PRELIMINARY
TECHNICAL INFORMATION REPORT
FOR
Towns on 12th
CITY OF RENTON, WASHINGTON
11/21/2022
Prepared by: Andrew Oh, E.I.T., Katie Lane, E.I.T.
Approved by: Holli Heavrin, P.E.
Date: 2/18/2022
Revised: 11/21/2022
Core No.: 21008
Core Design, Inc. TOWNS ON 12TH i
TOWNS ON 12TH
Table of Contents
1. PROJECT OVERVIEW .......................................................................................................................... 1-1
2. CONDITIONS AND REQUIREMENTS SUMMARY ................................................................................ 2-2
2.1 Core Requirements .......................................................................................................................... 2-3
2.1.1 Core Requirement #1: Discharge at the Natural Location ...................................................... 2-3
2.1.2 Core Requirement #2: Offsite Analysis .................................................................................... 2-3
2.1.3 Core Requirement #3: Flow Control......................................................................................... 2-3
2.1.4 Core Requirement #4: Conveyance System ............................................................................. 2-3
2.1.5 Core Requirements #5: Erosion and Sediment Control ........................................................... 2-3
2.1.6 Core Requirement #6: Maintenance and Operations .............................................................. 2-3
2.1.7 Core Requirement #7: Financial Guarantees and Liability ....................................................... 2-3
2.1.8 Core Requirement #8: Water Quality ...................................................................................... 2-5
2.1.9 Core Requirement #9: On-Site BMPs ....................................................................................... 2-6
2.2 Special Requirements ...................................................................................................................... 2-6
2.2.1 Special Requirement #1: Other Adopted Area Specific Requirements .................................... 2-6
2.2.2 Special Requirement #2: Flood Hazard Area Delineation ........................................................ 2-6
2.2.3 Special Requirement #3: Flood Protection Facilities ................................................................ 2-6
2.2.4 Special Requirement #4: Source Control ................................................................................. 2-6
2.2.5 Special Requirement #5: Oil Control ........................................................................................ 2-6
2.2.6 Special Requirement #6: Aquifer Protection Area ................................................................... 2-6
3. OFFSITE ANALYSIS ............................................................................................................................. 3-1
3.1 Resource Review .............................................................................................................................. 3-1
3.1.1 Sensitive Areas ......................................................................................................................... 3-1
3.2 Field Investigation ............................................................................................................................ 3-4
4. FLOW CONTROL AND WATER QUALITY DESIGN ............................................................................... 4-7
4.1 Hydraulic Analysis ............................................................................................................................ 4-7
4.1.1 Existing Conditions ................................................................................................................. 4-10
4.1.2 Upstream Conditions.............................................................................................................. 4-10
4.1.3 Developed Conditions ............................................................................................................ 4-12
4.2 Water Quality Treatment Analysis and Design .............................................................................. 4-19
Core Design, Inc. TOWNS ON 12TH ii
5. CONVEYANCE SYSTEM ANALYSIS AND DESIGN ................................................................................. 5-1
6. SPECIAL REPORTS AND STUDIES ....................................................................................................... 6-1
7. OTHER PERMITS ................................................................................................................................ 7-1
8. ESC ANALYSIS AND DESIGN ............................................................................................................... 8-1
9. BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT ............................. 9-1
10. OPERATIONS AND MAINTENANCE .................................................................................................. 10-1
Core Design, Inc. TOWNS ON 12TH Page 1-1
1. PROJECT OVERVIEW
The proposed Towns on 12th project is located to the north of the intersection of NE 12th Street and NE
11th Place Renton, Washington within Section 4, Township 23 North, Range 5 East, W.M. See Vicinity
Map below.
The site is composed of seven parcels #042305-9063, #042305-9099, #042305-9067, #042305-9140,
#042305-9100, #042305-9101 and #032405-9247 with an area of approximately 6.55 acres. The site is
bordered by NE Sunset Blvd. (which is a major arterial) to the north, NE 12th Street (collector) to the
south, residential developed parcels to the west, and commercial developed parcels to the east.
The site has a high point in the middle of the site and slopes down in all directions ranging from 5-20%.
Proposed development of the property will include the construction of multiple townhomes, private
roads, utilities, and minor frontage improvements. All existing structures and hard surfaces will be
demolished and removed.
The subject project’s drainage facilities were designed using the guidelines and requirements
established in the 2017 City of Renton Surface Water Design Manual (RSWDM). Flow Control Duration
Standard (Matching Forested) and Enhanced Basic Water Quality Treatment are required for this
project.
Core Design, Inc. TOWNS ON 12TH Page 2-2
2. CONDITIONS AND REQUIREMENTS SUMMARY
The proposed project is classified as requiring “Full Drainage Review” per the 2017 RSWDM. Therefore,
all nine core requirements and six special requirements will be addressed per Section 1.2 and 1.3 of the
2017 RSWDM.
Core Design, Inc. TOWNS ON 12TH Page 2-3
2.1 Core Requirements
2.1.1 Core Requirement #1: Discharge at the Natural Location
The project discharges its drainage at the natural location which is to the City’s conveyance system
located along the south side of NE Sunset Blvd.
2.1.2 Core Requirement #2: Offsite Analysis
See Section 3 of this Report for the downstream analysis.
2.1.3 Core Requirement #3: Flow Control
The site falls within the City’s Flow Control Duration Standard (Matching Forested). See City’s Flow
Control Application Map on the following page. This flow control standard requires matching forested
conditions over the range of flows extending from 50% of 2-year up to the full 50-year flow AND
matches peaks for the 2- and 10-year return periods.
See Section 4 of this Report for details on the Flow Control Analysis.
2.1.4 Core Requirement #4: Conveyance System
This core requirement will be addressed during final design.
2.1.5 Core Requirements #5: Erosion and Sediment Control
This core requirement will be addressed during final design.
2.1.6 Core Requirement #6: Maintenance and Operations
This core requirement will be addressed during final design.
2.1.7 Core Requirement #7: Financial Guarantees and Liability
This core requirement will be addressed at the time the permit is issued.
Lake
Desire
Shady
Lake (Mud
Lake)
Panther
Lake Lake
Youngs
Lake
Washington
B l a c k Ri ve r
Gr een Ri
v
e
r
Ce
darRi verUV900
UV167
UV515
UV169
UV900
UV169
UV167BN IncBN IncBBNNIInnccSSEE
RReennttoonn IIssss aa qquuaahh RR dd
RReennttoonn MMaappllee VVaalllleeyyRRdd
MMaapplleeVVaalllleeyyHHwwyy
110088tthhAAvveeSSEESSWW SSuunnsseettBBllvv
dd RRaaiinnii
eerrAAvveeNNNE 3rd S
t
NE 3rd S
t
SW 43rd StSW 43rd St SS EE CCaarrrrRR dd
NE 4th StNE 4th St
SSEE RReennttoonn MMaappllee VVaalllleeyy RRddLLooggaannAAvveeNN
SR 515SR 515PPaarrkkAAvveeNNOOaakkeessddaalleeAAvveeSSWWSSuunnsseettBBllvvddNN EE
DDuuvvaallllAAvveeNNEEI-405 FWYI-405 FWY II--440055FFWWYYSR 167SR 1671144
00tthh
WWaayy
SS
EENNEE 2277tthh SStt
115566tthhAAvveeSSEEUUnniioonnAAvveeNNEE111166tthhAAvveeSSEESW 7th StSW 7th St
N 8th StN 8th St
PP uuggeettDDrrSSEE
RR
ee
nnttoonnAAvvee SS
SSWW 2277tthh SStt BBeennssoonnRRddSSWWiilllliiaammssAAvveeSSMMoonnrrooeeAAvveeNNEESE 128th StSE 128th St
II
nntt
eerr
uurr
bbaannAA
vvee
SS HHooqquuiiaammAAvveeNNEE8844tthhAAvveeSSSSEEPPeett
rr
oovvii
tt
sskkyyRRddEEVVaalllleeyyHHwwyySE 192nd StSE 192nd St
SE 60th StSE 60th St
TTaallbboottRRddSSRRee
nn
tt
oo
nn
AAvveeSS116644tthhAAvveeSSEESE 208th StSE 208th St
SE 72nd StSE 72nd St
RR
aaiinniieerr
AA
vvee
SS 111166tthhAAvveeSSEES 128th StS 128th St
NNeewwccaassttllee WWaayy
SS 221122tthh SStt
SS 118800tthh SStt CCooaall
CCrreeeekkPPkkwwyySSEESW 41st StSW 41st St
114400tthhAAvveeSSEE112288tthhAAvveeSSEE6688tthhAAvveeSSSSEE 116688tthh SStt
NE 12th StNE 12th St
BBeeaaccoonn
AA
vv
ee
SS
FFoorreesstt DDrr SSEE
SSEE 116644tthh SStt 114488tthhAAvveeSSEESSEE MMaayy VVaalllleeyy RRdd
SS EE JJ oo nn ee ss RR dd
SS EE 22 00 44 tthh WW aayySW 34th StSW 34th St
SE 144th StSE 144th St
114488tthhAAvveeSSEE115544tthhPPllSSEELL
aa
kk
ee
WWaa
sshhii
nnggtt
oonnBBll
vvddNNEEddmmoonnddssAAvveeNNEEAAbbeerrddeeeennAAvveeNNEEEEMM eerrcceerrWWaayyWWeessttVVaalllleeyyHHwwyyEast Valley RdEast Valley Rd,§-405
,§-405
,§-405
μ 012
Miles
Flow Control Application Map
Reference 1-A
Date: 01/09/2014
Flow Control Standards
Peak Rate Flow Control Standard (Existing Site Conditions)
Flow Control Duration Standard (Existing Site Conditions)
Flow Control Duration Standard (Forested Conditions)
Flood Problem Flow
Unincorporated King County Flow Control Standards
Renton City Limits
Potential Annexation Area
Core Design, Inc. TOWNS ON 12TH Page 2-5
2.1.8 Core Requirement #8: Water Quality
As the City of Renton does not have Sensitive Lake or Sphagnum Bog Water Quality Treatment Areas,
Basic Water Quality Treatment is the only other option available. As the proposed project is a
Multifamily Residential development, Enhanced Basic Water Quality Treatment is required.
