Purpose of checklist:
Governmental agencies use this checklist to help determine whether the environmental impacts of your
proposal are significant. This information is also helpful to determine if available avoidance, minimization
or compensatory mitigation measures will address the probable significant impacts or if an environmental
impact statement will be prepared to further analyze the proposal.
Instructions for applicants:
This environmental checklist asks you to describe some basic information about your proposal. Please
answer each question accurately and carefully, to the best of your knowledge. You may need to consult
with an agency specialist or private consultant for some questions. You may use "not applicable" or
"does not apply" only when you can explain why it does not apply and not when the answer is unknown.
You may also attach or incorporate by reference additional studies reports. Complete and accurate
answers to these questions often avoid delays with the SEPA process as well as later in the decision -
making process.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of
time or on different parcels of land. Attach any additional information that will help describe your proposal
or its environmental effects. The agency to which you submit this checklist may ask you to explain your
answers or provide additional information reasonably related to determining if there may be significant
adverse impact.
Instructions for Lead Agencies:
Please adjust the format of this template as needed. Additional information may be necessary to
evaluate the existing environment, all interrelated aspects of the proposal and an analysis of adverse
impacts. The checklist is considered the first but not necessarily the only source of information needed to
make an adequate threshold determination. Once a threshold determination is made, the lead agency is
responsible for the completeness and accuracy of the checklist and other supporting documents.
Use of checklist for nonproject proposals:
For nonproject proposals (such as ordinances, regulations, plans and programs), complete the applicable
parts of sections A and B plus the SUPPLEMENTAL SHEET FOR NOINPROJECT ACTION$ (part d). Please
completely answer all questions that apply and note that the words "project," "applicant," and "property or
site" should be read as "proposal," "proponent," and "affected geographic area," respectively_ The lead
agency may exclude (for non -projects) questions in Part B - Environmental Elements —that do not
contribute meaningfully to the analysis of the proposal.
A. Background HELP
1. Name of proposed project, if applicable: Maple Highlands
2. Name of applicant: Applicant: Aron Golden. Canner Homes
GonTacT: Tim Prusa. KPFF Consulting Engineers
3. Address and phone number of applicant and contact person:
SEPA Environmental checklist (WAC 197-11-960) July 2010
Aran Golden
1-888-302-1252
12600 SE 38th St,
Suite 250
Bellevue, WA 98006
Tim Prusa
1-206-926-0585
1891 Fifth Ave,
Suite 1600
Seattle, WA 98101
Pago 1 of 12
4. Date checklist prepared: March 18th, 2022
5. Agency requesting checklist: City of Renton
6. Proposed timing or schedule (including phasing, if applicable): Construction is anticipated to begin summer
2022 and be complete in winter 2023
7. Do you have any plans for future additions, expansion, or further activity related to or
connected with this proposal? If yes, explain. No future activity is proposed in relation to this project.
8. List any environmental information you know about that has been prepared, or will be
prepared, directly related to this proposal. Arborist Report by American Forest Management, dated Feb 24th, 2022;
Technical Information Report by KPFF, dated Mar 18th, 2022
9. Do you know whether applications are pending for governmental approvals of other
proposals directly affecting the properly covered by your proposal? If yes, explain.
No other approvals or applications are pending in relation to this project.
10. List any government approvals or permits that will be needed for your proposal, if known.
Developer Extension tram king County Water District go; Civil Construction Permit and Final Flat trom City of Renton
11. Give brief, complete description of your proposal, including the proposed uses and the size
of the project and site. There are several questions later in this checklist that ask you to
describe certain aspects of your proposal. You do not need to repeat those answers on this
page. (Lead agencies may modify this form to include additional specific information on project
description.) Subdivide two parcels into 12 parcels, demolish two existing single family homes and Construct 12
single family homes with associated roadway, utility, and landscaping improvements.
