Loading...
HomeMy WebLinkAboutMFP23000072.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP23000072 IVR Number: 23000072 Permit Information Permit Name: Puget Sound Energy Gas Permits Address/Location:01/04/2023Application Date:0423059155Parcel Number: 3123 NE SUNSET BLVD Permit Type:01/17/2023Issue Date:Franchise Permit Work Class:01/17/2024Expiration Date:Minor Utility Job Number: 109147925Franchise Type:Natural Gas Description: PSE Gas CREW TO INSTALL 1 1/4" PE COMMERCIAL ALTERED SERVICE AT MAIN, APPROX 36' IN ROW. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX INFRASOURCE SVCS B: (206) 949-5846Contractor Business License Number: 36742Construction Contractor: INFRASL871C2 Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering INFRASOURCE, INC 6905 S 228TH ST KENT, WA 98032 PLEASE SEE ATTACHED 109147925 3123 NE SUNSET BLVD Jason Schaefer 425-320-6926 MFP23000072 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 1/17/2023 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG TEMPORARY TRAFFIC CONTROL PLAN VICINITY MAP Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 12/22/2022 109147925 0 3123 NE SUNSET BLVD, Renton, WA 98056. Yuriy Bashtovoy (425) 424-6658 Yuriy.Bashtovoy@pse.com 1 OF 3 Puget Sound Energy Traffic Control Supervisor:Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 ”” – WSDOT NOTES & TABLES N WORK AREA 10 10 10 10 10 10 101011111111 1011111111NE SUNSET BLVD 18182211115 13 11 10171710 10 10 1010 10 10 1011 11 12 11 111717 1818LYNNWOOD AVE NEMONROE AVE NENE 12TH STNE 12TH STKIRKLAND AVE NENE SUNSET BLVDKIRKLAND AVE NEKIRKLAND AVE NE©1818LYNNWOOD AVE NE 10 TM A ARRW-BRD RIGHT LANE CLOSEDAHEAD W20-5RW4-2RROADWORK AHEAD W20-1X'X'X'RIGHT LANECLOSEDAHEADW20-5RW4-2RROADWORKAHEADW20-1 X'X'X'RIGHT LANECLOSEDAHEADW20-5RW4-2RROADWORKAHEADW20-1X'X'X'ROADWORKAHEADW20-1ROADWORKAHEADW20-1ROADWORKAHEADW20-1 X'NE S U N S E T B L VD ROADWORKAHEADW20-1 X'OTHER S ID ES/W C LOSE D S/WCLOSEDR9-9THE CREW SHALL CEASEWORK FOR A FLAGGER/SPOTTERTO ESCORT PEDESTRIANSAROUND THE WORK AREAN E SUN S E T B L V D©ROADWORKAHEADW20-1X'1111111111TEMPORARY TRAFFIC CONTROL PLAN0'70'35'PRINT ON11X17" SHEETS ONLYNSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV12/22/2022 1091479250 3123 NE SUNSET BLVD, Renton, WA 98056.Yuriy Bashtovoy(425) 424-6658Yuriy.Bashtovoy@pse.com2 OF 3Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--84028" TRAFFIC CONELEGENDWORK PITTRAFFIC FLOWSIGN LOCATIONFLAGGERUNIFORMEDPOLICE OFFICERPOLICESTOPCHEVRONARROW BOARDWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYMATCHLINEAANotes:1. All signs and spacing to conform to theMUTCD and City of RENTON standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.8. Work area will be from 192' NCL to 212' NCL ofNE 12TH ST & 36'-38' ECL of NE SUNSET BLVD.MATCHLINEAASEE SHEET 1FOR WSDOTNOTES & TABLESSSEE SHEET 3FOR PEDESTRIANBYPASS DETAILSMFP23000072 5'8'Cold Mix5' x 8'steel plate3/4"-1" thick,non-skidmaterialcold mixcold mixnon-skid plateSIDEWALKCLOSEDSIDEWALKCLOSEDCrew will create pedestrian/wheelchair ADA compliant rampsand assist pedestrians aroundwork area.TYPICAL CONFIGURATIONFOR PEDESTRIAN AND BIKEDIVERSION FOR SIDEWALK ORWALKWAY CLOSURES (OUTSIDE)5' MiniumumCrew will create pedestrian/wheelchair compliant rampsand assist pedestrians aroundwork area.Add additional conesfor safetySIDEWALKCLOSEDR9-9SIDEWALKCLOSEDR9-9 TYPICAL CONFIGURATIONFOR PEDESTRIAN AND BIKEDIVERSION FOR SIDEWALK ORWALKWAY CLOSURES (INSIDE)curb fa ceLevel Landingfrom Sidewalk to curb edgenon-skid materialLevel Landingfrom Ramp ontostreet