See Section 4 of this Report for details on Water Quality Facility Sizing.
Core Design, Inc. TOWNS ON 12TH Page 2-6
2.1.9 Core Requirement #9: On-Site BMPs
See Section 4.1.2 of this Report for discussion on how this Core Requirement is addressed.
2.2 Special Requirements
2.2.1 Special Requirement #1: Other Adopted Area Specific Requirements
There are no known additional requirements for the subject project.
2.2.2 Special Requirement #2: Flood Hazard Area Delineation
Not applicable since the project does not contain nor is adjacent to a flood hazard area.
2.2.3 Special Requirement #3: Flood Protection Facilities
Not applicable since the project does not rely on an existing flood protection facility or plans to modify
or construct a new flood protection facility.
2.2.4 Special Requirement #4: Source Control
Not applicable since the project is not a commercial development.
2.2.5 Special Requirement #5: Oil Control
Not applicable since the project is not a high use site. The expected average daily traffic is less than 100
vehicles per 1,000 square feet of gross building area.
2.2.6 Special Requirement #6: Aquifer Protection Area
Not applicable since the project is not in an Aquifer Protection Area.
Core Design, Inc. TOWNS ON 12TH Page 3-1
3. OFFSITE ANALYSIS
3.1 Resource Review
The proposed project is located within the Lake Washington Cedar River Watershed.
3.1.1 Sensitive Areas
Renton GIS was reviewed for sensitive areas. The proposed project site falls within the following
sensitive areas: landslide and regulated slopes. The proposed project site does not fall within the
following sensitive areas: coal mines, erosion hazard, flood hazard, floodway, channel migration zone,
seismic hazard, regulated stream, or wellhead protection.
Core Design, Inc. TOWNS ON 12TH Page 3-2
According to the Renton GIS Map, there is a portion of the site along the north boundary which falls
within a landslide hazard area. See picture below.
Landslide Hazard (Per Renton GIS Data)
Core Design, Inc. TOWNS ON 12TH Page 3-3
According to the Renton GIS Map, there is a portion of the site along the north boundary which falls
within 15%-90% regulated slope. See picture below.
Regulated Slope: 15% to 90% Slope Area (Per Renton GIS Data)
Core Design, Inc. TOWNS ON 12TH Page 3-4
3.2 Field Investigation
A field investigation was completed on June 9, 2021.
Upstream Tributary Analysis
There is a neighborhood directly west of the project site. In this neighborhood there are three side roads
that are located to the northwest of the project boundary that point towards the site: NE 14th Place, NE
14th Court, and NE 14th Street.. The southern-most road (NE 14th Street) slopes east towards the site, but
has a mound and catch basin located at the low point of the road. This would prevent any runoff from
this road from entering the project site. The other two roads slope west away from the project site. We
will assume that the site’s western boundary acts as a high point for the purposes of the basin boundary.
The rest of the homes located to the south of these three side roads drain directly into the existing
detention pond located in this neighborhood. There is a storm system located in the backyard of these
homes that will collect all backyard drainage and direct it to the detention pond as well. We can assume
that this portion of the site’s western boundary is also a high point for the purposes of the basin
boundary.
There is additional upstream area to the site that is accounted for in the existing wetland located along
the west boundary of the site. The area from four existing homes to the south of the wetland, drains to
the wetland and discharges into the site.
Along the south property line lies NE 12th Street. No runoff from NE 12th Street will enter the project site
as there is an existing mound along the north edge of NE 12th Street that prevents any runoff from
entering into the site.
Downstream Drainage Complaints
Drainage complaints were researched within a quarter mile of the project site. City of Renton does not
list any current complaints along the project’s downstream route.
Onsite Drainage System Description
The site consists of seven connected parcels. The center of the project site contains a single-family
residence and shed. A dirt roadway creates a passage between the west and east portions of the site
which connects through the center of the site. There are two additional single-family homes in the
southern portion of the site. The remainder of the site is undeveloped consisting of thick forest cover.
The northwestern portion of the site contains a large meadow with thick grass cover. Large trees are
found in abundance throughout the project site. The entire site is located within the May Creek drainage
basin.
The topography of the entire site generally slopes to the north. Steep slopes are found along the
northern boundary of the parcel bordering NE Sunset Blvd. The site also contains steep slopes along the
eastern boundary of the project site. These slopes lead downhill eastward towards the adjacent
businesses on NE Sunset Blvd. These slopes lead to the existing stormwater collection system along the
southern border of NE Sunset Blvd. The meadow in the northwestern region of the map is a localized
Core Design, Inc. TOWNS ON 12TH Page 3-5
low point for site runoff. The slope is directed in a northeastern direction towards the adjacent road
from this point.
Downstream Drainage System Description
Runoff travels over the site via sheet flow over thick forested ground cover. All flow onsite is eventually
directed towards NE Sunset Blvd. which is located north of the site. An existing catch basin network
along the southern boundary of NE Sunset Blvd. serves to collect runoff and continue the flow eastward
(see downstream map). All the receiving catch basins north of site are located along the southern edge
of NE Sunset Blvd. All runoff is directed to the point where it is conveyed across the highway and then
directed northward into Honey Dew Creek. Honey Dew Creek flows northward and eventually joins May
Creek beyond the ¼ mile extent of the analysis. At this point the downstream analysis is terminated. See
downstream map for details.
Downstream Reach Description to a quarter mile
Pipe Material Pipe Diameter
(in)
Overall Length
(ft)
Cumulative Length
(ft)
Concrete 18 262 262
Concrete 18 55 317
Concrete 18 53 370
Unknown 18 47 417
Honey Dew Creek N/A 1,273 1,320
Core Design, Inc. TOWNS ON 12TH Page 3-6
Core Design, Inc. TOWNS ON 12TH Page 4-7
4. FLOW CONTROL AND WATER QUALITY DESIGN
A flow control facility is proposed as the project is required to meet the City’s Flow Control Duration
Standard (Matching Forested). This flow control standard requires matching forested conditions over
the range of flows extending from 50% of 2-year up to the full 50-year flow and matching peaks for the
2- and 10-year return periods. A water quality treatment facility is proposed as the project is required to
provide enhanced basic water quality treatment as delineated in Section 4.2 of this Report.
4.1 Hydraulic Analysis
The drainage analysis was modeled using WWHM. Per the City of Renton Soil Survey, the site soil is
Alderwood (AgC), hydrologic soil group “C”, Till for modeling.
BeD
BeD
BeC
AkF
AmC
KpD
AmB
AmB
AgC
AgC
AgC
KpB
AgC
AkF
BeD
AgC
KpD
AgCKpBKpBAgD
EvC
Bh BeC
AgB
KpB
AgD UrEwC
EvB
AmC
Or
AgC
BeC
BeD
BeD
BeC
AgC
KpD
BeC
KpCKpB
Sk
AmC BeC UrBeCUr
AgD
KpB
Ur
AgC
EvC
KpC
AgC
OvD
SkAgB
AgB
AgD
EvC
W
OvD
OvD
No
AgC
AgD
EvC
RdC Sk
KpB
No
AgC
RdEAgCEvC
BeC
InC
Bh
BeD
RdC
AkF
AgD
BeD
BhSm
AgC
RdE
AgC AgDEvC
Sh
Sh
PITS
PyAgC
AgD
AgC EvC
PITS
EvB
BeC
OvC
PITS
EvB AgC
InA
AgD
AgD
Ur
Bh
AgC
RdCEvCEvD
AmB
AmC
AgD
BeD
EvC
AkF
AgD
AgC
Sm
AgD
AmC
EvB
AgD
Sm
AgC
EwC
PITSPu
Bh
Bh
AgC
KpD
Tu
AgC
EvC
EvC
Ur
RdC
KpB
RdCRdE
W
AgD
AgD
No
AgB
AgC
No
An
AkF
EvB
InD
AgD
EvD
InC
Sk
BeC
PITS
Ur
WBeC W
BeD
An EvC
BeC
Pc EvC
Rh
AmC
BeCBeD BeD
Ur
BeC
Ur
W
W
Rh EvC
AkF
PITS
AgD
AmCPITS
Wo
Py
Tu
BeD
EvB
Py
AmC
Py
An
InC
Ng
AgC
AgC
W
EvB
AgD
AgCWo
Ur W
Ur RdC
Ur
Ur
EvC
Rh
Pc
PyPy
AgD
AmC
AgD MaRh
Pc
BeD Py
Ng AmC Ng
BeC
AgC
Rh
AgD
Py
Ma PyRh Rh
RhPu
Pu
Ur
Pu
PITS
BeD
Rh
EvC
Py
Wo
Wo
AgC Ma
AgD
AgB
So
Ng
AgD
Tu
Py
AgC
AgC
AgC
AgC
Ng Ur
AgD
Sk AmB
AgB
AgD
PuUr
Py
Sk
Ur
No
AgB
MaBeC
W
AkFBeD
Pu
Py
No
No
AmC
AgC
EvC
Ma
Sk
EvC AgB
Py
InC SkAmC
AmC
AgC
AgB SkAgB
PITS
AgC
No
Pu AmB
EvC
PITS
AmB
AgB
AkF
AkF
Ng
AgD
AgD
AgB
EvBAmB
AmC
AmC
Wo
Ng
PITS
Nk AgD