12. Location of the proposal. Give sufficient information for a person to understand the precise
location of your proposed project, including a street address, if any, and section, township, and
range, if known. If a proposal would occur over a range of area, provide the range or
boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic
map, if reasonably available. While you should submit any plans required by the agency, you
are not required to duplicate maps or detailed plans submitted with any permit applications
related to this checklist. 13818 152nd Ave SE & 13929 154th Ave SE. Renton, WA 98059
B. environmental Elements HELP
1. Earth hf 2!p
a. General description of the site:
(circle one): Flat rolling, hilly, steep slopes, mountainous, other
b. What is the steepest slope on the site (approximate percent slope)?
50fJ0
c. What general types of soils are found on the site (for example, clay, sand, gravel, peat,
muck)? If you know the classification of agricultural soils, specify them and note any
agricultural land of long-term commercial significance and whether the proposal results in
removing any of these soils.
The site generally consists of glacial till soils (sandy and silty soils).
SEPA Environmental checklist (WAC 197-11-950) July 2016 Page 2 of 12
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so,
describe. The geotechnical report has not indicated any signs or history unstable soils in
the immediate vicinity of the project,
e. describe the purpose, type, total area, and approximate quantities and total affected area of
any filling, excavation, and grading proposed. Indicate source of fill.
This project pproposes approximately 2,000 cubic yards of cut and 12,000 cubic yards of till, resulting in a net of
approximately 10.000 cubic yards of fill. These quantilies may adjust during final civil en ineering.
f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe.
Erosion is a potential result of clearing and construction related to the proposed project.
g. About what percent of the site will be covered with impervious surfaces after project
construction (for example, asphalt or buildings)?
Approximately 60%
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any:
The project proposal includes a TESL plan with hest management practices mitigating
erosion risks.
2. Air hf elpl
a. What types of emissions to the air would result from the proposal during construction,
operation, and maintenance when the project is completed? If any, generally describe and
give approximate quantities if known. Odors and greenhouses gases typical of constfuction equipment may be expected.
The project does not olherwise propose any increase in emissions compered to the
ex 1
stIna conditions following cpnstruc#ion.
b. Are there any off -site sources of emissions or odor that may affect your proposal? If so,
generally describe.
No off -site sources of emissions or odor are known that will affect this project.
c. Proposed measures to reduce or control ernissions. or other impacts to air, if any:
No measures are proposed.
3. Water if elpl
a. Surface Water: hf e
1) Is there any surface water body on or in the immediate vicinity of the site (including
year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe
type and provide names. If appropriate, state what stream or river it flows into.
No surface water is on or in the immediate vicinity of the site.
2) Will the project require any work over, in, or adjacent to (within 200 feet) the described
waters? If yes, please describe and attach available plans.
No work is proposed in, over, or adjacent to nearby surface waters as part of this
project.
3) Estimate the amount of fill and dredge material that would be placed in or removed
from surface water or wetlands and indicate the area of the site that would be affected.
Indicate the source of fill material.
No filling or dredging is proposed as a part of this project.
4) Will the proposal require surface water withdrawals or diversions? Give general
description, purpose, and approximate quantities if known.
No surface water withdrawals or diversions are proposed as a part of this
project.
SEPA Environmental checklist (WAC 197-11-950) July 2016 Page 3 of 12
5) Does the proposal lie within a 100-year foodplain? If so, note location on the site plan.
The site is not within a 100 year floodplain.
6) Does the proposal involve any discharges of waste materials to surface waters? If so,
describe the type of waste and anticipated volume of discharge.
No discharge of waste materials to surface waters is proposed as a part of
this project.
b. Ground Water: hf gM
1) Will groundwater be withdrawn from a well for drinking water or other purposes? If so,
give a general description of the well, proposed uses and approximate quantities
withdrawn from the well. Will water be discharged to groundwater? Give general
description, purpose, and approximate quantities if known.
No groundwater withdrawals are anticipated as a part of this project.
2) Describe waste material that will be discharged into the ground from septic tanks or
other sources, if any (for example: Domestic sewage; industrial, containing the
following chemicals... ; agricultural; etc.). Describe the general size of the system, the
number of such systems, the number of houses to be served (if applicable), or the
number of animals or humans the systern(s) are expected to serve.
No waste material discharge to ground waters is proposed or anticipated as
a part of this project.
c. Water runoff (including stormwater)-
1) Describe the source of runoff (including storm water) and method of collection
and disposal, if any (include quantities, if {mown). Where will this water flow?
Will this water flow into other waters? If so, describe.
Stcrmwater runoff will be collected by catch basins in the proposed ROW and
conveyed to a combination wetpool-detention pond before being discharged to
municipal downstream conveyance,
2) Could Vtiraste materials enter ground or surface waters? If so, generally describe.
Waste materials are not anticipated to enter ground or surface waters as a part
of this project.
3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If
so, describe. Runoff currently drains to the existing ROW on 152nd Ave and 154nd Ave
and to the neighboring property to the southwest. Proposed drainage will
convey runoff to the municipal conveyance system to the southeast.
d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage
pattern impacts, if any: The project proposed to capture, detain, and treat stormwater runoff per
Washington State Department of Ecology requirements as implemented by the
City of Renton. A combination wetpool -detention pond is proposed to provide
4. Plants hf clot required flow control and water quality treatment.
a. Check the types of vegetation found an the site:
SEPA Environmental checklist (WAC 197-11-950) July 2016 Pago 4 of 12
X deciduous tree: alder, maple, aspen, other
X evergreen tree: fir, cedar, pine, other
X shrubs
X grass
pasture
crop or grain
Orchards, vineyards or other permanent crops.
wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
water plants: water lily, eelgrass, milfoil, other
other types of vegetation
b. What kind and amount of vegetation will be removed or altered?
Selective alteration or removal of vegetation will occur for the construction of roads and dwellings- Trees
will be retained pursuant to the applicable Cade requirements. New vegetation will be planted and the
removal of invasive or noxious plants will occur.
o. List threatened and endangered species known to be on or near the site.
No threatened or endangered species are known to be on or near the site.
d. Proposed landscaping, use of native plants, or other measures to preserve or enhance
vegetation on the site, if any:
Proposed landscaping may include the use of native or drought resistant plants. Invasive species
found on site will be removed to enhance existing and planted vegetation. Please reference the
Landscaping Plan submitted with this development proposal.
e. List all noxious weeds and invasive species known to be on or near the site.
Per WSDA Noxious Weed Data Viewer, Tansy Ragwort have been reported
within five hundred feet of the project site.
5. Animals hl elol
a. List any birds and other animals which have been observed on or near the site or are known
to be on or near the site.
Examples include:
birds: k heron, eagle, son b' , otter:
mammals: ee bear, elk, beaver, other:
fish: bass, salmon, trout, herring, shelli±lsh, other
b. List any threatened and endangered species known to be on or near the site.
There are no known threatened or endangered species known to be on the site.
c. Is the site part of a migration route? If so, explain.
The site is within the broad migratory bird Pacific Flyway. However, the project itself is not a
known congregation area for migratory birds.
d. Proposed measures to preserve or enhance wildlife, if any:
To help preserve and enhance wildlife, the project is proposing to meet the required tree
retention and landscaping requirements to support animal species in the area.
e. List any invasive animal species known to be on or near the site.
Acne known although rodent species may be present.
SEPA Environmental checklist (WAC 197-11-950) July 2016 Pago 5 of 12
6. Energy and Natural Resources Lhel
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet
the completed projects energy needs? Describe whether it will be used for heating,
manufacturing, etc.
The site currently uses electricity and natural gas, and will continue to use
these energy sources.
b. Would your project affect the potential use of solar energy by adjacent properties?
If so, generally describe.
This project is not anticipated to affect the potential use of solar energy
by adjacent properties.
c. What kinds of energy conservation features are included in the plans of this proposal?
List other proposed measures to reduce or control energy impacts, if any:
Future homes will include high -efficiency Energy Star appliances and furnaces, waste reducing
engineered lumber packages, low VOC paints, amended soil in landscaping, water saving water fixtures.
7. Environmental Health t•,f elal
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk
of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal?
If so, describe.
1 j ❑escribe any known cr possible contamination at the site from present or past uses.
There are no known sources of contamination at the site.
2) Describe existing hazardous chemicals/conditions that might affect project development
and design. This includes underground hazardous liquid and gas transmission pipelines
located within the project area and in the vicinity.
There are no known hazardous chemicals/conditions that cou;d affect development
at the site.
3) Describe any toxic or hazardous chemicals that might be stored, used, or produced
during the project's development or construction, or at any time during the operating
life of the project. Construction activity is likely to store combustible liquids, oxidizing materials, and
potentially corrosives during construction. No toxic or hazardous chemleal use is
anticipated on the developed site foilowin construction.
4) Describe special emergency services that might be required.
No special emergency services are anticipated.
5) Proposed measures to reduce or control environmental health hazards, if any:
Construction activity will employ best practices for material handling
and spill prevention and control.
b. Noise
1 j What types of noise exist in the area which may affect your project (for example:
traffic, equipment, operation, other)? Traffic nelse on 152nd Ave and 154th Ave may affect
the development.
2) What types and levels of noise would be created by or associated with the project on a
short-term or a long-term basis (for example: traffic, construction, operation, otbeO? Indi-
cate what hours noise would come from the siteThe site will generate increased noise typical of construction activity
during construction. Long-term residential noise levels could marginally
increase with the increased use of the property-
3) Proposed measures to reduce or control noise impacts, if any:
Construction activity will be limited to daytime hours, as allowed by City code.
SEPA Environmental checklist (NAC 197-11-950) July 2016 Page 6 of 12
8. Land and Shoreline Use hf elgi
a. What is the current use of the site and adjacent properties? Will the proposal affect current
land uses on nearby or adjacent properties? If so, describe.
The site currently has a single-family residential use, and this use will be maintained after project
construction. Therefore, no affect on adjacent land uses is anticipated.
b. Has the project site been used as working farmlands or working forest lands? If so, describe.
How much agricultural or forest land of long-term commercial significance will be converted to
other uses as a result of the proposal, if any? If resource lands have not been designated,
haw many acres in farmland or forest land tax status will be converted to nonfarm or
nonforest use?
The project site has not been known to have been used as working farmlands or
forestlands in the past 20 years.
1) Will the proposal affect or be affected by surrounding working farm or forest land normal
business operations, such as oversize equipment access, the application of pesticides,
tilling, and harvesting? If so, haw.
No surrounding working farm or forest land will be affected by this proposal_
c. Describe any structures on the site.
On the SE lot, there is a 1979 Olenbrook CIICI 59/36 Double -Wide, a 24x38 barn built in 1988, and
freestanding car cover. On the NW lot, there is a single story, single family home built in 1987,
d. Will any structures be demolished? If so, what?
All existing structures to be demolished.
e. What is the current zoning classification of the site?
Single family residential (R-4)
What is the current comprehensive plan designation of the site?
The site is located within the East Plateau Community Planning Area_
g. If applicable, what is the current shoreline master program designation of the site?
Not applicable.
h. Has any part of the site been classified as a critical area by the city or county? If so, specify.
No critical areas are designated on site.
i. Approximately how many people would reside or work in the completed project?
The project proposes 12 single family homes with an average of 2.3 residents per
home, results in approximately 28 residents of the development.
j. Approximately how many people would the completed project displace?
Approximately three current residents will be displaced for construction of the proposed
project.
k. Proposed measures to avoid or reduce displacement impacts, if any:
No measures are proposed.
SEPA Environmental checklist (WAC 197-11-950) July 2016 Pago 7 of 12
L. Proposed measures to ensure the proposal is compatible with existing and projected land
uses and plans, if any:
The project will be reviewed through a preliminary plat process by the City at
Renton for compliance with existing and project land uses and plans.
m. Proposed measures to reduce or control impacts to agricultural and forest lands of long-term
commercial significance, if any:
No measures are proposed_
0. Housing hf e1o1
a_ Approximately haw many units would be provided, if any? Indicate whether high, mid-
dle, or low-income housing.
Approximately 12 market -rate, single-family homes will be provided,
b. Approximately how many units, if any, would be eliminated? indicate whether high,
middle, or low-income housing.
The 2 existing single-family homes on site will be eliminated. These homes are
market -rate units.
c. Proposed measures to reduce or control housing impacts, if any:
None are proposed.
10. Aesthetics hf glpl
a. What is the tallest height of any proposed structure(s), not including antennas; what is
the principal exterior building material(s) proposed?
No proposed structures will exceed 32-feet in height. The proposed exterior building
material will be fibrous cement siding,
b. What views in the immediate vicinity would be altered or obstructed?
Views along 152nd Ave SE and 154th Ave SE will be altered following project construction_
b. Proposed measures to reduce or control aesthetic impacts, if any:
None are proposed.
11. Light and Glare ht elol
a. What type of light or glare will the proposal produce? What time of day would it mainly
occur?
The project will continue to produce Eight and glare from window reflections, site lighting, car headlights,
and other uses typical of single-family homes. Additional light will typically be produced at night.
b. Could light or glare from the finished project be a safety hazard or interfere with views?
Light or glare from the finished project is not anticipated to be a safety hazard or
interfere with views.
c. What existing off -site sources of light or glare may affect your proposal?
No off -site sources of light or glare are anticipated to affect the proposal.
d. Proposed measures to reduce or control light and glare impacts, if any:
None are proposed.
SEPA Environmental checklist (NAC 197-11-950) July 2016 Pago 8 of 12
12. }recreation �,t elal
a. What designated and informal recreational opportunities are in the immediate vicinity?
The proposed project is less than 1000 feet to the southeast of Renton's
Maplewood Park.
b. Would the proposed project displace any existing recreational uses? If so, describe.
No recreational uses will be displaced by this project,
c. Proposed measures to reduce or control impacts on recreatlon, including recreation
opportunities to be provided by the project or applicant, if any:
None are proposed.
13. Historic and cultural preservation hf e
a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years
old listed in or eligible for listing in national, state, or local preservation registers ? If so,
specifically describe.
No historic buildings or structures are known to be on site. A single family
dwelling that was constructed in 1967 was identified on a nearby property.
b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation?
This may include human burials or old cemeteries. Are there any material evidence, artifacts,
or areas of cultural importance on or near the site? please list any professional studies
conducted at the site to identify such resources.
No landmarks, features, or other evidence of Indian or historic use or occupation
are known to be on or near the site.
c. describe the methods used to assess the potential impacts to cultural and historic resources
on or near the project site. Examples include consultation with tribes and the department of
archeology and historic preservation, archaeological surveys, historic maps, G I S data, etc.
The Washington State Department of Archaeology ct Historic Preservation
(DAHP)'s WISAARD inventory was consulted.
d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance
to resources. Please include plans for the above and any permits that may be required.
None are proposed_
14. Transportation hf el
a. Identify public streets and highways serving the site or affected geographic area and
describe proposed access to the existing street s stem. Shaw on site plans it any.
The site is currently accessed by 152nd Ave S� and 154th Ave SE from the west and east respectively. As
required by the City of Renton, the project proposes to connect SE 139th PI to SE 51h PI east -west and to
construct 153rd Ave SE to a dead end at the north property line_
b. Is the site or affected geographic area currently served by public transit? If so, generally
describe. If not, what is the approximate distance to the nearest transit stop?
The site is not currently served by transit and the nearest bus stop is approximately 1.2
miles away.
c. How many additional parking spaces would the completed project or non -project proposal
have? How many would the project or proposal eliminate?
The site would add approximately 12 public parking spaces in the right-of-way and approximately 12 private
parking spaces. The project would eliminate approximately 4 existing private parking spaces.
SEPA Environmental checklist (WAC 197-11-950) July 2016 Pago $ of 12
d. Will the proposal require any new or improvements to existing roads, streets, pedestrian,
bicycle or state transportation facilities, not including driveways? If so, generally describe
(indicate whether public or private).
The proposal requires extension of 5E 139th PI and Construction of 153rd Ave SE, both of
which include sidewalks and planter strips as part of frontage improvements.
e. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or air
transportation? If so, generally describe.
The project does not propose any water, rail, or air transportation use.
f. How many vehicular trips per day would be generated by the completed project or proposal?
If known, indicate when peak volumes would occur and what percentage of the volume would
be trucks (such as commercial and nonpassenger vehicles). What data or transportation
models were used to make these estimates?
Approximately 104 additional daily trips are anticipated to be generated by the proposed project. Eight
additional AM Peak and 10 additional PM Peak trips as estimated based on the Institute of Transportation
Engineers Trip Generation Manual (11 th Ed). The percentage of trucks is not known.
g.1Ni11 the proposal interfere with, affect or be affected by the movement of agricultural and
forest products on roads or streets in the area? If so, generally describe.
No impact is anticipated.
h. Proposed measures to reduce or control transportation impacts, if any:
None are proposed,
15. Public Services hf el l
a. Would the project result in an increased need for public services (for example: fire protection,
police protection, public transit, health care, schools, other)? If so, generally describe.
Yes, additional public services have been confirmed as available for this project by the
City of Renton.
b. Proposed measures to reduce or control direct impacts on public services, if any.
Impact fee are required at rates dictated by the City of Renton.
16. Utilities hf eM
a. Circle utilities curr
ectricity, natural gas, water, refuse service, telephone, sanitary sewer, septic
other
b. Describe the utilities that are proposed for the project, the utility providing the service,
and the general construction activities on the site or in the immediate vicinity which might
be needed.
The project will extend new storm water, sewer, and electrical services from the
adjacent frontages. A City of Renton sewer main will be rerouted from a private
easement along the north property line to the new SE 139th PI right-of-way.
SEPA Environmental checklist (WAC 197-11-950) July 2016 Page 10 of 12
C. Signature HELP
The above answers are true and complete to the best of my knowledge. I understand that the
lead agency is relying on there to make its decision.
Signature:
Tire
Name of signee Tim Prusa
Position and Agency/Organization Design Engineer KPFF Consulting Engineers
Date Submitted: March 18, 2022
D. Supplemental sheet for nonproject actions HELP
(IT IS NOT NECESSARY to use this sheet for project actions)
Because these questions are very general, it may be helpful to read them in conjunction
with the list of the elements of the environment.
When answering these questions, be aware of the extent the proposal, or the types of
activities likely to result from the proposal, would affect the item at a greater intensity or
at a faster rate than V the proposal were not implemented. Respond briefly and in
general terms.
1. How would the proposal be likely to increase discharge to water; emissions to air; pro-
duction, storage, or release of toxic or hazardous substances; or production of noise?
Proposed measures to avoid or reduce such increases are:
2. How would the proposal be likely to affect plants, animals, fish, or marine life?
Proposed measures to protect or conserve plants, animals, fish, or marine life are:
3. How would the proposal be likely to deplete energy or natural resources?
Proposed measures to protect or conserve energy and natural resources are:
4. How would the proposal be likely to use or affect environmentally sensitive areas or
areas designated (or eligible or under study) for governmental protection; such as parks,
SEPA Environmental checklist (WAC 197-11-950) July 2016 Page 11 of 12
wilderness, wild and scenic rivers, threatened or endangered species habitat, historic or
cultural sites, wetlands, floodplains, or prime farmlands?
Proposed measures to protect such resources or to avoid or reduce impacts are:
5. How would the proposal be likely to affect land and shoreline use, including whether it
would allow or encourage land or shoreline uses incompatible with existing plans?
Proposed measures to avoid or reduce shoreline and land use impacts are:
5. How would the proposal be likely to increase demands on transportation or public
services and utilities?
Proposed measures to reduce or respond to such demand(s) are;
T. Identify, if possible, whether the proposal may conflict with local, state, or federal laws or
requirements for the protection of the environment.
SEPA Environmental checklist (WAC 197-11-950) July 2016 Page 12 of 12