Loading...
HomeSearchMy WebLinkAboutEx. 01.1 - Deferral Decision No. DEF 23001823 for Outlot 1 - 4.7.23Ex. 01.2 - Deferral Decision No. DEF 23001824 for Outlot 2 - 4.7.23Ex. 02 - Enclosure 2 to Home Depot's Notices of Appeal of Deferral Decision Nos. DEF 23001823 and DEF 23001824 - AKA Examiners' Decision - 8.9.22Ex. 03 - Enclosure 3 to Home Depot's Notices of Appeal of Deferral Decision Nos. DEF 23001823 and DEF 23001824 AKA email exchanges - 4.3.23 and 4.7.23Ex. 04 - Enclosure 4 to Home Depot's Notices of Appeal of Deferral Decision Nos. DEF 23001823 and DEF 23001824 AKA Brianne Bannwarth email - 4.21.23 and 4.22.23Ex. 05 - Enclosure 5 to Home Depot's Notices of Appeal of Deferral Decision Nos. DEF 23001823 and DEF 23001824 AKA Hearing Exhibit 2Ex. 06 - Enclosure 6 to Home Depot's Notices of Appeal of Deferral Decision Nos. DEF 23001823 and DEF 23001824 AKA Hearing Exhibit 20Ex. 07 - Enclosure 7 to Home Depot's Notices of Appeal of Deferral Decision Nos. DEF 23001823 and DEF 23001824 AKA Examiner's Decision Upon ReconsiderationEx. 08 Approved - Civil Construction Plan SetEx. 09 - 10.18.22 Ltr from the City of Renton RE Home Depot's proposed lot line adjustmentEx. 10 - Email exchange between the City of Vancouver and Dan Zoldak - 4.6 - 4.9.23Ex. 11 - Civil Construction Permit Application Process and Submit Requirements document that our office retrieved on 8.10.23 from the City's websiteEx. 12 Previous hearing EX_14_C_Advisory_NotesEx. 13 Previous hearing EX_24_HEX Home Depot PPTEx. 14 SR_Home Depot_FINAL (1)Ex. 15 Site Lighting & SignalsEx. 16 Final Inspection & Construction Closeout ProcessEx. 17 [2022-02-16 15-04] jding@rentonwa.gov [RE- Home Depot sign] 4693aEx. 18 - KC Metro Talbot Lighting Plan 60% DesignEx. 19 KC Metro Lighting Wiring Schematics 60% DesignEx. 20 KC Metro Pole Schedule 60% DesignEx. 21 KC Metro Landscape Schedule 60% DesignEx. 22 KC Metro Talbot Landscape Plan 60% DesignEx. 23 KC Metro Landscape DetailsEx. 24 RE_ Talbot - Home Depot (8)Ex. 24.1 Email Attachment EX_02_P_Conceptual_Site_Plan_220419_v4Ex. 24.2 Email Attachment EX_20_P_Conceptual_Landscape_Plan_220425_v1Ex. 25 RE_ KC Metro TCE (7)Ex. 26 RE_ KC Metro TCE (4)Ex. 27 RE_ KC Metro TCE (2)Ex. 28 RE_ Frontage Improvement Deferral (21)Ex. 29 RE_ Frontage Improvement Deferral (20)Ex. 30 Email RE Home DepotEx. 30.1 - Email Attachment re Party of Record Public Comments -Kelli Sheldon 220314Ex. 31 - Email RE HD RentonEx. 31.1 - Email Attachment RE HD RentonEx. 32 - Email RE Frontage Improvement DeferralEx. 32.1 KC Metro Talbot Frontage 90% DesignEx. 33 FW_ Home Depot RentonEx. 34 [2023-04-05 19-38] jchavez@rentonwa.gov [FW- Frontage Improvement Deferral ] 465c1Ex. 34.1 Email Attachment Deferral Application (Outlot 1) 4.3.2023 SIGNEDEx. 