HomeMy WebLinkAboutEX_15_C_Advisory_NotesDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 2 LUA22-000424 ADVISORY NOTES TO APPLICANT The following notes are supplemental information provided in conjunction with the administrative land use action. Because these notes are provided as information only, they are not subject to the appeal process for the land use action. Planning: (Contact: Jill Ding, 425-430-6598, jding@rentonwa.gov) 1. RMC section 4-4-030.C.2 limits haul hours between 8:30 am to 3:30 pm, Monday through Friday unless otherwise approved by the Development Services Division. 2. Commercial, multi-family, new single family and other nonresidential construction activities shall be restricted to the hours between seven o’clock (7:00) a.m. and eight o’clock (8:00) p.m., Monday through Friday. Work on Saturdays shall be restricted to the hours between nine o’clock (9:00) a.m. and eight o’clock (8:00) p.m. No work shall be permitted on Sundays. 3. Within thirty (30) days of completion of grading work, the applicant shall hydroseed or plant an appropriate ground cover over any portion of the site that is graded or cleared of vegetation and wh ere no further construction work will occur within ninety (90) days. Alternative measures such as mulch, sodding, or plastic covering as specified in the current King County Surface Water Management Design Manual as adopted by the City of Renton may be proposed between the dates of November 1st and March 31st of each year. The Development Services Division’s approval of this work is required prior to final inspection and approval of the permit. 4. A National Permit Discharge Elimination System (NPDES) permit is required when more than one acre is being cleared. 5. The applicant may not fill, excavate, stack or store any equipment, dispose of any materials, supplies or fluids, operate any equipment, install impervious surfaces, or compact the earth in any way with in the area defined by the drip line of any tree to be retained. 6. The applicant shall erect and maintain six foot (6') high chain link temporary construction fencing around the drip lines of all retained trees, or along the perimeter of a stand of retained trees. Placards shall be placed on fencing every fifty feet (50') indicating the words, “NO TRESPASSING – Protected Trees” or on each side of the fencing if less than fifty feet (50'). Site access to individually protected trees or groups of trees shall be fenced and signed. Individual trees shall be fenced on four (4) sides. In addition, the applicant shall provide supervision whenever equipment or trucks are moving near trees. Development Engineering: (Contact: Michael Sippo, 425-430-7298, msippo@rentonwa.gov) 1. See Attached Development Engineering Memo dated January 18, 2023 Fire Authority: (Contact: Corey Thomas, 425-276-9582, cthomas@rentonrfa.org) 1. Fire impact fees are applicable at the rate of $0.26 per square foot of commercial bank/offi ce space and $1.25 per square foot of retail space. No charge for gas station canopy. This fee is paid at time of building permit issuance. Credit will be granted for the area of total buildings removed. 2. The preliminary fire flow is 2,000 gpm. A minimum of one hydrant is required within 150 -feet of each structure and one additional hydrant is required within 300-feet of each structure. A water availability certificate is required from Soos Creek Water District. The water availability certificate that has been EXHIBIT 15 DocuSign Envelope ID: AA4FA6BA-AA72-4A92-A78C-D1916105F712 ADVISORY NOTES TO APPLICANT Page 2 of 2 LUA22-000424 provided is not sufficient as it only shows 1,000 gpm available. Existing fire hydrants that meet these criteria can be used to satisfy the requirements. 3. Approved fire alarm systems are required throughout all buildings of 3,000 square feet or more. Separate plans and permits required by the fire department. Fully addressable and full detection is required for the fire alarm system. Fire sprinklers are not required in the proposed buildings. 4. Fire department apparatus access roadways are required within 150 -feet of all points on the building. Fire lane signage required for the on-site roadways. Required turning radiuses are 25-feet inside and 45-feet outside. Roadways shall be a minimum of 20-feet wide. Roadways shall support a minimum of a 30-ton vehicle and 75-psi point loading. 