Loading...
HomeMy WebLinkAboutR-394713NE 1/4 OF S 321 T 23 N1 R 5 E co I W 0 0 0 N 0 rY a w rr N _J ca m I N 3 0 N Q O U Z Z Q 2 6 0 rn w a a Y a rr Z 0 Z w z 0 Z to W M Z J 03 BARS T SPACING 24" DIAM., 43' 04AM4M. I OR 54' DIAM. HOLE r (TYP.) �• 12 1" MIN. iJ2, MAX. 84" or 96" FLAT SLAB TOP U5 BARS T SPACING 24"x2 24" !)TAM., 48' DV1IA hL J DR 54" DIAM. HOLE 2' PYP L1' MIN, 2 112" MAX. 7Z" FLAT SLAB TOP 04 BARS @ 6' SPACING zD` x 2aa ort 24" dIAM. HOLE 2' (TYP ) 1' MIN. 2 1'2" MAX. 48", !W, or ow FLAT SLAB TOP TYPICAL ORIENTATION FOR ACCESS AND STEPS 24" MIN._r n I 40, MIN. I ECCENTRIC CONE SECTION R HOOP FOR H' wU �s "R HOOPS FOR 13`0 RECTANGULAR ADJUSTMENT SECTION 1.0 As an acceptable allernative to rehar, wire mesh having a minimum area of 0.12 square Inches per foot may be used for adjustment sections. 12" (TYP.> 6" I y `� PREFABRICATED LADDER m STEP <DONE #3 BAR HOOP Q, kS* CIRCULAR ADJUSTMENT SECTION PUBLIC WORKS MISCELLANEOUS DETAILS FOR + ` DEPARTMENT DRAINAGE STRUCTURES D � C 1505 Westlake Ave. N. Suite 305 Seattle, WA 98109 STD. PLAN - 204.60 MARCH 200B MISC. DETAILS FOR DRAINAGE STRUCTURES T (206) 522-9510 F (206)522-8344 WWW. PAcLAND.COM NTS ifftis or pba mmg�act6n fur uu-iy A. NI-a4al and Conerete s an 3' max I It+ilgs OF Wpc camper�on 3' max a~ L 0.15 ikw 'I.. Imks or pipe campedon 0.&5 dso An. gravel Wks backE for forpips bedding raundallons when sgralded B. Pipe - Arch Instailladun Rigid Pipe NOTES: 1. Pipe compaction Ilrrlls shown on this plant are for pipe construction In an embankment. For pipe construction In a stench, the horl-rontal Imps of the pipe wrnpacion zone shall be the walls of the wench. 2. All steel and sluminurn pipe and plpe-arc4Bs shall be Installed In accordance with deAKjn A. 3. Concrete pipe with elliptical Peinf*rcament shall ire Installed hi accordance Mlh design A. 4, Concrete pipe, plain or with circular relnlarcemenf, shall be Insfaled with design A 5. 0. 0. Is equal to the outside diameter of a pipe or Use outside span of pipe -arch. The c1mensions shown as OA. wiih S ma imam shall be O.D. until O.O. equals 3'; at which point 3'shall be used. T-0" far diameters 12" through 42" and spans lhrnugti 50" 7,0" for diameters greater than 42" and spans greater than 50". W (see now 4) Intl ad plpgr Lone bedding materiel for flexible pip iw�a onto Bj ❑.0. Teurtaatlon le•al 4 A 4' raln 27' 1.0. and under 6"mhl.nvar27"La Redding for Flerdble Pipe Flexible Pipe NOTES: 1. provide uniform support under bartels" 2. Hand tamp under haunctles. 3. Compact bedding material to 95% malu denshy directly aver pipe, hand lampatily. 4. See "Excavadon and preparation of TrOndr" In sanitary sewers section of the standard WSOODAPWA spednuallons for trench Mdth'W" and trendning options. The pipe zone wll be the actual hunch width. The minimum concrete width steal he 1 � I.O. = 19". 