Loading...
HomeMy WebLinkAbout0895.06 S 12282022.pdfEarth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com FIELD REPORT Project No. 0895.06 Page 1 of 3 Report ID 0895.06 S 12282022 Date Wed 12/28/2022 Weather 50°F, Cloudy Arrival/Departure Time(s) 12:00pm-12:45pm Travel Time (hr) 1.00 Project Name Weatherly Inn Location 4500 Talbot Road S., Renton ESNW Rep., CESCL No., Phone No. & Report Statement Christopher Halter, ECO-3-2072210, (206)-602-9915 “This report is true, accurate, and complete to the best of my knowledge and belief.” Client Info/Contact RJ Development | Jeff Bennett Permit No(s). WAR-307963 Reviewed By MLP Initials/Date N/A Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. Type of visit:  Weekly  Monthly  Post–Storm Event Precipitation since last inspection (approximate): 3.91 inches Precipitation in last 24 hours (approximate): 0.00 inches Phase of active construction (check all that apply):  Pre-construction  Clearing, demolition, or grading  Infrastructure or roads  Concrete pours  Vertical construction  Utilities  Off-site improvements  Site temporarily stabilized  Final stabilization Was water quality sampling part of this inspection?  Yes  No If “Yes”: • Record results in the table below. • Hanna Turbidity Meter No. 32 Monitoring Point Monitoring Location Turbidity (NTU) pH Description of Discharge Notes MP-1 Stormwater Vault Report ID 0895.06 S 12282022 Page 2 of 3 Earth Solutions NW, LLC Erosion Control BMPs (13 Elements) Overall Condition (Good; Fair; Poor) Needs Repair? (Yes; No) Comments 1. Preserve Vegetation; Mark Clearing Limits • Buffer Zones around Sensitive Areas • Silt Fence G N - Chain link fence installed along site perimeter. 2. Establish Construction Access • Fabric; Quarry Spalls • Wheel Wash • Sweeper Truck F N - Site entrance is paved. 3. Control Flow Rates • Stormwater Vault or Facility • Straw Wattles • Check Dams G N - Onsite stormwater vault is plugged. 4. Install Sediment Controls • Silt Fence • Straw Bale Barriers • Vegetation • Straw • Sediment Ponds, Traps & Filters • Treatment • Water Truck F N - Silt fence installed around majority of site perimeter. Partly down on SW corner. - Straw wattles placed along side of small slope near Talbot Rd S. 5. Stabilize Soils • Nets & Blankets • Mulch, Bark & Rock • Hydroseeding; Grass • Plastic Sheeting • Stockpiles F N - Much of site is paved, including entrance and parking areas. 6. Protect Slopes • Benching; Track-Walking • Pipe Slope Drains • Plastic Sheeting; Anchors - - N/A 7. Protect Drain Inlets • Catch Basin Inserts G N - CB inserts installed in offsite catch basins. 8. Stabilize Channels and Outlets • Channel Lining • Check Dam • Outlet Protection • Nets and Blankets - - N/A 9. Control Pollutants • Chemical Storage Area Covered • Concrete Handling G N -Chemical/material storage onsite. -Concrete washout is present onsite. 10. Control Dewatering G N - Via KC Sewer Discharge Permit as needed. 11. Maintain BMPs F N -Maintain BMP’s. 12. Maintain SWPPP & Site Logbook G N - Available upon request. 13. Protect Low-Impact Development (LID BMPs) • Bioretention Rain Garden Facilities • Permeable Pavement - - N/A Do existing BMPs need to be modified or removed, or do other BMPs need to be installed?  Yes  No List the action items in the table below: Element # Description and Location Action Required Completion Date Report ID 0895.06 S 12282022 Page 3 of 3 Earth Solutions NW, LLC BMP LEGEND STORMWATER VAULT SILT FENCE CONSTRUCTION ENTRANCE CHEMICAL/MATERIAL STORAGE CATCH BASIN INSERT CONCRETE WASHOUT