SkNk SkAgB
Ur AgD
Wo
AmC No
AgD
No
Ur
AgB
Ur
Br
Py
Os So
EvB
Ur
Nk Wo
AmB
W
Pc
OsRe
UrAmB
Sk
W
AmC
Tu
No
Pu AgD AmBAkFAgCNo
UrPk
AgB
AgC
Ur
AmB
NoAmC
NoAmC
AmB PITS UrSkAgCAgB
AgC
Re
AgB
W
InC No
AgC
Wo
EvC NoAmC
Wo
AgB
AgB
Ur
Ng SkAmB
ReOs AgC
No
AgD
No
Ur
No
InC
AgD EvC
Tu
AmB EvB
AgD
Pu InC
EvCAmC NoEvC
Ur
EvB AkF
Br
Os
AgD
AmC
AgB
AgD
AmB
Os
Os
NoAmC
Pk AkF No
AmC
EvC
NoNo
AgDBr AgBAgC
AgBAmC
Re Re
KpBAmBNoPyPySkNgAgBEvC
EvC Sk NoEvBNo
Pu BrPuOsOsWo AmC
Panther
Lake
Lake
Youngs
Lake
Washington
B l a c k Ri v er
Gr
een R iverCeda rRiverDuwamish W
a
t
erw ayUV167
UV900
UV515
UV169
UV900
UV167BN IncBN IncBBNNIInnccSSEE RReennttoonn IIss
ss
aa
qq
uuaahhRRdd
S 2nd StS 2nd St
RReennttoonn MMaappllee VVaalllleeyyRRdd
MMaapplleeVVaalllleeyyHHwwyy
110088tthhAAvveeSSEEMMaaiinnAAvveeSSMMaa
rrttiinn
LL
KKiinnggJJrrWWaayySS
SSWW SSuunnsseett
BBllvv
dd RRaaiinnii
eerrAAvveeNNNE 3rd S
t
NE 3rd S
t
II--440055FFWWYYSW 43rd StSW 43rd St
SSEE CCaarrrrRR dd
NE 4th StNE 4th St
SS GG rr aa dd yy WW aa yy
SSEE RReennttoonn MMaappllee VVaalllleeyy RRddLLooggaannAAvveeNN
SR 515SR 515PPaarrkkAAvveeNNBBeennssoonnDDrrSSSSuunnsseettBBllvvddNN
OOaakkeessddaalleeAAvveeSSWWSSuunnsseettBBllvvddNN EE
DDuuvvaallllAAvveeNNEESR 167SR 16711
4400tthh
WWaayySSEEWWaa
tt
ee
rrss
AA
vv
ee
SS
NNEE 2277tthh SStt
HH
oouusseerrWWaayyNN115566tthhAAvveeSSEEUUnniioonnAAvveeNNEE111166tthhAAvveeSSEESW 7th StSW 7th St
PPuuggeettDDrrSSEERR
ee
nnttoonnAAvvee SS GGaarrddeennAAvveeNNSSWW 2277tthh SStt BBeennssoonnRRddSSWWiilllliiaammssAAvveeSSMMoonnrrooeeAAvveeNNEEII
nntt
eerr
uurr
bbaannAAvveeSS HHooqquuiiaammAAvveeNNEE8844tthhAAvveeSSSSEEPPeettrroovviittsskkyyRRdd
SSoouutthhcceenn tt ee rr BB llvvdd
EEVVaalllleeyyHHwwyySShhaattttuucckkAAvveeSSRR
aaiinniieerr
AAvvee
SS
TTaallbboottRRddSSRRee
nn
tt
oo
nn
AAvv
ee
SS116644tthhAAvveeSSEESE 208th StSE 208th St
SSWWLLaannggssttoonnRRdd
SE 72nd StSE 72nd St
SE 128th StSE 128th St
112244tthhAAvveeSSEES 128th StS 128th St
NNeewwccaassttllee WWaayy
SS 221122tthh SStt
SS 118800tthh SStt CCooaallCCrr
eeeekkPPkkwwyySSEESW 41st StSW 41st St
N 30th StN 30th St
T
a
y
l
o
r
P
l
NW
T
a
y
l
o
r
P
l
NW114400tthhAAvveeSSEE112288tthhAAvveeSSEE111166tthhAAvveeSSEE6688tthhAAvveeSSSSEE 116688tthh SStt
NE 12th StNE 12th St
BB
ee
aa
cc
oo
nn
AAvv
ee
SSFFoorreesstt DDrr SSEE
UUnniioonnAAvveeSSEESE 164th StSE 164th St NNiilleeAAvveeNNEE114488tthhAAvveeSSEESSEE MMaayy VVaalllleeyy RRdd
SS EE 22 00 44 tthh WW aayySW 34th StSW 34th St
SS EE JJ oo nnee ss RR dd
SE 144th StSE 144th StEEMMeerrcceerrWWaayy
114488tthhAAvveeSSEEWWMMeerrcceerrWWaayy115544tthhPPllSSEEEEddmmoonnddssAAvveeNNEEAAbbeerrddeeeennAAvveeNNEEWWeessttVVaalllleeyyHHwwyyEast Valley RdEast Valley Rd,§-405
,§-405
Reference 1-C
Renton City Limits
Potential Annexation Area
Groundwater Protection Area Boundary
Aquifer Protection Area Zone 1
Aquifer Protection Area Zone 1 Modified
Soil Type
AgB
AgC
AgD
AkF
AmB
AmC
An
BeC
BeD
Bh
Br
EvB
EvC
EvD
EwC
InA
InC
InD
KpB
KpC
KpD
Ma
Ng
Nk
No
Or
Os
OvC
OvD
PITS
Pc
Pk
Pu
Py
RdC
RdE
Re
Rh
Sh
Sk
Sm
So
Tu
Ur
W
Wo
Date: 01/09/2014
012
MilesμSoil Survey
Core Design, Inc. TOWNS ON 12TH Page 4-9
Core Design, Inc. TOWNS ON 12TH Page 4-10
4.1.1 Existing Conditions
See Existing/Upstream Conditions exhibit on the following pages.
The existing basin boundary area, 6.70 acres, will include the property area, 6.55 acre, plus the proposed
frontage improvement area along NE 12th Street, 0.15 acre. As part of the project, the City has
requested the existing sidewalk along NE Sunset Blvd. be relocated to create a planter strip. As the
project is simply moving the existing sidewalk, this sidewalk construction will not be considered as a
targeted impervious surface for the purpose of drainage design.
Some areas of the subject site discharge west offsite providing recharge to the existing offsite wetland.
During final design, an area will be designated to discharge to this offsite wetland. Drainage collected by
this wetland though, discharges back onto the project site and will be conveyed through the stormwater
flow control and treatment facilities.
The following information was used for generating flow frequencies.
EXISTING CONDITIONS Total Area = 6.70 acres
GROUND COVER AREA (acres)
Till-Forest 6.70
4.1.2 Upstream Conditions
See Existing/Upstream Conditions exhibit on the following pages.
The project site has two upstream areas. The first upstream area is located along the southern half of
the west boundary line of the site. This upstream area is tributary to the existing wetland located on
site. The second upstream area is located at the southwest corner of the site. This area is tributary to
the site.
Impervious coverage from all these areas were delineated through the use of aerial images at correct
scales to outline the impervious areas.
The following information was used for generating flow frequencies.
UPSTREAM CONDITIONS Total Area = 1.19 acres
GROUND COVER AREA (acres)
Till-Grass 0.78
Impervious 0.41
The below inputs into WWHM for the basin include both the existing area (6.70 acres) and the upstream
areas draining to the site (1.19 acres).
DESIGNE N G I N E E R I N G P L A N N I N G S U R V E Y I N G12100 NE 195th St, Suite 300Bothell, Washington 98011425.885.7877 Fax 425.885.796321008
Core Design, Inc. TOWNS ON 12TH Page 4-12
4.1.3 Developed Conditions
See Developed/Upstream Conditions exhibit on the following pages.
For preliminary design, the developed basin boundary area is equal to and the same as the existing basin
boundary area, 6.70 acres.
For the final design, some area swapping will be incorporated into the flow control and water quality
treatment design. Drainage along NE 12th Street will be collected and discharged to the existing
conveyance system along NE 12th Street. Modeling of upstream areas will be adjusted in final design to
account for the runoff from NE 12th Street which will not be collected by the proposed system.
Impervious areas for the site were calculated based on the proposed site plan per the project’s
designation as multi-family. The impervious areas are summarized in the table below. The site areas for
the upstream condition are provided in Section 4.1.2 of this report.
Credits received for Onsite BMPs are not considered for this preliminary design. Onsite BMP credits will
be reviewed and incorporated during final design.
DEVELOPED CONDITIONS
Total Area Impervious Area Pervious Area
Sidewalk 20,617 20,617 0
Road/Driveway 64,269 64,269 0
Roof 76,548 76,548 0
Grass 124,019 0 124,019
Total Area (SF) 291,987 161,434 130,553
Total Area (AC) 6.70 3.70 3.00
The inputs into WWHM for the basin include both the developed basin area (6.70 acres) and the
upstream areas draining to the site (1.19 acres).
04230590630423059099042305906704230591400423059100DESIGNE N G I N E E R I N G P L A N N I N G S U R V E Y I N G12100 NE 195th St, Suite 300Bothell, Washington 98011425.885.7877 Fax 425.885.796321008
Core Design, Inc. TOWNS ON 12TH Page 4-14
FLOW CONTROL FACILITY ANALYSIS
Flow control facilities have been designed using WWHM. Proposed vault dimensions are given below
along with WWHM generated modeling reports. The project will utilize a standard detention vault to
provide flow control. The required surface area of the vault is 7,040 square feet. Using the maximum
water surface of the 50-year storm (Elev. 405.82) as calculated in the vault overflow analysis below
under VAULT OVERFLOW ANALYSIS, along with the normal water surface elevation (Elev. 393.50), the
minimum required volume will be the surface area times the live storage depth, 7,040 square feet x
(405.82 – 393.50) = 86,733 cubic feet. The proposed detention vault will provide a volume of 86,831
cubic feet, exceeds the required volume, and therefore providing adequate flow control. The full
WWHM generated report is provided in Appendix A.
VAULT OVERFLOW ANALYSIS
The water surface elevations within the vault are conservatively calculated based on the equation below
as WWHM does not accurately calculate the water surface when the water surface starts to exceed the
riser elevation.
The primary overflow for the vault is the riser pipe on the control structure. The water surface elevation
above the riser for the 100-year developed flow is calculated assuming all orifices are plugged. The 100-
year, 15-minute return period storm for the developed tributary area is 5.81 cfs. See snip from WWHM
model below which shows the developed site undetained flows.