5. Trench backfll shall conform to-Sacktlling Sower Trenches" In the sanitary sewers se )don of the WSDOTIAPWA standard spedflcadans, ekceptthat rocks or lumps larger than 1' per loot 0 pipe diameter shall not be used In the backdll material. G. See `Eledding Material for Flexible Pipe` In aggregates wcdon of the W51]OT+APVVA s„sndard spedficadons for Idle material speddcadodls. =Bac"ll material placed In 0.5' loose layers and FIfF/J compaMd to 95% madmorn denshy. smMethod B or C compaction (WSDOTlAPWA) standard Specifications`) Pipe Size Min. dist. between barrels circular pipe cone., LCPE, CIVIP (diameter) 12" to 24" 2" 30' to 96" dlam. 12 102" 10 180" 48" pipe - arch metal only (span) 18' to 36" 12" 43" to 142" span 13 148" to 199" 48" STD. PLAN - 220.00 PUBLIC WORKS PIPE COMPACTION + ` DEPARTMENT DESIGN AND BACKFILL MARCH 200B PIPE COMPACTION DESIGN AND BACKFILL REVISION NTS SURVEYED: WRH DESIGNED: LRR DRAWN: CMD CHECKED: WFF BY DATE APPR APPROVED: rchnvvaWe walerdyhl wuping w tiango 2" doled. plate welded loelbow J1f with 4AIce. as spedled ELBOW RESTRICTgR DETT ISOMETRIC elow.atian per plans V min. under pavement t8" m TT- C min, d.slar, UVS. dlbgw restdctor. snc wtal pipe supP- see Note 6 1,5 z d �j' min, T- � dulltsq pie: see napes 1 $ rrarne A Sala cDvet marked 'DRAIN" with belting doles see note 3 IAA. ape verlicdi bar [gale Tor secandary We[ handhdds. steps or Ladder Ihvdn and deviation �5hear gate M11h control per pions rod for cleanauY&aln to 12' (rod bent as refit red for vertical al�nnrenl n2., wihcove•'l o Z F welded restddor plaw 12' wM odlce dlometeras specified ((lot needed F for soil control only) SECTION A -A T mindearance l4 any portion or rrop-T Incluoing o6ows rs NOTESi 1. Use a mimimum of a 54" dameter type 2 catch basin. 111 2. Oudet Gapachy: 1W-Year developed peak flow. 3. Metal Parts: Corroslon resislanL 61buw reslhiar Non -Galvanized parts gerfenW. se9 delay Gelvarized pipe pails to have asphalt Treatment 1. 4. Frame and ladder or steps offset so: A Cleanout gate Is visible horn top. B. Climb -down space Is clear of riser and deranout gate. C. Frame Is clear of curb. 5. II metal ou[lel pipe connects to cement concrete pipe: outlet pipe to have smooth O.D. equal to Concrete pipe I.D. less <". 6. Provide at least one 3" k .090 gage support bracket anchored to c•rtclete wal. (maximurn 3'-0" vertical spacing) 7. Locate elbow resirictof{s) as necessary to provide minimum dearance as shown. 8. Locate additional ladder rungs In structures used as access to tanks and vaults to allow access when catch Basin Is died with water. f necessary r� see note l i mlrL PUN VIEW addlonal ladder rungs hill sets) to allow muss W lank%or vaults when colch Is flied vAth water STD. PLAN - 2 7.00 + + PUBLIC WORKS FLOWN RESTRICTOR DEPARTMENT OIL POLLUTION CONTROL TEE MARCH 200B SCALE: AS SHOWN ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY FLOW CONTROL CB VERTICAL• NAVD 1988 HORIZONTAL- NAD 1983/1991 DATUM NTS ENGINEER'S RECORD DRAWING CERTIFICATION SEE SHEET CV-1.0 FOR SIGNED ENGINEER'S RECORD DRAWING CERTIFICATION NOTE CITY OF RENTON Planning/Building/Public Works Dept. CONTRO FLOW L CB TABLE DESCRIPTION VAULT 1 RIM ELEVATION 400.49 INLET ELEVATION 395.60 OUTLET ELEVATION 395.60 ORIFICE #1 ELEVATION 393.60 ORIFICE #1 DIAMETER 0.6 IN ORIFICE #2 ELEVATION 397.40 ORIFICE #2 DIAMETER 1.2 IN RISER ELEVATION 398.10 OUTLET PIPE DIAMETER 12 IN IN COMPLIANCE WITH CITY OF RENTON STANDARDS RENTON FIRESTONE 17808 108TH AVE SE RECORD DRAWINGS DRAINAGE DETAILS U W O O O I Cfl D N co O T LL W Z O I- Cn W DATE: 02/21/2019 LL FIEWBOOK: Z PAGE: O DRAWING N0: C-6.3 Z SHEET: OF, W 13 18 R-394713