34.2 Email Attachment Deferral Application (Outlot 2) 4.3.2023 SIGNEDEx. 34.3 Email Attachment Home Depot Renton Take Off Summary - Outlot 1Ex. 34.4 Email Attachment Home Depot Renton Take Off Summary - Outlot 2Ex. 34.5 Email Attachment Frontage Plan (HD)_Home Depot ResponsibilityEx. 34.6 Email Attachment KC Metro Talbot Frontage 90% DesignEx. 35 [2023-03-27 23-56] bbannwarth@rentonwa.gov [RE- Talbot - Home Depot] 465bfEx. 36 [2022-03-18 20-07] bbannwarth@rentonwa.gov [Home Depot (LUA21-000452) - Transportati] 46528Ex. 37 [2023-01-31] Email from KC Metro re RapidRide I lineEx. 38 [2023-03-27] RE Talbot - Home DepotEx. 39 2023-04-07 RE KC Metro TCEEx. 40 - Email (2023-05-09 00-09) njanders@rentonwa.gov [C22003168]Ex. 40.1 Email Attachment RE [2023-05-09 00-09] njanders@rentonwa.gov [C22003168]Ex. 40.2 Email Attachment RE [2023-05-09 00-09] njanders@rentonwa.gov [C22003168]Ex. 40.3 - Email Attachment RE [2023-05-09 00-09] njanders@rentonwa.govEx. 40.4 Email Attachment RE [2023-05-09 00-09] njanders@rentonwa.govEx. 40.5 Email Attachment RE [2023-05-09 00-09] njanders@rentonwa.gov [C22003168]Ex. 41 Civil Construction Permit Closeout and Maintenance Surety Release ProcessEx. 42 RE_ Home Depot AccommodationsEx. 43 Metro I-Line Surety - Bond Quantity WorksheetEx. 44 - FW_ Frontage Improvement DeferralEx. 44.1 Email Attachment Deferral Application (Outlot 1) 4.3.2023 SIGNEDEx. 44.2 Email Attachment Deferral Application (Outlot 2) 4.3.2023 SIGNEDEx. 44.3 Email Attachment Home Depot Renton Take Off Summary - Outlot 1Ex. 44.4 Email Attachment Home Depot Renton Take Off Summary - Outlot 2Ex. 44.5 Email Attachment Frontage Plan (HD)_Home Depot ResponsibilityEx. 44.6 Email Attachment KC Metro Talbot Frontage 90% DesignEx. 45 FW_ Appeal FeeEx. 46 [2022-08-18 17-05] lrebelo@larsandersen.com [RE- HD Renton] 4656fEx. 47 M_B22002238_Home Depot_CO_Inspection_ReportEx. 48 M_B22002238_Home Depot_TCO_Inspection_ReportEx. 49 - Email from Jonathan Chaves, City of Renton RE Final Closeout items and costsEx. 49.1 Surety - Bond Quantity WorksheetEx. 50 Home Depot (PERMIT #C22003168_C22004541) - Construction Close OutEx. 50.1 Email Attachment Home Depot punch list 5-3-2023Ex. 50.2 Email Attachment HD Renton - Proposed EasementsEx. 50.3 Email Attchment HD_Bill of Sale & Cost Data_20230505Ex. 50.4 Email Attachment FW Home Depot Outdoor Retail screeningEx. 51 Renton Comments on Metro's 60% Design Drainage PlanEx. 52 Design Metro I-Line Transmittal LetterEx. 53 Metro I-Line Illumination MemoEx. 54 Metro I-Line Structural CalculationsEx. 55 FW_ HOME DEPOTEx. 55.1 Email Attachment FW_ HOME DEPOT ATTACHMENT - HD Renton - ROW Landscape Plans 3.3.23Ex. 56 RE_ Home Depot (66)Ex. 57 RE_ HOME DEPOTEx. 58 RE_ Home Depot (54)Ex. 59 RE_ Home Depot (59)Ex. 60 RE_ Home Depot (61)