To pass the 100-year, 15-minute return period storm, 5.81 cfs, through a 36-inch overflow riser, 0.34
feet of head is required per the following equation:
= 9.739
/ 5.81 = 9.739 3 /
The primary overflow elevation, elevation 405.84, would therefore, be equal to the elevation of the top
of the riser, elevation 405.50, plus the amount of head required to pass the 100-year return period
storm, 0.34 feet. This primary overflow elevation will be utilized as the vault’s tailwater elevation for
sizing of the conveyance system during final design.
The 50-year maximum water surface for the vault is determined in the same way as the 100-year
overflow. The water surface elevation above the riser for the 50-year developed flow is calculated
assuming all orifices are plugged. The 50-year, 15-minute return period storm for the developed
tributary area is 5.17 cfs. See snip from WWHM model below which shows the developed site
undetained flows.
To pass the 50-year, 15-minute return period storm, 5.17 cfs, through a 36-inch overflow riser, 0.32 feet
of head is required per the following equation:
= 9.739
/ 5.17 = 9.739 3 /
The 50-year maximum water surface elevation, elevation 405.82, would therefore, be equal to the
elevation of the top of the riser, elevation 405.50, plus the amount of head required to pass the 100-
year return period storm, 0.32 feet.
Core Design, Inc. TOWNS ON 12TH Page 4-15
Core Design, Inc. TOWNS ON 12TH Page 4-16
ON-SITE BMPs
Per Section 1.2.9.1 in the RSWDM, projects subject to Core Requirement #9 must apply flow control
BMPs to either supplement the flow mitigation provided by required flow control facilities or provide
flow mitigation where flow control facilities are not required. Flow control BMPs must be implemented
per the requirements and approach detailed in Sections 1.2.9.2 and 1.2.9.3 for individual lots and
subdivisions or road improvement projects, respectively. The Section applicable to this project is Section
1.2.9.2.
Per Section 1.2.9.2, projects on individual sites/lots, flow control BMPs must be selected and applied
according to the individual lot BMP requirements. The category of requirements applicable to the
subject project is the Large Lot BMP Requirements (for sites/lots >22,000 square feet).
1. The feasibility and applicability of full dispersion as detailed in Appendix C, Section C.2.1 must be
evaluated for all target impervious surfaces. If feasible and applicable, full dispersion must be
implemented as part of the proposed project. Typically, large lot full dispersion will be applicable
only in subdivisions where enough forest was preserved by tract, easement, or covenant to meet
the minimum requirements for full dispersion in Appendix C, Section C.2.1.1
Full Dispersion is not feasible due to being unable to meet the minimum required flow path with the
appropriate slopes.
2. Where full dispersion of target impervious roof areas is not feasible or applicable, or will cause
flooding or erosion impacts, the feasibility and applicability of full infiltration as detailed in Appendix
C, Section C.2.2 must be evaluated (note, this will require a soils report for the site/lot). If feasible
and applicable, full infiltration of roof runoff must be implemented as part of the proposed project.
Full Infiltration is not feasible due to existing onsite non-infiltrating till soils.
3. All target impervious surfaces not mitigated by Requirements 1 and 2 above, must be mitigated to
the maximum extent feasible using one or more BMPs from the following list. Use of a given BMP is
subject to evaluation of its feasibility and applicability as detailed in Appendix C. Feasible BMPs are
required to be implemented. The BMPs listed below may be located anywhere on the site/lot
subject to the limitations and design specifications for each BMP. These BMPs must be
implemented as part of the proposed project.
• Full Infiltration per Appendix C, Section C.2.2, or per Section 5.2, whichever is applicable
Full Infiltration is not feasible due to existing onsite non-infiltrating till soils
• Limited Infiltration per Appendix C, Section C.2.3,
Opportunities for Limited Infiltration will be further reviewed during final design. At this time, limited
infiltration is not feasible per the project’s geotechnical engineer. Per the Geotechnical Report
prepared by Terra Associates, Inc, dated 8/5/21, soils observed on site are not suitable for Flow
Control BMPs due to the presence of weathered glacial till at shallow depths.
Core Design, Inc. TOWNS ON 12TH Page 4-17
• Bioretention per Appendix C, Section C.2.6, sized as follows:
o SeaTac regional scale factor equals 1.0: In till soils, provide bioretention volume based on 0.6
inches of equivalent storage depth; in outwash soils provide bioretention volume based on 0.1
inches of equivalent storage depth,
o SeaTac regional scale factor greater than 1.0: In till soils, provide bioretention volume based on 0.8
inches of equivalent storage depth; in outwash soils, provide bioretention volume based on 0.4
inches of equivalent storage depth,
Opportunities for Bioretention will be further reviewed during final design. Bioretention is not feasible
per the project’s geotechnical engineer. Per the Geotechnical Report prepared by Terra Associates,
Inc, dated 8/5/21, soils observed on site are not suitable for Flow Control BMPs due to the presence of
weathered glacial till at shallow depths.
• Permeable Pavement per Appendix C, Section C.2.7
Opportunities for Permeable Pavement will be further reviewed during final design. Permeable
Pavement is not feasible per the project’s geotechnical engineer. Per the Geotechnical Report
prepared by Terra Associates, Inc, dated 8/5/21, soils observed on site are not suitable for Flow
Control BMPs due to the presence of weathered glacial till at shallow depths.
4. All target impervious surfaces not mitigated by Requirements 1, 2 and 3 above, must be mitigated to
the maximum extent feasible using the Basic Dispersion BMP described below. Use of Basic
Dispersion is subject to evaluation of its feasibility and applicability as detailed in Appendix C.
Feasible BMPs are required to be implemented. Basic Dispersion BMPs may be located anywhere on
the site/lot subject to the limitations and design specifications cited in Appendix C. The BMP must
be implemented as part of the proposed project.
• Basic Dispersion per Appendix C, Section C.2.4,
Basic dispersion is not feasible due to being unable to meet the minimum required flow path with the
appropriate slopes and the steep slope adjacent to the site.
5. BMPs must be implemented, at minimum, for impervious area amounts defined as follows.
• For projects that will result in an impervious surface coverage on the buildable portion of the
site/lot of less than 45%, on-site BMPs must be applied to 50% of target impervious surfaces.
• For projects that will result in an impervious surface coverage 45-65% on the buildable portion
of the site/lot, on-site BMPs must be applied to 50% of target impervious surfaces reduced by
1.5% for each 1% of impervious surface coverage above 45% (e.g., impervious coverage of 55%
results in a requirement of on-site BMPs applied to 35% of target impervious surfaces).
• For projects that will result in an impervious surface coverage greater than 65% on the buildable
portion of the site/lot, on-site BMPs must be applied to 20% of the target impervious surfaces or
to an impervious area equal to at least 10% of the site/lot, whichever is less.
Core Design, Inc. TOWNS ON 12TH Page 4-18
The buildable portion of the site/lot is the total area of the site/lot minus any critical areas and
minus 200 ft. buffer areas from a steep slope hazard, landslide hazard, or erosion hazard area. If
these minimum areas are not mitigated using feasible BMPs from Requirements 1, 2, 3, and 4
above, one or more BMPs from the following list are required to be implemented to achieve
compliance. These BMPs must be implemented as part of the proposed project
• Reduced Impervious Surface Credit per Appendix C, Section C.2.9,
• Native Growth Retention Credit per Appendix C, Section C.2.10.
• Tree Retention Credit per Appendix C, Section C.2.14
The impervious area requiring mitigation is equal to 10% of the Site Area. The Site Area (285,453
square feet) is defined as the property area (289,606 square feet) less the ROW dedication area (4,153
square feet). The site includes buffer areas which totals to 19.268 square feet. This leaves the
buildable area at 266,185 square feet, with the proposed impervious of 163,622 square feet
The impervious area requiring mitigation is, therefore, equal to 10% of 266,185 square feet, or 26,619
square feet.
Opportunities for Reduced Impervious Surface Credit will be reviewed during final design. The only
feasible options possible under this option are open grid decking over pervious surface and wheel strip
driveways.
Since the proposed project will develop the entire site with the exception of sensitive areas and
associated buffers, a Native Growth Retention Credit is not feasible.
Tree Retention Credits will be applied during final design.
6. The soil moisture holding capacity of new pervious surfaces (target pervious surfaces) must be
protected in accordance with the soil amendment BMP as detailed in Appendix C, Section C.2.13.
Soil amendment will be incorporated for disturbed areas not covered with hard surfaces.
7. Any proposed connection of roof downspouts to the local drainage system must be via a perforated
pipe connection as detailed in Appendix C, Section C.2.11.
All proposed connections to the local drainage system will be provided via a perforated pipe
connection.
Core Design, Inc. TOWNS ON 12TH Page 4-19
4.2 Water Quality Treatment Analysis and Design
Per Core Requirement #8: Water Quality, the project is required to provide a water quality system to
treat stormwater runoff from pollution-generating surfaces. The site is located within an Enhanced Basic
Water Quality Area and is therefore required to implement a system from the Enhanced Basic Water
Quality Menu described in Section 6.1.2 of the 2017 RSWDM.
The project proposes to implement a Biopod proprietary water quality media filter manufactured by
Oldcastle as per Enhanced Basic Option 5 in the 2017 RSWDM. The Biopod filter has General Use Level
Designation (GULD) Approval from the Department of Ecology. Water Quality calculations are shown
below.
The Biopod system is located downstream of the vault, therefore the design flow for sizing of the system
is the 2-year flow rate from the vault. Per the 2017 RSWDM, an adjustment factor, k, of 1.93 has been
applied to the WWHM generated treatment flows. This adjustment factor was established based on 72%
of the 2-year, 24-hour precipitation for the project which was found to be 2.00 inches based on Figure
3.2.1.A of the 2017 RSWDM. As such, 72% of the 2-year, 24-hour precipitation was calculated to be 1.44
inches. This was used to find the appropriate k value per Table 6.2.1.A of the 2017 RSWDM which was
applied to the 2-year flow rate from the vault to find the appropriate flow rate for Biopod sizing. The
resulting BioPod sizing is summarized in the table below.
Biopod Sizing
2-year, 24-hour Precipitation 2.00 in
72% 2-year, 24-hour precipitation 1.44 in
k value 1.93
WWHM 2-year outflow from vault 0.2647 cfs
Adjusted Flow Rate 0.511 cfs
Selected BioPod BPU 824IB
Treatment Rate of Selected BioPod 0.570 cfs
Core Design, Inc. TOWNS ON 12TH Page 5-1
5. CONVEYANCE SYSTEM ANALYSIS AND DESIGN
Conveyance system analysis and design will be addressed during final design.
Core Design, Inc. TOWNS ON 12TH Page 6-1
6. SPECIAL REPORTS AND STUDIES
The following reports and assessments are provided for reference and informational purposes only.
Core Design takes no responsibility or liability for these reports, assessments, or designs as they were
not completed under the direct supervision of Core Design.
• Geotechnical Report by Terra Associates, Inc, dated 8/5/21
Core Design, Inc. TOWNS ON 12TH Page 7-1
7. OTHER PERMITS
No other permits relevant to this Preliminary TIR are known to be required at this time.
Core Design, Inc. TOWNS ON 12TH Page 8-1
8. ESC ANALYSIS AND DESIGN
The ESC analysis and design will be addressed during final design.
Core Design, Inc. TOWNS ON 12TH Page 9-1
9. BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF
COVENANT
The bond quantities, facility summary, and declaration of covenant will be addressed during final design.
Core Design, Inc. TOWNS ON 12TH Page 10-1
10. OPERATIONS AND MAINTENANCE
The operations and maintenance manual will be addressed during final design.
Core Design, Inc. TOWNS ON 12TH Page 10-2
Appendix A
WWHM Report
WWHM2012
PROJECT REPORT
New Vault 11/21/2022 1:10:29 PM Page 2
General Model Information
Project Name:New Vault
Site Name:
Site Address:
City:
Report Date:11/21/2022
Gage:Seatac
Data Start:1948/10/01
Data End:2009/09/30
Timestep:15 Minute
Precip Scale:1.167
Version Date:2021/08/18
Version:4.2.18
POC Thresholds
Low Flow Threshold for POC1:50 Percent of the 2 Year
High Flow Threshold for POC1:50 Year
New Vault 11/21/2022 1:10:29 PM Page 3
Landuse Basin Data
Predeveloped Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Forest, Mod 6.7
C, Lawn, Mod 0.78
Pervious Total 7.48
Impervious Land Use acre
ROOF TOPS FLAT 0.41
Impervious Total 0.41
Basin Total 7.89
Element Flows To:
Surface Interflow Groundwater
New Vault 11/21/2022 1:10:29 PM Page 4
Mitigated Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Lawn, Mod 3.78
Pervious Total 3.78
Impervious Land Use acre
ROOF TOPS FLAT 4.11
Impervious Total 4.11
Basin Total 7.89
Element Flows To:
Surface Interflow Groundwater
Vault 1 Vault 1
New Vault 11/21/2022 1:10:29 PM Page 5
Routing Elements
Predeveloped Routing
New Vault 11/21/2022 1:10:29 PM Page 6
Mitigated Routing
Vault 1
Width:80 ft.
Length:88 ft.
Depth:13 ft.
Discharge Structure
Riser Height:12 ft.
Riser Diameter:18 in.
Orifice 1 Diameter:1.9375 in.Elevation:0 ft.
Orifice 2 Diameter:1.625 in.Elevation:6.95 ft.
Orifice 3 Diameter:2.375 in.Elevation:9.7 ft.
Element Flows To:
Outlet 1 Outlet 2
Vault Hydraulic Table
Stage(feet)Area(ac.)Volume(ac-ft.)Discharge(cfs)Infilt(cfs)
0.0000 0.161 0.000 0.000 0.000
0.1444 0.161 0.023 0.038 0.000
0.2889 0.161 0.046 0.054 0.000
0.4333 0.161 0.070 0.067 0.000
0.5778 0.161 0.093 0.077 0.000
0.7222 0.161 0.116 0.086 0.000
0.8667 0.161 0.140 0.094 0.000
1.0111 0.161 0.163 0.102 0.000
1.1556 0.161 0.186 0.109 0.000
1.3000 0.161 0.210 0.116 0.000
1.4444 0.161 0.233 0.122 0.000
1.5889 0.161 0.256 0.128 0.000
1.7333 0.161 0.280 0.134 0.000
1.8778 0.161 0.303 0.139 0.000
2.0222 0.161 0.326 0.144 0.000
2.1667 0.161 0.350 0.149 0.000
2.3111 0.161 0.373 0.154 0.000
2.4556 0.161 0.396 0.159 0.000
2.6000 0.161 0.420 0.164 0.000
2.7444 0.161 0.443 0.168 0.000
2.8889 0.161 0.466 0.173 0.000
3.0333 0.161 0.490 0.177 0.000
3.1778 0.161 0.513 0.181 0.000
3.3222 0.161 0.536 0.185 0.000
3.4667 0.161 0.560 0.189 0.000
3.6111 0.161 0.583 0.193 0.000
3.7556 0.161 0.607 0.197 0.000
3.9000 0.161 0.630 0.201 0.000
4.0444 0.161 0.653 0.204 0.000
4.1889 0.161 0.677 0.208 0.000
4.3333 0.161 0.700 0.212 0.000
4.4778 0.161 0.723 0.215 0.000
4.6222 0.161 0.747 0.219 0.000
4.7667 0.161 0.770 0.222 0.000
4.9111 0.161 0.793 0.225 0.000
5.0556 0.161 0.817 0.229 0.000
5.2000 0.161 0.840 0.232 0.000
5.3444 0.161 0.863 0.235 0.000
New Vault 11/21/2022 1:10:29 PM Page 7
5.4889 0.161 0.887 0.238 0.000
5.6333 0.161 0.910 0.241 0.000
5.7778 0.161 0.933 0.244 0.000
5.9222 0.161 0.957 0.247 0.000
6.0667 0.161 0.980 0.250 0.000
6.2111 0.161 1.003 0.253 0.000
6.3556 0.161 1.027 0.256 0.000
6.5000 0.161 1.050 0.259 0.000
6.6444 0.161 1.073 0.262 0.000
6.7889 0.161 1.097 0.265 0.000
6.9333 0.161 1.120 0.268 0.000
7.0778 0.161 1.143 0.296 0.000
7.2222 0.161 1.167 0.311 0.000
7.3667 0.161 1.190 0.322 0.000
7.5111 0.161 1.213 0.332 0.000
7.6556 0.161 1.237 0.342 0.000
7.8000 0.161 1.260 0.350 0.000
7.9444 0.161 1.284 0.358 0.000
8.0889 0.161 1.307 0.366 0.000
8.2333 0.161 1.330 0.373 0.000
8.3778 0.161 1.354 0.380 0.000
8.5222 0.161 1.377 0.387 0.000
8.6667 0.161 1.400 0.393 0.000
8.8111 0.161 1.424 0.400 0.000
8.9556 0.161 1.447 0.406 0.000
9.1000 0.161 1.470 0.412 0.000
9.2444 0.161 1.494 0.418 0.000
9.3889 0.161 1.517 0.424 0.000
9.5333 0.161 1.540 0.429 0.000
9.6778 0.161 1.564 0.435 0.000
9.8222 0.161 1.587 0.494 0.000
9.9667 0.161 1.610 0.525 0.000
10.111 0.161 1.634 0.549 0.000
10.256 0.161 1.657 0.570 0.000
10.400 0.161 1.680 0.589 0.000
10.544 0.161 1.704 0.607 0.000
10.689 0.161 1.727 0.623 0.000
10.833 0.161 1.750 0.639 0.000
10.978 0.161 1.774 0.654 0.000
11.122 0.161 1.797 0.668 0.000
11.267 0.161 1.820 0.682 0.000
11.411 0.161 1.844 0.695 0.000
11.556 0.161 1.867 0.708 0.000
11.700 0.161 1.890 0.721 0.000
11.844 0.161 1.914 0.733 0.000
11.989 0.161 1.937 0.745 0.000
12.133 0.161 1.960 1.528 0.000
12.278 0.161 1.984 3.016 0.000
12.422 0.161 2.007 4.651 0.000
12.567 0.161 2.031 5.968 0.000
12.711 0.161 2.054 6.735 0.000
12.856 0.161 2.077 7.366 0.000
13.000 0.161 2.101 7.908 0.000
13.144 0.161 2.124 8.413 0.000
13.289 0.000 0.000 8.887 0.000
New Vault 11/21/2022 1:10:29 PM Page 8
Analysis Results
POC 1
+ Predeveloped x Mitigated
Predeveloped Landuse Totals for POC #1
Total Pervious Area:7.48
Total Impervious Area:0.41
Mitigated Landuse Totals for POC #1
Total Pervious Area:3.78
Total Impervious Area:4.11
Flow Frequency Method:Log Pearson Type III 17B
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.525386
5 year 0.821257
10 year 1.052694
25 year 1.387507
50 year 1.669031
100 year 1.97922
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.264658
5 year 0.405833
10 year 0.526823
25 year 0.716766
50 year 0.889226
100 year 1.091942
Annual Peaks
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.876 0.212
1950 0.818 0.256
1951 0.717 0.633
1952 0.343 0.183
1953 0.259 0.198
1954 0.423 0.237
1955 0.510 0.255
1956 0.536 0.294
1957 0.614 0.230
1958 0.369 0.238
New Vault 11/21/2022 1:10:55 PM Page 9
1959 0.342 0.214
1960 0.714 0.531
1961 0.457 0.227
1962 0.231 0.172
1963 0.466 0.235
1964 0.492 0.220
1965 0.531 0.244
1966 0.348 0.210
1967 0.885 0.248
1968 0.542 0.211
1969 0.455 0.210
1970 0.485 0.218
1971 0.566 0.252
1972 0.724 0.370
1973 0.315 0.223
1974 0.563 0.238
1975 0.677 0.248
1976 0.489 0.244
1977 0.329 0.180
1978 0.419 0.228
1979 0.330 0.172
1980 1.266 0.407
1981 0.445 0.205
1982 0.948 0.426
1983 0.448 0.250
1984 0.324 0.191
1985 0.318 0.210
1986 0.655 0.375
1987 0.651 0.414
1988 0.262 0.199
1989 0.214 0.191
1990 2.029 0.565
1991 1.158 0.549
1992 0.437 0.228
1993 0.314 0.210
1994 0.193 0.160
1995 0.423 0.257
1996 1.096 0.636
1997 0.732 0.580
1998 0.457 0.213
1999 1.385 0.375
2000 0.485 0.251
2001 0.275 0.172
2002 0.674 0.394
2003 0.849 0.205
2004 0.851 0.723
2005 0.552 0.252
2006 0.534 0.238
2007 1.667 1.393
2008 1.440 1.245
2009 0.771 0.361
Ranked Annual Peaks
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 2.0286 1.3932
2 1.6669 1.2451
3 1.4402 0.7231
New Vault 11/21/2022 1:10:55 PM Page 10
4 1.3853 0.6363
5 1.2656 0.6331
6 1.1576 0.5804
7 1.0956 0.5648
8 0.9482 0.5495
9 0.8848 0.5307
10 0.8764 0.4262
11 0.8514 0.4143
12 0.8486 0.4074
13 0.8184 0.3936
14 0.7713 0.3750
15 0.7317 0.3749
16 0.7235 0.3701
17 0.7174 0.3612
18 0.7143 0.2939
19 0.6766 0.2574
20 0.6735 0.2556
21 0.6552 0.2554
22 0.6505 0.2525
23 0.6145 0.2516
24 0.5656 0.2508
25 0.5627 0.2496
26 0.5523 0.2485
27 0.5419 0.2480
28 0.5357 0.2444
29 0.5336 0.2436
30 0.5308 0.2383
31 0.5098 0.2382
32 0.4917 0.2377
33 0.4887 0.2373
34 0.4854 0.2346
35 0.4853 0.2302
36 0.4656 0.2284
37 0.4573 0.2277
38 0.4565 0.2273
39 0.4550 0.2230
40 0.4475 0.2203
41 0.4448 0.2176
42 0.4373 0.2135
43 0.4234 0.2132
44 0.4225 0.2122
45 0.4187 0.2114
46 0.3692 0.2104
47 0.3484 0.2103
48 0.3434 0.2102
49 0.3425 0.2098
50 0.3300 0.2055
51 0.3294 0.2048
52 0.3237 0.1994
53 0.3183 0.1985
54 0.3153 0.1914
55 0.3139 0.1908
56 0.2746 0.1828
57 0.2622 0.1800
58 0.2591 0.1724
59 0.2306 0.1724
60 0.2144 0.1722
61 0.1930 0.1604
New Vault 11/21/2022 1:10:55 PM Page 11
New Vault 11/21/2022 1:10:55 PM Page 12
Duration Flows
The Facility PASSED
Flow(cfs)Predev Mit Percentage Pass/Fail
0.2627 5950 4663 78 Pass
0.2769 5159 3829 74 Pass
0.2911 4436 3666 82 Pass
0.3053 3882 3435 88 Pass
0.3195 3364 3163 94 Pass
0.3337 2922 2855 97 Pass
0.3479 2545 2550 100 Pass
0.3621 2199 2145 97 Pass
0.3763 1948 1787 91 Pass
0.3905 1706 1513 88 Pass
0.4047 1501 1261 84 Pass
0.4190 1308 951 72 Pass
0.4332 1167 677 58 Pass
0.4474 1025 599 58 Pass
0.4616 911 580 63 Pass
0.4758 819 553 67 Pass
0.4900 719 529 73 Pass
0.5042 608 485 79 Pass
0.5184 527 443 84 Pass
0.5326 455 395 86 Pass
0.5468 396 358 90 Pass
0.5610 341 320 93 Pass
0.5752 293 286 97 Pass
0.5894 255 261 102 Pass
0.6036 217 236 108 Pass
0.6178 193 207 107 Pass
0.6320 171 168 98 Pass
0.6462 143 144 100 Pass
0.6604 126 127 100 Pass
0.6747 112 116 103 Pass
0.6889 97 101 104 Pass
0.7031 85 84 98 Pass
0.7173 78 64 82 Pass
0.7315 63 39 61 Pass
0.7457 58 18 31 Pass
0.7599 55 17 30 Pass
0.7741 50 17 34 Pass
0.7883 48 16 33 Pass
0.8025 43 16 37 Pass
0.8167 41 15 36 Pass
0.8309 34 15 44 Pass
0.8451 33 15 45 Pass
0.8593 28 15 53 Pass
0.8735 27 15 55 Pass
0.8877 24 14 58 Pass
0.9019 24 14 58 Pass
0.9161 23 14 60 Pass
0.9303 22 12 54 Pass
0.9446 20 11 55 Pass
0.9588 19 11 57 Pass
0.9730 19 11 57 Pass
0.9872 15 11 73 Pass
1.0014 14 11 78 Pass
New Vault 11/21/2022 1:10:55 PM Page 13
1.0156 13 11 84 Pass
1.0298 13 10 76 Pass
1.0440 13 10 76 Pass
1.0582 13 9 69 Pass
1.0724 13 9 69 Pass
1.0866 13 9 69 Pass
1.1008 11 9 81 Pass
1.1150 10 9 90 Pass
1.1292 10 9 90 Pass
1.1434 9 9 100 Pass
1.1576 9 9 100 Pass
1.1718 8 6 75 Pass
1.1860 8 6 75 Pass
1.2003 8 6 75 Pass
1.2145 8 5 62 Pass
1.2287 8 5 62 Pass
1.2429 8 5 62 Pass
1.2571 8 4 50 Pass
1.2713 6 4 66 Pass
1.2855 6 4 66 Pass
1.2997 6 4 66 Pass
1.3139 6 4 66 Pass
1.3281 6 3 50 Pass
1.3423 6 3 50 Pass
1.3565 6 2 33 Pass
1.3707 6 2 33 Pass
1.3849 6 2 33 Pass
1.3991 5 0 0 Pass
1.4133 5 0 0 Pass
1.4275 5 0 0 Pass
1.4417 4 0 0 Pass
1.4559 4 0 0 Pass
1.4702 4 0 0 Pass
1.4844 4 0 0 Pass
1.4986 3 0 0 Pass
1.5128 3 0 0 Pass
1.5270 3 0 0 Pass
1.5412 3 0 0 Pass
1.5554 2 0 0 Pass
1.5696 2 0 0 Pass
1.5838 2 0 0 Pass
1.5980 2 0 0 Pass
1.6122 2 0 0 Pass
1.6264 2 0 0 Pass
1.6406 2 0 0 Pass
1.6548 2 0 0 Pass
1.6690 1 0 0 Pass
New Vault 11/21/2022 1:10:55 PM Page 14
Water Quality
Water Quality BMP Flow and Volume for POC #1
On-line facility volume:0.4349 acre-feet
On-line facility target flow:0.2464 cfs.
Adjusted for 15 min:0.2464 cfs.
Off-line facility target flow:0.1352 cfs.
Adjusted for 15 min:0.1352 cfs.
New Vault 11/21/2022 1:10:55 PM Page 15
LID Report
New Vault 11/21/2022 1:11:14 PM Page 16
Model Default Modifications
Total of 0 changes have been made.
PERLND Changes
No PERLND changes have been made.
IMPLND Changes
No IMPLND changes have been made.
New Vault 11/21/2022 1:11:14 PM Page 17
Appendix
Predeveloped Schematic
New Vault 11/21/2022 1:11:15 PM Page 18
Mitigated Schematic
New Vault 11/21/2022 1:11:16 PM Page 19
Predeveloped UCI File
RUN
GLOBAL
WWHM4 model simulation
START 1948 10 01 END 2009 09 30
RUN INTERP OUTPUT LEVEL 3 0
RESUME 0 RUN 1 UNIT SYSTEM 1
END GLOBAL
FILES
<File> <Un#> <-----------File Name------------------------------>***
<-ID-> ***
WDM 26 New Vault.wdm
MESSU 25 PreNew Vault.MES
27 PreNew Vault.L61
28 PreNew Vault.L62
30 POCNew Vault1.dat
END FILES
OPN SEQUENCE
INGRP INDELT 00:15
PERLND 11
PERLND 17
IMPLND 4
COPY 501
DISPLY 1
END INGRP
END OPN SEQUENCE
DISPLY
DISPLY-INFO1
# - #<----------Title----------->***TRAN PIVL DIG1 FIL1 PYR DIG2 FIL2 YRND
1 Basin 1 MAX 1 2 30 9
END DISPLY-INFO1
END DISPLY
COPY
TIMESERIES
# - # NPT NMN ***
1 1 1
501 1 1
END TIMESERIES
END COPY
GENER
OPCODE
# # OPCD ***
END OPCODE
PARM
# # K ***
END PARM
END GENER
PERLND
GEN-INFO
<PLS ><-------Name------->NBLKS Unit-systems Printer ***
# - # User t-series Engl Metr ***
in out ***
11 C, Forest, Mod 1 1 1 1 27 0
17 C, Lawn, Mod 1 1 1 1 27 0
END GEN-INFO
*** Section PWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC ***
11 0 0 1 0 0 0 0 0 0 0 0 0
17 0 0 1 0 0 0 0 0 0 0 0 0
END ACTIVITY
PRINT-INFO
<PLS > ***************** Print-flags ***************************** PIVL PYR
New Vault 11/21/2022 1:11:16 PM Page 20
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC *********
11 0 0 4 0 0 0 0 0 0 0 0 0 1 9
17 0 0 4 0 0 0 0 0 0 0 0 0 1 9
END PRINT-INFO
PWAT-PARM1
<PLS > PWATER variable monthly parameter value flags ***
# - # CSNO RTOP UZFG VCS VUZ VNN VIFW VIRC VLE INFC HWT ***
11 0 0 0 0 0 0 0 0 0 0 0
17 0 0 0 0 0 0 0 0 0 0 0
END PWAT-PARM1
PWAT-PARM2
<PLS > PWATER input info: Part 2 ***
# - # ***FOREST LZSN INFILT LSUR SLSUR KVARY AGWRC
11 0 4.5 0.08 400 0.1 0.5 0.996
17 0 4.5 0.03 400 0.1 0.5 0.996
END PWAT-PARM2
PWAT-PARM3
<PLS > PWATER input info: Part 3 ***
# - # ***PETMAX PETMIN INFEXP INFILD DEEPFR BASETP AGWETP
11 0 0 2 2 0 0 0
17 0 0 2 2 0 0 0
END PWAT-PARM3
PWAT-PARM4
<PLS > PWATER input info: Part 4 ***
# - # CEPSC UZSN NSUR INTFW IRC LZETP ***
11 0.2 0.5 0.35 6 0.5 0.7
17 0.1 0.25 0.25 6 0.5 0.25
END PWAT-PARM4
PWAT-STATE1
<PLS > *** Initial conditions at start of simulation
ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 ***
# - # *** CEPS SURS UZS IFWS LZS AGWS GWVS
11 0 0 0 0 2.5 1 0
17 0 0 0 0 2.5 1 0
END PWAT-STATE1
END PERLND
IMPLND
GEN-INFO
<PLS ><-------Name-------> Unit-systems Printer ***
# - # User t-series Engl Metr ***
in out ***
4 ROOF TOPS/FLAT 1 1 1 27 0
END GEN-INFO
*** Section IWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW IWAT SLD IWG IQAL ***
4 0 0 1 0 0 0
END ACTIVITY
PRINT-INFO
<ILS > ******** Print-flags ******** PIVL PYR
# - # ATMP SNOW IWAT SLD IWG IQAL *********
4 0 0 4 0 0 0 1 9
END PRINT-INFO
IWAT-PARM1
<PLS > IWATER variable monthly parameter value flags ***
# - # CSNO RTOP VRS VNN RTLI ***
4 0 0 0 0 0
END IWAT-PARM1
IWAT-PARM2
New Vault 11/21/2022 1:11:16 PM Page 21
<PLS > IWATER input info: Part 2 ***
# - # *** LSUR SLSUR NSUR RETSC
4 400 0.01 0.1 0.1
END IWAT-PARM2
IWAT-PARM3
<PLS > IWATER input info: Part 3 ***
# - # ***PETMAX PETMIN
4 0 0
END IWAT-PARM3
IWAT-STATE1
<PLS > *** Initial conditions at start of simulation
# - # *** RETS SURS
4 0 0
END IWAT-STATE1
END IMPLND
SCHEMATIC
<-Source-> <--Area--> <-Target-> MBLK ***
<Name> # <-factor-> <Name> # Tbl# ***
Basin 1***
PERLND 11 6.7 COPY 501 12
PERLND 11 6.7 COPY 501 13
PERLND 17 0.78 COPY 501 12
PERLND 17 0.78 COPY 501 13
IMPLND 4 0.41 COPY 501 15
******Routing******
END SCHEMATIC
NETWORK
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSER 1
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
END NETWORK
RCHRES
GEN-INFO
RCHRES Name Nexits Unit Systems Printer ***
# - #<------------------><---> User T-series Engl Metr LKFG ***
in out ***
END GEN-INFO
*** Section RCHRES***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG ***
END ACTIVITY
PRINT-INFO
<PLS > ***************** Print-flags ******************* PIVL PYR
# - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR *********
END PRINT-INFO
HYDR-PARM1
RCHRES Flags for each HYDR Section ***
# - # VC A1 A2 A3 ODFVFG for each *** ODGTFG for each FUNCT for each
FG FG FG FG possible exit *** possible exit possible exit
* * * * * * * * * * * * * * ***
END HYDR-PARM1
HYDR-PARM2
# - # FTABNO LEN DELTH STCOR KS DB50 ***
New Vault 11/21/2022 1:11:16 PM Page 22
<------><--------><--------><--------><--------><--------><--------> ***
END HYDR-PARM2
HYDR-INIT
RCHRES Initial conditions for each HYDR section ***
# - # *** VOL Initial value of COLIND Initial value of OUTDGT
*** ac-ft for each possible exit for each possible exit
<------><--------> <---><---><---><---><---> *** <---><---><---><---><--->
END HYDR-INIT
END RCHRES
SPEC-ACTIONS
END SPEC-ACTIONS
FTABLES
END FTABLES
EXT SOURCES
<-Volume-> <Member> SsysSgap<--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # tem strg<-factor->strg <Name> # # <Name> # # ***
WDM 2 PREC ENGL 1.167 PERLND 1 999 EXTNL PREC
WDM 2 PREC ENGL 1.167 IMPLND 1 999 EXTNL PREC
WDM 1 EVAP ENGL 0.76 PERLND 1 999 EXTNL PETINP
WDM 1 EVAP ENGL 0.76 IMPLND 1 999 EXTNL PETINP
END EXT SOURCES
EXT TARGETS
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Volume-> <Member> Tsys Tgap Amd ***
<Name> # <Name> # #<-factor->strg <Name> # <Name> tem strg strg***
COPY 501 OUTPUT MEAN 1 1 48.4 WDM 501 FLOW ENGL REPL
END EXT TARGETS
MASS-LINK
<Volume> <-Grp> <-Member-><--Mult--> <Target> <-Grp> <-Member->***
<Name> <Name> # #<-factor-> <Name> <Name> # #***
MASS-LINK 12
PERLND PWATER SURO 0.083333 COPY INPUT MEAN
END MASS-LINK 12
MASS-LINK 13
PERLND PWATER IFWO 0.083333 COPY INPUT MEAN
END MASS-LINK 13
MASS-LINK 15
IMPLND IWATER SURO 0.083333 COPY INPUT MEAN
END MASS-LINK 15
END MASS-LINK
END RUN
New Vault 11/21/2022 1:11:16 PM Page 23
Mitigated UCI File
RUN
GLOBAL
WWHM4 model simulation
START 1948 10 01 END 2009 09 30
RUN INTERP OUTPUT LEVEL 3 0
RESUME 0 RUN 1 UNIT SYSTEM 1
END GLOBAL
FILES
<File> <Un#> <-----------File Name------------------------------>***
<-ID-> ***
WDM 26 New Vault.wdm
MESSU 25 MitNew Vault.MES
27 MitNew Vault.L61
28 MitNew Vault.L62
30 POCNew Vault1.dat
END FILES
OPN SEQUENCE
INGRP INDELT 00:15
PERLND 17
IMPLND 4
RCHRES 1
COPY 1
COPY 501
DISPLY 1
END INGRP
END OPN SEQUENCE
DISPLY
DISPLY-INFO1
# - #<----------Title----------->***TRAN PIVL DIG1 FIL1 PYR DIG2 FIL2 YRND
1 Vault 1 MAX 1 2 30 9
END DISPLY-INFO1
END DISPLY
COPY
TIMESERIES
# - # NPT NMN ***
1 1 1
501 1 1
END TIMESERIES
END COPY
GENER
OPCODE
# # OPCD ***
END OPCODE
PARM
# # K ***
END PARM
END GENER
PERLND
GEN-INFO
<PLS ><-------Name------->NBLKS Unit-systems Printer ***
# - # User t-series Engl Metr ***
in out ***
17 C, Lawn, Mod 1 1 1 1 27 0
END GEN-INFO
*** Section PWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC ***
17 0 0 1 0 0 0 0 0 0 0 0 0
END ACTIVITY
PRINT-INFO
<PLS > ***************** Print-flags ***************************** PIVL PYR
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC *********
New Vault 11/21/2022 1:11:16 PM Page 24
17 0 0 4 0 0 0 0 0 0 0 0 0 1 9
END PRINT-INFO
PWAT-PARM1
<PLS > PWATER variable monthly parameter value flags ***
# - # CSNO RTOP UZFG VCS VUZ VNN VIFW VIRC VLE INFC HWT ***
17 0 0 0 0 0 0 0 0 0 0 0
END PWAT-PARM1
PWAT-PARM2
<PLS > PWATER input info: Part 2 ***
# - # ***FOREST LZSN INFILT LSUR SLSUR KVARY AGWRC
17 0 4.5 0.03 400 0.1 0.5 0.996
END PWAT-PARM2
PWAT-PARM3
<PLS > PWATER input info: Part 3 ***
# - # ***PETMAX PETMIN INFEXP INFILD DEEPFR BASETP AGWETP
17 0 0 2 2 0 0 0
END PWAT-PARM3
PWAT-PARM4
<PLS > PWATER input info: Part 4 ***
# - # CEPSC UZSN NSUR INTFW IRC LZETP ***
17 0.1 0.25 0.25 6 0.5 0.25
END PWAT-PARM4
PWAT-STATE1
<PLS > *** Initial conditions at start of simulation
ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 ***
# - # *** CEPS SURS UZS IFWS LZS AGWS GWVS
17 0 0 0 0 2.5 1 0
END PWAT-STATE1
END PERLND
IMPLND
GEN-INFO
<PLS ><-------Name-------> Unit-systems Printer ***
# - # User t-series Engl Metr ***
in out ***
4 ROOF TOPS/FLAT 1 1 1 27 0
