| Drawings2021 | BORDNER SHORT PLAT | BORDNER SHORT PLAT, Installation of 189' of new 12" stormline and 154' of street improvements including planting strip, sidewalk, 2 driveways and relocate fire hydrant. CONTRACTOR: BORDNER CONSTRUCTION; PROJECT MANAGER: DANIEL CAREY |
| DrawingSet | BORDNER SHORT PLAT | BORDNER SHORT PLAT Basin 10 Installation of 189` of new 12`` stormline and 154` of street improvements including planting strip sidewalk 2 driveways and relocate fire hydrant on Lincoln Ave. EAST LAKE WASHINGTON MAJOR BASIN |
| | |
| | |
| | |
| | |