surfacenon-skid materialRamp Surface ADA compliant (12:1 slope)non-skid material (crew will assist)Stabilized material forfull ramp support12:1 slope4' M in imum 6" Min ADA compliantdetectable strip28" TRAFFIC CONELEGENDWORK PITTRAFFIC FLOWSIGN LOCATIONFLAGGERUNIFORMEDPOLICE OFFICERPOLICESTOPCHEVRONARROW BOARDWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYNotes:1. All signs and spacing to conform to theMUTCD and City of RENTON standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.8. Work area will be from 192' NCL to 212' NCL ofNE 12TH ST & 36'-38' ECL of NE SUNSET BLVD.SEE SHEET 1FOR WSDOTNOTES & TABLESSTEMPORARY TRAFFIC CONTROL PLANProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV12/22/2022 1091479250 3123 NE SUNSET BLVD, Renton, WA 98056.Yuriy Bashtovoy(425) 424-6658Yuriy.Bashtovoy@pse.com3 OF 3Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425MFP23000072 Service Address: City Zip: Site Contact:Phone: Site Contact Email: Est. Start Date: Customer Email: & & & & & Q205.084 of CL of CL 3 X 5 X 3 of CL of CL of CL 192'North of CL NE 12th ST 38'East of CL NE SUNSET BLVD PM / Inspector: kidzresearch@hotmail.com 98056 Phone:650-575-9922 Puget Sound Energy Gas Pre-Inspect Form 12/21/22Date: 109147925Job #: RENTON 3123 NE SUNSET BLVD Marc Foster 360-350-2120 marc@oakhillsbuilds.com Phone:(425) 320-6926Jason Schaefer 212'North Surface Type GRS C/SW Size of Cut of CL NE 12th ST 36'East of CL NE SUNSET BLVD 3 X 5 X 3 of CL Work Location Yes Altered Com Main or Svc Service Information Street Information 1-1/4" PE 9999552 Del Press:6" W.C.Traffic Signal:Bus Stop:No KNT FLT - KentBollards:2.5" #4" #ADA Ramps #:0 Route #'s: Meter Loc:Trolley Lines:No Mtr Hoods #:002 - OFL A425 MDPE - 4" IPS - (DIA) 1"CTS PLAT Map: N EFV:1-1/4" - 2600 - 9996744 Police #:0 TCP:Yes Tie-In Fitting Meter:Speed Limit:25 No Parks #:0 Job Type Diameter:Flaggers #:0 Arterial: RENTON YesROW Permit: Jurisdiction: Project Scope: Install 1-1/4" PE commercial altered serivce 56' (36' SCAT STUB + 20' PLAT EXT), set an A425 mtr. Est. Duration: Yes Job Description New Construction: Construction Method Building Foundation Type Septic System 2 Days (16 Hours) No Crawl Space Hole Hog A425 CL 5'3' PL NE 12th ST CL Proposed 1-1/4" PE SVC 20' 1,500 SQ FT WORK AREA 5' 3' MFP23000072 POTHOLE ALL EXISTING UTILITIES RESTORATION PER CITY OF RENTON STANDARDS 3218 3224 3123 3155 3011NE SUNSET BLVDNE 12TH ST4" MPE 36'E4" PE-B IP 38'E 77E2324" MPE IP 213'N 109096620-2018 4" STW IP 3'W 5179-19634" STW IP 4'W 109125902-2019DEACT 2" PE-A 37'W 812-2862" STW IP 18'W 981-19582" STW IP 18'S 981-1958 2" STW IP 18'S 981-1958 2" STWI IP 18'S 981-1958 234'N 18'S 21'N 3 T F 2'WTFT F 25'S,32'E@PL28'N 15 9 ' N 96'N 22 9 ' E 31'E183'E1 1/4"5/8 133'S 1 1/ 8 " 159'N 5/8" PE1992 1 1/4" MPE1998 5/8" PE1991 235'N 45° 26'S&16'W ROPES80'ET L 14'WTL159'N TL24'S TLT L T 215'N 39'S 22'S 18'N 1'W17'W2' V.O.21'N,10'W 205'NT 19'N P21' N T 16'W25'S 23'S T T T 238'NPT 212'N 24'S B 20'N 28' N B S P 33'E213'NB P 31'E6" Casing D2305E040, R2305E015, A2305E015S204080, Q205084 The information on the attached maps is subject to change without notice. Puget Sound Energy makes no warranty, expressed or implied, concerningthe suitability of this information for any purpose. Recipient agrees to not disclose this confidential information to any other person or entity,unless authorized in writing by Puget Sound Energy. This map is not to be used for determining the actual location of any PSE facilities (call 811).“ 12-21-2022 Scale 1:570 Lat\Long=47.5034, -122.1767 MFP23000072