END GEN-INFO
*** Section IWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW IWAT SLD IWG IQAL ***
4 0 0 1 0 0 0
END ACTIVITY
PRINT-INFO
<ILS > ******** Print-flags ******** PIVL PYR
# - # ATMP SNOW IWAT SLD IWG IQAL *********
4 0 0 4 0 0 0 1 9
END PRINT-INFO
IWAT-PARM1
<PLS > IWATER variable monthly parameter value flags ***
# - # CSNO RTOP VRS VNN RTLI ***
4 0 0 0 0 0
END IWAT-PARM1
IWAT-PARM2
<PLS > IWATER input info: Part 2 ***
# - # *** LSUR SLSUR NSUR RETSC
4 400 0.01 0.1 0.1
END IWAT-PARM2
IWAT-PARM3
<PLS > IWATER input info: Part 3 ***
New Vault 11/21/2022 1:11:16 PM Page 25
# - # ***PETMAX PETMIN
4 0 0
END IWAT-PARM3
IWAT-STATE1
<PLS > *** Initial conditions at start of simulation
# - # *** RETS SURS
4 0 0
END IWAT-STATE1
END IMPLND
SCHEMATIC
<-Source-> <--Area--> <-Target-> MBLK ***
<Name> # <-factor-> <Name> # Tbl# ***
Basin 1***
PERLND 17 3.78 RCHRES 1 2
PERLND 17 3.78 RCHRES 1 3
IMPLND 4 4.11 RCHRES 1 5
******Routing******
PERLND 17 3.78 COPY 1 12
IMPLND 4 4.11 COPY 1 15
PERLND 17 3.78 COPY 1 13
RCHRES 1 1 COPY 501 16
END SCHEMATIC
NETWORK
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSER 1
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
END NETWORK
RCHRES
GEN-INFO
RCHRES Name Nexits Unit Systems Printer ***
# - #<------------------><---> User T-series Engl Metr LKFG ***
in out ***
1 Vault 1 1 1 1 1 28 0 1
END GEN-INFO
*** Section RCHRES***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG ***
1 1 0 0 0 0 0 0 0 0 0
END ACTIVITY
PRINT-INFO
<PLS > ***************** Print-flags ******************* PIVL PYR
# - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR *********
1 4 0 0 0 0 0 0 0 0 0 1 9
END PRINT-INFO
HYDR-PARM1
RCHRES Flags for each HYDR Section ***
# - # VC A1 A2 A3 ODFVFG for each *** ODGTFG for each FUNCT for each
FG FG FG FG possible exit *** possible exit possible exit
* * * * * * * * * * * * * * ***
1 0 1 0 0 4 0 0 0 0 0 0 0 0 0 2 2 2 2 2
END HYDR-PARM1
HYDR-PARM2
# - # FTABNO LEN DELTH STCOR KS DB50 ***
<------><--------><--------><--------><--------><--------><--------> ***
New Vault 11/21/2022 1:11:16 PM Page 26
1 1 0.02 0.0 0.0 0.5 0.0
END HYDR-PARM2
HYDR-INIT
RCHRES Initial conditions for each HYDR section ***
# - # *** VOL Initial value of COLIND Initial value of OUTDGT
*** ac-ft for each possible exit for each possible exit
<------><--------> <---><---><---><---><---> *** <---><---><---><---><--->
1 0 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
END HYDR-INIT
END RCHRES
SPEC-ACTIONS
END SPEC-ACTIONS
FTABLES
FTABLE 1
92 4
Depth Area Volume Outflow1 Velocity Travel Time***
(ft) (acres) (acre-ft) (cfs) (ft/sec) (Minutes)***
0.000000 0.161616 0.000000 0.000000
0.144444 0.161616 0.023345 0.038716
0.288889 0.161616 0.046689 0.054753
0.433333 0.161616 0.070034 0.067058
0.577778 0.161616 0.093378 0.077432
0.722222 0.161616 0.116723 0.086572
0.866667 0.161616 0.140067 0.094835
1.011111 0.161616 0.163412 0.102433
1.155556 0.161616 0.186756 0.109506
1.300000 0.161616 0.210101 0.116149
1.444444 0.161616 0.233446 0.122431
1.588889 0.161616 0.256790 0.128407
1.733333 0.161616 0.280135 0.134117
1.877778 0.161616 0.303479 0.139593
2.022222 0.161616 0.326824 0.144863
2.166667 0.161616 0.350168 0.149947
2.311111 0.161616 0.373513 0.154865
2.455556 0.161616 0.396857 0.159631
2.600000 0.161616 0.420202 0.164259
2.744444 0.161616 0.443547 0.168760
2.888889 0.161616 0.466891 0.173144
3.033333 0.161616 0.490236 0.177420
3.177778 0.161616 0.513580 0.181595
3.322222 0.161616 0.536925 0.185676
3.466667 0.161616 0.560269 0.189670
3.611111 0.161616 0.583614 0.193581
3.755556 0.161616 0.606958 0.197415
3.900000 0.161616 0.630303 0.201175
4.044444 0.161616 0.653648 0.204867
4.188889 0.161616 0.676992 0.208493
4.333333 0.161616 0.700337 0.212057
4.477778 0.161616 0.723681 0.215563
4.622222 0.161616 0.747026 0.219012
4.766667 0.161616 0.770370 0.222408
4.911111 0.161616 0.793715 0.225752
5.055556 0.161616 0.817059 0.229048
5.200000 0.161616 0.840404 0.232297
5.344444 0.161616 0.863749 0.235501
5.488889 0.161616 0.887093 0.238663
5.633333 0.161616 0.910438 0.241783
5.777778 0.161616 0.933782 0.244863
5.922222 0.161616 0.957127 0.247905
6.066667 0.161616 0.980471 0.250910
6.211111 0.161616 1.003816 0.253879
6.355556 0.161616 1.027160 0.256814
6.500000 0.161616 1.050505 0.259716
6.644444 0.161616 1.073850 0.262586
6.788889 0.161616 1.097194 0.265425
6.933333 0.161616 1.120539 0.268234
7.077778 0.161616 1.143883 0.296628
7.222222 0.161616 1.167228 0.311152
7.366667 0.161616 1.190572 0.322744
New Vault 11/21/2022 1:11:16 PM Page 27
7.511111 0.161616 1.213917 0.332864
7.655556 0.161616 1.237262 0.342049
7.800000 0.161616 1.260606 0.350570
7.944444 0.161616 1.283951 0.358586
8.088889 0.161616 1.307295 0.366198
8.233333 0.161616 1.330640 0.373478
8.377778 0.161616 1.353984 0.380478
8.522222 0.161616 1.377329 0.387236
8.666667 0.161616 1.400673 0.393782
8.811111 0.161616 1.424018 0.400141
8.955556 0.161616 1.447363 0.406332
9.100000 0.161616 1.470707 0.412372
9.244444 0.161616 1.494052 0.418273
9.388889 0.161616 1.517396 0.424048
9.533333 0.161616 1.540741 0.429706
9.677778 0.161616 1.564085 0.435256
9.822222 0.161616 1.587430 0.494219
9.966667 0.161616 1.610774 0.525105
10.11111 0.161616 1.634119 0.549472
10.25556 0.161616 1.657464 0.570602
10.40000 0.161616 1.680808 0.589683
10.54444 0.161616 1.704153 0.607308
10.68889 0.161616 1.727497 0.623825
10.83333 0.161616 1.750842 0.639457
10.97778 0.161616 1.774186 0.654360
11.12222 0.161616 1.797531 0.668647
11.26667 0.161616 1.820875 0.682404
11.41111 0.161616 1.844220 0.695697
11.55556 0.161616 1.867565 0.708579
11.70000 0.161616 1.890909 0.721093
11.84444 0.161616 1.914254 0.733274
11.98889 0.161616 1.937598 0.745154
12.13333 0.161616 1.960943 1.528222
12.27778 0.161616 1.984287 3.016942
12.42222 0.161616 2.007632 4.651074
12.56667 0.161616 2.030976 5.968770
12.71111 0.161616 2.054321 6.735204
12.85556 0.161616 2.077666 7.366197
13.00000 0.161616 2.101010 7.908280
13.14444 0.161616 2.124355 8.412985
END FTABLE 1
END FTABLES
EXT SOURCES
<-Volume-> <Member> SsysSgap<--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # tem strg<-factor->strg <Name> # # <Name> # # ***
WDM 2 PREC ENGL 1.167 PERLND 1 999 EXTNL PREC
WDM 2 PREC ENGL 1.167 IMPLND 1 999 EXTNL PREC
WDM 1 EVAP ENGL 0.76 PERLND 1 999 EXTNL PETINP
WDM 1 EVAP ENGL 0.76 IMPLND 1 999 EXTNL PETINP
END EXT SOURCES
EXT TARGETS
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Volume-> <Member> Tsys Tgap Amd ***
<Name> # <Name> # #<-factor->strg <Name> # <Name> tem strg strg***
RCHRES 1 HYDR RO 1 1 1 WDM 1000 FLOW ENGL REPL
RCHRES 1 HYDR STAGE 1 1 1 WDM 1001 STAG ENGL REPL
COPY 1 OUTPUT MEAN 1 1 48.4 WDM 701 FLOW ENGL REPL
COPY 501 OUTPUT MEAN 1 1 48.4 WDM 801 FLOW ENGL REPL
END EXT TARGETS
MASS-LINK
<Volume> <-Grp> <-Member-><--Mult--> <Target> <-Grp> <-Member->***
<Name> <Name> # #<-factor-> <Name> <Name> # #***
MASS-LINK 2
PERLND PWATER SURO 0.083333 RCHRES INFLOW IVOL
END MASS-LINK 2
MASS-LINK 3
New Vault 11/21/2022 1:11:16 PM Page 28
PERLND PWATER IFWO 0.083333 RCHRES INFLOW IVOL
END MASS-LINK 3
MASS-LINK 5
IMPLND IWATER SURO 0.083333 RCHRES INFLOW IVOL
END MASS-LINK 5
MASS-LINK 12
PERLND PWATER SURO 0.083333 COPY INPUT MEAN
END MASS-LINK 12
MASS-LINK 13
PERLND PWATER IFWO 0.083333 COPY INPUT MEAN
END MASS-LINK 13
MASS-LINK 15
IMPLND IWATER SURO 0.083333 COPY INPUT MEAN
END MASS-LINK 15
MASS-LINK 16
RCHRES ROFLOW COPY INPUT MEAN
END MASS-LINK 16
END MASS-LINK
END RUN
New Vault 11/21/2022 1:11:16 PM Page 29
Predeveloped HSPF Message File
New Vault 11/21/2022 1:11:16 PM Page 30
Mitigated HSPF Message File
New Vault 11/21/2022 1:11:16 PM Page 31
Disclaimer
Legal Notice
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program even
if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2022; All
Rights Reserved.
Clear Creek Solutions, Inc.
6200 Capitol Blvd. Ste F
Olympia, WA. 98501
Toll Free 1(866)943-0304
Local (360)943-0304
www.clearcreeksolutions.com
Core Design, Inc. TOWNS ON 12TH Page 10-4
Appendix B
Special Reports
Core Design, Inc. TOWNS ON 12TH Page 10-5
Insert reports referenced in section 6