| D-305701 | OVERDREDGE MITIGATION (ELLIOT SPAWNING & REARING CHANNEL) | Batch Scanned From Roll 207 on July 13, 2007; Plan/design/permit/construct & monitor a salmonid spawning & rearing channel on Cedar River to serve as mitiagtion for overdredging of the Cedar River by USACE. River dredging occurred during 1998 as part of the USACE Cedar River Section 205 Flood Hazard Reduction Project. PMGR: Gary Schimek |
| D-305702 | OVERDREDGE MITIGATION (ELLIOT SPAWNING & REARING CHANNEL) | Batch Scanned From Roll 207 on July 13, 2007; Plan/design/permit/construct & monitor a salmonid spawning & rearing channel on Cedar River to serve as mitiagtion for overdredging of the Cedar River by USACE. River dredging occurred during 1998 as part of the USACE Cedar River Section 205 Flood Hazard Reduction Project. PMGR: Gary Schimek |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |