Loading...
HomeMy WebLinkAboutEX23_P_StreetSection_v32:1 MAX 5.0' SIDEWALK 8.0' LANDSCAPING 10.0' TRAVEL LANE 10.0' TRAVEL LANE 3.0' SLOPE TO EX GRADE 5.0' SIDEWALK 8.0' LANDSCAPING 13.0' TRAVEL LANE 13.0' TRAVEL LANE 5.0' SIDEWALK 8.0' LANDSCAPING 13.0' TRAVEL LANE 13.0' TRAVEL LANE 8.0' LANDSCAPING 5.0' SIDEWALK 13.0' A C2.0 SE 5TH PL - SECTION (WEST) SCALE: 1"=5' C C2.0 153RD AVE SE - SECTION SCALE: 1"=5' B C2.0 SE 5TH PL - SECTION (EAST) SCALE: 1"=5' ROW ROW ROW ROW ℄ ⅊ ⅊ ℄ ℄ 26.5'26.5' 23.5'13.5'26.5'26.5' 2.0%2.0%1.5% 2.0%2.0%1.5% 2.0%2.0%1.5%1.5% 53.0' 53.0' - 56.0' (VARIES) 37.0' CEMENT CONCRETE SIDEWALK PER COR STD DET 102 CEMENT CONCRETE TRAFFIC CURB AND GUTTER PER COR STD DET 101 (TYP) D C2.0 152ND AVE SE - SECTION SCALE: 1"=5' E C2.0 154TH AVE SE - SECTION SCALE: 1"=5' 16.5' TRAVEL LANE 8.0' LANDSCAPING 5.0' SIDEWALK ROW ℄30.0' 2.0%1.5% 60.0' ROW 16.5' TRAVEL LANE 8.0' LANDSCAPING 5.0' SIDEWALK ROW ℄30.0' 1.5% 60.0' ROW CEMENT CONCRETE SIDEWALK PER COR STD DET 102 (TYP) CEMENT CONCRETE TRAFFIC CURB AND GUTTER PER COR STD DET 101 (TYP) CEMENT CONCRETE SIDEWALK PER COR STD DET 102 CEMENT CONCRETE TRAFFIC CURB AND GUTTER PER COR STD DET 101 (TYP) CEMENT CONCRETE SIDEWALK PER COR STD DET 102 4" ATB 6" CRUSHED ROCK SUBGRADE PREPARATION PER RECOMMENDATIONS OF THE GEOTECHNICAL REPORT BY THE RILEY GROUP, DATED JUNE 4, 2021 CEMENT CONCRETE TRAFFIC CURB AND GUTTER PER COR STD DET 101 CEMENT CONCRETE SIDEWALK PER COR STD DET 102 4" ATB 6" CRUSHED ROCK SUBGRADE PREPARATION PER RECOMMENDATIONS OF THE GEOTECHNICAL REPORT BY THE RILEY GROUP, DATED JUNE 4, 2021 CEMENT CONCRETE TRAFFIC CURB AND GUTTER PER COR STD DET 101 0.5'0.5' 0.5'0.5'0.5'0.5' 0.5'0.5' 2" CLASS 1/2 HMA 4" ATB 6" CRUSHED ROCK SUBGRADE PREPARATION PER RECOMMENDATIONS OF THE GEOTECHNICAL REPORT BY THE RILEY GROUP, DATED JUNE 4, 2021 4" ATB 6" CRUSHED ROCK SUBGRADE PREPARATION PER RECOMMENDATIONS OF THE GEOTECHNICAL REPORT BY THE RILEY GROUP, DATED JUNE 4, 2021 2" CLASS 1/2 HMA 2" CLASS 1/2 HMA 4" ATB 6" CRUSHED ROCK SUBGRADE PREPARATION PER RECOMMENDATIONS OF THE GEOTECHNICAL REPORT BY THE RILEY GROUP, DATED JUNE 4, 2021 2" CLASS 1/2 HMA 2.0% 2" CLASS 1/2 HMA NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com R Call 811two business daysbefore you dig CITY OF RENTON IN COMPLIANCE WITH CITY OF RENTON STANDARDS MAPLE HIGHLANDS 13818 152ND AVE SE RENTON, WA 98059TED-XX-XXXX07/08/2022 10MAPLE HIGHLANDSLUA22-000122C22-XXXXXXPR22-XXXXXXC5.0STREET CROSS SECTIONS 6 10/31/2022