5. Separate plans and permits are required to be submitted to and obtained from the Renton Regional Fire Authority for all new underground gasoline tanks and tank monitoring systems. Technical Services: (Contact: Amanda Askren, 425-430-7369, aaskren@rentonwa.gov) 1. None Community Services: (Contact: Erica Schmitz, 425-430-6614, eschmitz@rentonwa.gov) 1. None Police: (Contact: Cyndie Parks, 425-430-7521, cparks@rentonwa.gov) 1. See attached memo. Building: (Contact: Rob Shuey, 425-430-7235, rshuey@rentonwa.gov) 1. None DocuSign Envelope ID: AA4FA6BA-AA72-4A92-A78C-D1916105F712 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT M E M O R A N D U M DATE: 01/18/2023 TO: Jill Ding, Senior Planner FROM: Michael Sippo, Civil Engineer III, Plan Review SUBJECT: Benson & 176th Commercial Redevelopment 17426 108th Ave SE & 10810, 10828 SE Petrovitsky Rd LUA22-000424 I have reviewed for the Benson & 176th (Petrovitsky) project located at parcel(s) 292305-9017, 9095, and 9110. The following comments are based on the land-use application submittal made to the City of Renton by the applicant. EXISTING CONDITIONS The site is approximately 1.67 acres in size and is rectangular in shape with two lots fronting SE Petrovitsky Rd extending approximately 300 feet to the north with the parcel fronting both 108th Ave SE (Benson) and SE Petrovitsky Rd extending approximately 140 feet to the north. The site is relatively flat and contains a vacant gas-station and vehicle service building at the corner of the intersection and vacant buildings on the longer rectangular parcels. There is also an active cell- tower array located on one of the vacant parcels. As mentioned previously, the existing vacant commercial sites contain multiple buildings and is covered approximately 900 percent by impervious areas such as parking, buildings and service areas with the remainder grass and a treed areas located within the interior of the site’s existing lot lines. The site generally slopes from the east to west and runoff is collected by an existing onsite conveyance system and routed to the public conveyance systems on 108th Ave SE and SE Petrovitsky Rd. DocuSign Envelope ID: AA4FA6BA-AA72-4A92-A78C-D1916105F712 Benson Petrovitsky Redevelopment– LUA22-000424 1/18/2023 Page 2 of 10 WATER 1. The subject development is within the water service area of Soos Creek Water and Sewer District. 2. The site is located outside of an Aquifer Protection Area. SEWER 1. The subject development is within the water service area of Soos Creek Water and Sewer District. STORM 1. The site is located within the Black River – Panther Creek Drainage Basin and contains only minor regulated slopes along the north side of the property. The site topography slopes from the east to west. There is an existing unmapped conveyance system located on the 3 parcels that connect to the City’s conveyance system in SE Petrovitsky Rd and 108th Ave SE. There is an existing 12-inch stormwater main in SE Petrovitsky Rd south of the subject property frontage located along the north flowline of the existing roadway that flows from east to west into the intersection and continues north along 108th Ave SE. TRANSPORTATION 1. The proposed development fronts SE Petrovitsky Road (176th St SE) along the southern property lines of the development for a length of approximately 290 feet. SE Petrovitsky Road is a five lane Principal Arterial. Per the King County Assessor map, the existing half street ROW width on the site frontage is approximately 30 feet and contains flush 8’ sidewalks on both sides. 2. The proposed development fronts 108th Ave SE (Benson Road/ SR 515) along the western property line of the development for a length of approximately 140 feet. 108th Ave SE is a six lane Principal Arterial. Per the King County Assessor map, the existing half street ROW width on the site frontage is approximately 45 feet and contains flush 8’ sidewalks on both sides CODE REQUIREMENTS WATER 1. A water availability certificate from Soos Creek Water and Sewer District is required as part of the Land-Use Application. a. A Certificate of Water Availability dated 8/8/2022 was provided with the Land- Use Application. b. The Certificate of Water Availability notes that the “Water service will require and improvement to the water system of: Water main fronting south side of property along SE Petrovitsky Rd. Final water requirements and layout will be based on the final site development plan, road, storm, grading and fire marshal requirements.” DocuSign Envelope ID: AA4FA6BA-AA72-4A92-A78C-D1916105F712 Benson Petrovitsky Redevelopment– LUA22-000424 1/18/2023 Page 3 of 10 c. The Certificate of Water Availability notes that “Service is subject to the following: Other: Will require oil and water separator.” d. Renton Regional Fire Authority commented on January 6, 2023 that: “The preliminary fire flow is 2,000 gpm…The water availability certificate that has been provided is not sufficient as it only shows 1,000 gmp available”. Accommodation shall be made to ensure that the site contains the required fire flow prior to civil construction permit approval. 2. A copy of the approved water plan Error! Reference source not found. shall be provided to the City prior to approval of the Civil Construction Permit. a. The number and locations of fire hydrants shall be determined by the Renton Regional Fire Authority as part of the review of the project plans. 