email Attachment Deferral Application (Outlot 1) 4.3.2023 SIGNED
Ex. 34.2 Email Attachment Deferral Application (Outlot 2) 4.3.2023 SIGNED
Ex. 34.3 Email Attachment Home Depot Renton Take Off Summary - Outlot 1
Ex. 34.4 Email Attachment Home Depot Renton Take Off Summary - Outlot 2
Ex. 34.5 Email Attachment Frontage Plan (HD)_Home Depot Responsibility
Ex. 34.6 Email Attachment KC Metro Talbot Frontage 90% Design
Ex. 35 [2023-03-27 23-56] bbannwarth@rentonwa.gov [RE- Talbot - Home Depot] 465bf
Ex. 36 [2022-03-18 20-07] bbannwarth@rentonwa.gov [Home Depot (LUA21-000452) - Transportati] 46528
Ex. 37 [2023-01-31] Email from KC Metro re RapidRide I line
Ex. 38 [2023-03-27] RE Talbot - Home Depot
Ex. 39 2023-04-07 RE KC Metro TCE
Ex. 40 - Email (2023-05-09 00-09) njanders@rentonwa.gov [C22003168]
Ex. 40.1 Email Attachment RE [2023-05-09 00-09] njanders@rentonwa.gov [C22003168]
Ex. 40.2 Email Attachment RE [2023-05-09 00-09] njanders@rentonwa.gov [C22003168]
Ex. 40.3 - Email Attachment RE [2023-05-09 00-09] njanders@rentonwa.gov
Ex. 40.4 Email Attachment RE [2023-05-09 00-09] njanders@rentonwa.gov
Ex. 40.5 Email Attachment RE [2023-05-09 00-09] njanders@rentonwa.gov [C22003168]
Ex. 41 Civil Construction Permit Closeout and Maintenance Surety Release Process
Ex. 42 RE_ Home Depot Accommodations
Ex. 43 Metro I-Line Surety - Bond Quantity Worksheet
Ex. 44 - FW_ Frontage Improvement Deferral
Ex. 44.1 Email Attachment Deferral Application (Outlot 1) 4.3.2023 SIGNED
Ex. 44.2 Email Attachment Deferral Application (Outlot 2) 4.3.2023 SIGNED
Ex. 44.3 Email Attachment Home Depot Renton Take Off Summary - Outlot 1
Ex. 44.4 Email Attachment Home Depot Renton Take Off Summary - Outlot 2
Ex. 44.5 Email Attachment Frontage Plan (HD)_Home Depot Responsibility
Ex. 44.6 Email Attachment KC Metro Talbot Frontage 90% Design
Ex. 45 FW_ Appeal Fee
Ex. 46 [2022-08-18 17-05] lrebelo@larsandersen.com [RE- HD Renton] 4656f
Ex. 47 M_B22002238_Home Depot_CO_Inspection_Report
Ex. 48 M_B22002238_Home Depot_TCO_Inspection_Report
Ex. 49 - Email from Jonathan Chaves, City of Renton RE Final Closeout items and costs
Ex. 49.1 Surety - Bond Quantity Worksheet
Ex. 50 Home Depot (PERMIT #C22003168_C22004541) - Construction Close Out
Ex. 50.1 Email Attachment Home Depot punch list 5-3-2023
Ex. 50.2 Email Attachment HD Renton - Proposed Easements
Ex. 50.3 Email Attchment HD_Bill of Sale & Cost Data_20230505
Ex. 50.4 Email Attachment FW Home Depot Outdoor Retail screening
Ex. 51 Renton Comments on Metro's 60% Design Drainage Plan
Ex. 52 Design Metro I-Line Transmittal Letter
Ex. 53 Metro I-Line Illumination Memo
Ex. 54 Metro I-Line Structural Calculations
Ex. 55 FW_ HOME DEPOT
Ex. 55.1 Email Attachment FW_ HOME DEPOT ATTACHMENT - HD Renton - ROW Landscape Plans 3.3.23
Ex. 56 RE_ Home Depot (66)
Ex. 57 RE_ HOME DEPOT
Ex. 58 RE_ Home Depot (54)
Ex. 59 RE_ Home Depot (59)
Ex. 60 RE_ Home Depot (61)