3. The site is located outside of an Aquifer Protection Area. SEWER 1. A sewer availability certificate from Soos Creek Water and Sewer District is required as a part of the Land-Use Application. a. A Certificate of Sewer Availability dated 8/9/2022 was provided with the Land- Use Application 2. A copy of the approved sewer plans from Error! Reference source not found. shall be provided to the City prior to approval of the Civil Construction Permit. a. The covered fuel pump dispensary areas shall be connected to an oil/water separator that drains to the sanitary sewer. b. A grease interceptor is required if there is a commercial kitchen. The grease interceptor shall be sized based on drainage fixture units in accordance with standards found in the latest edition of the Uniform Plumbing Code (UPC). The grease interceptor shall drain by gravity to the sewer main. c. The dedicated garbage/recycling area shall be covered and will be required to drain to an approved oil/water separator that drains to the sanitary sewer. 3. If any of the existing buildings on the site are served by private on-site septic systems, the septic systems shall be abandoned in accordance with King County Department of Health regulations and Renton Municipal Code. SURFACE WATER 1. The development is subject to a system development charge (SDC) for stormwater. The 2023 SDC for stormwater is $0.92 per square foot of new impervious surface area, but not less than $2,300.00. The fee that is current will be charged at the time of construction permit issuance. 2. A preliminary Drainage Plan and Technical Information Report (TIR), dated August, 2022, was submitted by Contour Engineering, LLC with the Land Use Application. Based on the City of Renton’s flow control map, the site falls under Flow Control Duration Standards (Forested Site Conditions) and is located within the Black River drainage basin. The development is subject to a Full Drainage Review in accordance with the 2022 Renton Surface Water Design Manual (RSWDM). All nine core requirements and the six special requirements have been discussed in the Technical Information Report. The detention, water quality and conveyance shall be designed in accordance with the RSWDM that is current at the time of the civil construction permit application. The applicant has DocuSign Envelope ID: AA4FA6BA-AA72-4A92-A78C-D1916105F712 Benson Petrovitsky Redevelopment– LUA22-000424 1/18/2023 Page 4 of 10 proposed to connect to the City of Renton’s storm drainage system located within 108th Ave SE. a. The development currently is showing a 27,000 cubic foot detention vault to meet the flow control requirement. During the review of the final TIR the applicant will need to ensure that flow control standards are being met as outlined in the 2022 RSWDM. b. The applicant is proposing to use the modular wetland in order for the project to meet the enhanced water quality requirements. The modular wetland is located within the parking lot downstream of the detention system prior to connecting into the City of Renton system located within 108th Ave SE. c. On-site BMPs satisfying Core Requirement #9 will be required for the site. On-site BMPs shall be evaluated in order of preference by feasibility as described in Section C.1.3 of the 2022 RSWDM. All targeted impervious area to the maximum extent feasible shall be conveyed to an On-site BMP. i. The applicant is not currently proposing any mitigation for the site based on the infeasibility criteria within the 2022 RSWDM. Final review of onsite BMP feasibility will be reviewed during the civil construction permit approval process. d. The following stormwater improvements are required and shall be discussed or revised within the TIR: i. All Core Requirements and Special Requirements must be evaluated within the TIR. The technical information report did not address Core Requirement #6 and shall be evaluated during the civil construction permit approval process. ii. The technical information report noted that “oil control is not required for this project, but an oil-water separator is provided for the runoff from the fuel pumps.” Per Special Requirement #5 of the 2022 RSWDM notes that if the proposed project develops a site that will have high-use characteristics then oil control must be met. Additionally, high-use road intersections are required to provide oil control. Since the site has an expected average daily traffic count equal to or greater than 100 vehicles per 1,000 square feet of gross building are and is subject to petroleum storage or transfer in excess of 1,500 gallons per year, oil control for the entire site is applicable. Also, City traffic studies from 2009 note that the ADT for the Benson- Petrovitsky intersection is 29,000 trips which exceeds the minimum of 25,000 trips meeting the definition of high-use intersection. The applicant shall evaluate utilizing oil controls per Special Requirement #5 during the civil construction permit approval process. These oil control facilities will be in addition to the oil control requirements of the covered fuel islands and garbage/recycling areas. 3. Storm drainage improvements along all public street frontages are required to conform to the City’s street and stormwater conveyance standards. Any new storm drain installed on or off-site shall be designed and sized in accordance with standards found in Chapter 4 of the 2022 RSWDM and shall account for the total upstream tributary area, assuming developed conditions for onsite tributary areas and existing conditions for any offsite tributary areas. DocuSign Envelope ID: AA4FA6BA-AA72-4A92-A78C-D1916105F712 Benson Petrovitsky Redevelopment– LUA22-000424 1/18/2023 Page 5 of 10 4. Effective June 22, 2022, the City of Renton has adopted the 2022 RSWDM, which is based on the 2021 King County SWDM. Under the new 2022 RSWDM stormwater requirements, on-site BMP sizing credits for modeling credits can no longer be used for privately maintained on-site BMPs, with the exception of full dispersion and full infiltration BMPs.” 5. A geotechnical report for the site was prepared by PanGEO, Inc. dated May 2019 and was provided with the land-use submittal. The report includes information concerning the soils, geology, drainage patterns, vegetation present, water table and soil permeability, with recommendations of appropriate on-site BMP options with typical designs for the site from the geotechnical engineer. a. The geotech report should indicates that the site contains a fill layer consisting of a few inches of gravel over sandy silt ranging from 2-1/2 to 4-1/2 feet. Below the fill layer is a highly impermeable weathered Vashon till and Renton formation of hard sandy silt with gravel below the till. Groundwater seepage was encountered in portions of the test pits and indicative of perched locations of water due to the perched till. i. Due to the native soils underlying the site consisting of Vashon till, a medium to very dense deposit comprised of clay, silt, sand, gravel, and perched groundwater, the report determines that infiltration is infeasible and non-infiltration alternatives should be considered to manage the surface runoff at the site. Staff concurs with this recommendation and will provide final review of infiltration options during the civil construction permit process. ii. Due to the presence of perched groundwater, the report recommends where seepage is encountered, the base of the excavation should be sloped to one or more shallow sump pits. Where loose soils are encountered in conjunction with groundwater seepage, remedial measure such as overexcavation of soft soils or tamping quarry spall into the base of the excavation may be required. 6. Erosion control measures and construction stormwater pollution prevention measures to meet the City requirements shall be proved for during the civil construction permit process. 7. A Construction Stormwater General Permit from Department of Ecology will be required since grading and clearing of the site exceeds one acre. A Stormwater Pollution Prevention Plan (SWPPP) is required for this site. 8. The current Surface Water Standard Plans shall be used in all drainage plan submittals. The current City of Renton Standard Details is available online in the City of Renton website. TRANSPORTATION 1. Street and frontage requirements: The proposed development site has frontage on SE Petrovitsky Road (176th St SE) and on 108th Ave SE ( Benson Road/ SR 515). a. SE Petrovitsky Road (176th St SE) is a five lane Principal Arterial. Per the King County Assessor map, the existing half street ROW width on the site frontage is approximately 30 feet. Per Renton Municipal Code (RMC) 4-6-060, the minimum ROW width required on a five lane principal arterial is 103 feet. DocuSign Envelope ID: AA4FA6BA-AA72-4A92-A78C-D1916105F712 Benson Petrovitsky Redevelopment– LUA22-000424 1/18/2023 Page 6 of 10 i. In 2013, the City’s Transportation Division prepared a preliminary corridor safety project to provide intersection improvements at the intersection of SE Petrovitsky Rd and S Benson Dr (SR 515). The safety plans require street frontage improvements that include an additional 11-feet wide right-turn only lane, a 0.5-foot wide curb, an 8-foot wide landscaped planter, a 12-foot wide ped/ bike path, 2-foot clear area from back of the path to the new ROW line and a pedestrian safety refuge island. The street and frontage section requires varying ROW dedication along the frontage of the 3 parcels. The ROW dedication width of approximately 33.5 feet (subject to final survey) in front of parcel 10810 SE Petrovitsky Road and varying ROW dedication of the frontages of parcels 17426 108th Ave SE and 10828 SE Petrovitsky Road are required to be provided by the developer. ii. The applicant has provided a street section showing and labelling the existing ROW line, centerline of ROW, ROW dedication, centerline of pavement, pavement width, showing and labelling all the street frontage elements and widths with the land use application. Staff concurs that this street section generally meets the intention of the corridor safety project and will review in detail during the civil construction permit process. iii. The applicant shall provide detailed design and survey information for the taper lane transition beyond the project’s eastern extent incoming to the right-turn lane. The design information shall include connections and rebuilding of the existing sidewalks to provide safe transitions and reconstruction of neighboring driveways meeting ADA requirements to the extent that the taper lane matches to existing improvements. iv. The City of Renton 2023-2028 Transportation Improvement Program, adopted October 3, 2022 identifies the Carr Rd Improvements as TIP candidate project #22-29 and extends through the intersection of Carr Rd/Petrovitsky and Benson Rd (https://cdn5- hosted.civiclive.com/UserFiles/Servers/Server_7922657/File/City%20Hall/ Public%20Works/Transportation%20Systems/Planning%20and%20Progra mming/Transportation%20Improvement%20Program%20(TIP)%202018- 2023/2023- 2028%20Transportation%20Improvement%20Program%20(TIP).pdf). The purpose of the project is to provide “improvements are necessary to enhance vehicle traffic capacity and safety for vehicles, bicycles, and pedestrians on this major east-west transportation corridor.” As such, the frontage improvements, or a portion thereof, may be eligible for credits to the transportation impact fees levied for the project. These credits will be determined prior to the issuance of the civil construction and building permits for the project based on cost estimates provided by the applicant and reviewed by the City Administrator. RMC 4-1-190 (J) outlines the criteria for awarding of credits for dedications, construction of improvements, and past tax payment. v. The access from SE Petrovitsky Rd will be restricted to right-in right-out only access (no left turns). C-curbing will be required to be provided on SE Petrovitsky Road to prevent left turns to and from the site access. Signage DocuSign Envelope ID: AA4FA6BA-AA72-4A92-A78C-D1916105F712 Benson Petrovitsky Redevelopment– LUA22-000424 1/18/2023 Page 7 of 10 shall be provided interior to the site and on the driveway approach across the street to the south indicating right-turn out only. vi. A minimum intersection radius of 35 feet is required at the intersection SE Petrovitsky Road (176th St SE) and on 108th Ave SE (Benson Road/ SR 515), however, the applicant shall provide detailed auto-turn analysis during the civil construction permit approval process demonstrating clearly that large trucks can negotiate the turn without driving onto the curb, crossing ramps and landscape strip. If the review shows deficiency, the radius shall be increased to accommodate the large vehicles and the site plan adjusted accordingly. vii. The Washington State Department of Transportation (WSDOT) provided comments during the land-use approval process. Primarily, the intersection of SE Petrovitsky Rd and Benson Rd/SR 515) lies within WSDOT’s jurisdiction for channelization and intersection control operations. An Intersection Control Evaluation shall be reviewed and approved by WSDOT prior to issuance of the civil construction permit. Any changes resulting from WSDOT’s review shall be implemented in the final civil construction design. A reduction in lane additions or elimination of the right-turn and acceleration lanes shall not preclude the need for the full right-of-way dedication as required in the sections above and below for the programmed implementation of the corridor safety project in the future. b. 108th Ave SE (Benson Road/ SR 515) - is a Principal Arterial. Per King County Assessor map, the existing half street ROW width on the site frontage is approximately 45 feet. Per Renton Municipal Code (RMC) 4-6-060, the minimum ROW width required on a six lane principal arterial is 113 feet. i. In 2013, the City’s Transportation Division prepared a preliminary corridor safety project to provide intersection improvements at the intersection of SE Petrovitsky Rd and S Benson Dr (SR 515). The safety plans require street frontage improvements that include an additional 11-feet wide acceleration lane, a 0.5-foot wide curb, an 8-foot wide landscaped planter, a 12-foot wide ped/ bike path, 2-foot clear area from back of the path to the new ROW line, and a pedestrian refuge safety island. ROW dedication of varying width is be required in front of parcel 2923059110 to accommodate these frontage improvements. The Transportation Division plan also includes driveway access for this parcel. ROW dedication and street frontage improvements are required to be provided by the developer. ii. The applicant has provided a street section showing and labelling the existing ROW line, centerline of ROW, ROW dedication, centerline of pavement, pavement width, showing and labelling all the street frontage elements and widths with the land use application. Staff concurs that this street section generally meets the intention of the corridor safety project and will review in detail during the civil construction permit process. iii. The applicant shall provide detailed design and survey information for the taper lane transition beyond the project’s northern extent past the acceleration lane. The design information shall include connections and DocuSign Envelope ID: AA4FA6BA-AA72-4A92-A78C-D1916105F712 Benson Petrovitsky Redevelopment– LUA22-000424 1/18/2023 Page 8 of 10 rebuilding of the existing sidewalks to provide safe transitions and reconstruction of neighboring driveways meeting ADA requirements to the extent that the taper lane matches to existing improvements. iv. The access from 108th Ave SE will be restricted to right-in right-out only access (no left turns). Signage shall be provided interior to the site indicating right-turn out only. v. The Washington State Department of Transportation (WSDOT) provided comments during the land-use approval process. Primarily, the intersection of SE Petrovitsky Rd and Benson Rd/SR 515) lies within WSDOT’s jurisdiction for channelization and intersection control operations. An Intersection Control Evaluation shall be reviewed and approved by WSDOT prior to issuance of the civil construction permit. Any changes resulting from WSDOT’s review shall be implemented in the final civil construction design. A reduction in lane additions or elimination of the right-turn and acceleration lanes shall not preclude the need for the full right-of-way dedication as required in the sections above and below for the programmed implementation of the corridor safety project in the future. 2. The proposed intersection corridor safety improvements shall, at a minimum, require the relocation of the traffic signal at the northeast corner of the SE Petrovitsky Rd/108th Ave SE intersection. a. The relocation will require that crosswalk striping and ADA upgrades be made to the opposing intersections, including, but not limited to receiving ramps, push button signals, underground conduits, utilities and junction boxes. b. A pedestrian actuated signal to cross the exclusive right-turn lane shall be installed between the sidewalk and pedestrian refuge island. 3. The applicant has requested a street modification in order to modify the ROW width and/or street cross sections for 108th Ave SE and SE Petrovitsky Rd. a. The City’s transportation group has determined and will support an alternative standard to match the established standard street sections for 108th Ave SE, SE Petrovitsky Rd and the intersection thereof as described in sections 1 & 2 above. b. Therefore, staff is in support of the requested modification. The following are conditions of the modification approval: i. Alternative cross-sections as noted in sections 1 & 2 above shall be implemented for the project pending final review and approval by City Development Engineering, Transportation Department and WSDOT during the civil construction permit approval process. ii. In the event that, at this time, the WSDOT review and approval process does not allow for the addition of the right-turn and acceleration lanes, the project shall dedicate right-of-way as described in section 1 above for the future programmed implementation of TIP Project #22-29. The traffic signal shall be moved to a location conducive to accommodating the addition of the right-turn and acceleration lanes. 4. On and off-site ADA (including the street frontages), curbing, sidewalk and parking lot/drive-aisle improvements will be reviewed in conjunction with the civil construction permit for the project and will require a grading plan consisting of spot elevations and slopes showing that ADA and City specifications are being met. DocuSign Envelope ID: AA4FA6BA-AA72-4A92-A78C-D1916105F712 Benson Petrovitsky Redevelopment– LUA22-000424 1/18/2023 Page 9 of 10 5. Property corner dedication meeting City code shall be provided. 6. Street lighting and street trees are required to meet current city standards. Final lighting plans are required to be submitted with the civil construction permit application and will be reviewed during the construction utility permit review. 7. Undergrounding of all existing and proposed utilities is required on all frontages per RMC 4-6-090. 8. Paving and trench restoration will comply with the City’s Trench Restoration and Overlay Requirements. 9. Refer to City code 4-4-080 regarding driveway regulations. Driveways shall be designed in accordance with City standard plans 104.4 and 104.5. a. The maximum width of any driveway shall not exceed 30-feet. i. The driveways as shown on the preliminary engineering plans consisting of curved radii entrances and exits do not meet City standard driveway requirements. Final driveway configuration shall meet City standards and will be reviewed and approved during the civil construction permit approval process. b. Driveways shall be located a minimum of 5-feet from property lines. c. Maximum driveway slope is 8% 10. Parking lot construction shall be in accordance with City code 4-4-80 (G). 11. A traffic impact analysis dated October 4, 2022 was provided by TENW. The site generated traffic volumes were calculated using data from the Institute of Transportation Engineers (ITE) Trip Generation Manual, 11th Edition, (2021). The analysis determined vehicular traffic generated from a proposed development exceeds 20 vehicles per hour in either the AM (6:00 – 9:00) or PM (3:00 – 6:00) peak periods and provided a discussion on traffic circulation to and from the site and onsite traffic circulation. a. Based on the calculations provided, the proposed development would average 1,085 new daily vehicle trips. Weekday peak hour AM trips would generate 71 new vehicle trips, with 34 vehicles leaving and 37 vehicles entering the site. Weekday peak hour PM trips would generate 104 new vehicle trips, with 52 vehicles entering and 52 vehicles exiting the site. As detailed in the report the proposed project is not expected to lower the levels of service of the surrounding intersections included in the traffic study. i. Increased traffic created by the development will be mitigated by payment of transportation impact fees, frontage and intersection improvements as noted in sections 1 & 2 above, and access improvements as noted in section 1 above. b. Washington State Department of Transportation (WSDOT) provided comments on the traffic impact analysis on January 5, 2023. i. A revised traffic impact analysis addressing the WSDOT comments shall be submitted to the City and WSDOT at the civil construction permit application for review and approval. Additional mitigation may be warranted as a result of the revised analysis. ii. An Intersection Control Evaluation to be reviewed and approved by WSDOT is required prior to issuance of the civil construction permit. iii. WSDOT approval of all channelization and intersection improvements is required prior to issuance of the civil construction permit. DocuSign Envelope ID: AA4FA6BA-AA72-4A92-A78C-D1916105F712 Benson Petrovitsky Redevelopment– LUA22-000424 1/18/2023 Page 10 of 10 GENERAL COMMENTS 1. All existing and proposed utility lines and poles (i.e. power, electrical, phone, and cable services, etc.) along property frontage and within the site must be underground. The construction of these franchise utilities must be inspected and approved by a City of Renton inspector. 2. Maximum exposed retaining wall height is 6-ft and shall be setback a minimum of 3-ft from the right-of-way as outlined in RMC 4-4-040 – Fences, Hedges and Retaining Walls. 3. Adequate separation between utilities as well as other features shall be provided in accordance with code requirements. a. 7-ft minimum horizontal and 1-ft vertical separation between storm and other utilities is required with the exception of water lines which require 10-ft horizontal and 1.5-ft vertical. b. The stormwater line should be minimum 5 feet away from any other structure or wall or building. c. Trench of any utility should not be in the zone of influence of the retaining wall or of the building. 4. All civil construction permits for utility and street improvements will require separate plan submittals. All utility plans shall confirm to the Renton Drafting Standards. A licensed Civil Engineer shall prepare the civil plans. Please visit the Development Engineering Forms page for the most up-to-date plan submittal requirements: http://rentonwa.gov/business/default.aspx?id=42473 5. A landscaping plan shall be included with the civil plan submittal. Each plan shall be on separate sheets. 6. Fees quoted in this document reflect the fees applicable in the year 2023 only and will be assessed based on the fee that is current at the time of the permit application or issuance, as applicable to the permit type. Please visit www.rentonwa.gov for the current development fee schedule. 7. A demo permit is required for the demolition of the existing buildings. The demo permit shall be acquired through the building department. DocuSign Envelope ID: AA4FA6BA-AA72-4A92-A78C-D1916105F712