Loading...
HomeMy WebLinkAboutR-412713N T i 0 w I � I � � \ o V) + 0 co 0 (7) � N I � u STA 1+00.00=STA 4+01.8 INTERSECTION OF PROPOSED ALL X I �I o CENTERLINE AND GLENNWOOD AVE E X > • CENTERLI E X xc) x x X V) X X X X X X X X _. X X X Z`, 'a I� X(7* X X X I RO X X X X I X X - X X I X X X*X I 0- 0 X X X I X X X 355 B1+i�� �T tM RCS• 335 FOUND 3/4" IRON PIPE 0.39'S, 0.31'W OF PROP COR 21.3;Z� 12' WIDE COR STA FOUND PK NAIL W/ FLASHER BM #33127 ELEV=344.56' co GO M cn REFER TO ONSITE PLANS _.r,: ;f 16.1A .. FOR STORM DRAINAGE AND /AA �• ��I IN ROK ....��� PER ASPHALT WOOD FENCE COR - ;1 (TYP) • M• CONCRETE PROP LINE ., ., Z4Z. 12 is • a�- •�- I �' 1 �ooil R8W8W m� .. ��,r...mill I= MIS 1�1 �A'_.. e - .�1i7►�- r � Imo ■��._�1 ■1 ■■■I■1 . i i - ,� I■ ■I ■ 1■■i�11•i7i7�i1i77i ill��ilLl�!=41■11�!. �r�il■■I■1 � �� : WA _ .l I' `� ; i rr I I ■1 1:■F�f�l�'� ��':: �I 11 FMF 44I[ If: 71 ■■■ ■ice - . . Ih : ir; t �I G \�■■ 11 ■III`_"mANi1■1:,�::la1■■■■■I1■Ib7.�1�l�■ �I■■ I �� 0 1 '.0" , . l�Jl�i 1►r.1[T.1C-i:r-11rw M' _'VII//l:_�ZFrA_I/!A��AWAWIr ili:L7i1MIIIS�►!!7th'll� a^ • ELEV- '�I ■1 I■IY`iJ�li■IIL1�\`�i .■����ilrl■Y■Y■■II►3�1■ ■ �� I `■1 t� 0==1I1: II■: �F■\ ' iI I "'I:":.� FAWMWAVAMMErZa'-',■ ■■■ ■■Isti ,'' ' ■ _ 'I\� �� ■�\IE�I■ Itl III■i CY.YrS T T.T►►.7■LWA I ■■irJ 11 ■1 rrl=1�■1l •�• ■■fi�lii■ WA 11111 UM IIAIIIIMIIf1■iI�IL■ ■II 111■ I■111■ii■Y\11 a111LYY111 AIL SET N IELE CB T-1 RIM (SOLID)=344.07 12" PVC (N)=340.82' 12" CONC (S)=340.82' ................................................................ 1 +21.39, 5.50' LT „ " : 6" FH PV1 STA:2+71.1 D 1 - 10 X6 TEE (MJXFL) PVI STA:1 +59.30 PVI ELEV�347.17 PVI ELEV 344.44 . 1 = 6" GATE VALVE FLXMJ 150.0' VC ( ) PVI ELEV:342.85 9.9. VC m N 1 - - -FIRE HYDRANT ASSEMBLY: . . . 5.0'' V . rn _ 1.. -..CONC.: THRUST BLOCK. .....PVI..STA:.1 +34.69........ , _ r..........................................:........ q .��I , .o...., ........... F . . �. PVI ELEV:341.62 0 . rn `o `a " w . . . . . . . . . . z c� 10.0' VC: o00 00 00 + � : zo LIJ N Q. M M U Z w \ 00 : Lr) N Lei - - - _ vj l� I <C 0- - W Q O c') �' Q ^ Ln pj:� + M + M >: -.- - - _ ?U j X Q X LU 3.�....L....E �...... + + Nv w - -- o U. �.........>. �..........:...... w . Y. z. w cii :.. > m [�J 3.$7% ... .r 0 ........... . �. ,< - � Li o w m 3+44. 489, I� M. o ;-,= z c� c� �' 1+65.25 ROPOSED- CENTERLINE' OF ALLEY - - > N o z o . d o > o > > rii . " XISTING GRADE EX GAS SERVICE ~ o w v x m m z 0° 0° 5,00% 4; FIRE SERVICE 3+69.7 w of o v_ o .� .c� o S a . - z. 00 1 +52Z5 1 +76.50 . . EX POWER SERVICE + o � a N o 0 2+23.05 l w w c N U188 - - - - - -r PERT. PIP 1.15° VERTICAL 3+59.69--�'0 1 "� v a m z .a .� c� _ . . . . .1.0.6° HORIZONTAL . o z z z I-w JOINT DEFLECTION 'PIPE Cq +.o. m.o. LIJ o x. w .. JOINT DEFLECTIO ". U "c' > `.'..�. � cn POWER SERVICE "' 00 : 3+54.6 0+98.7 18" STORM 1+94.13 121.�55'� " DIP:@ -2.00% 3+07.3 1.5" IRRIGATION WA SERV +2-6.50 1+51.50 2" DOM A SERV, BLDG B . . . 1.5" DOM WA SERV, BLDG C -174.60' 10 DIP ®0:0% 8".EX SS MAIN I �� 2.5°. HORIZONTAL. 2.5' HORIZONTAL 1+91.1 . . . . . . . . . . . . . . . . 3+7fi.55 JOINT DEFLECTION JOINT DEFLECTION 1.5" D M WA SERV; BLDG A (ACTUAL DEPTH LOWER THAN SHOWN) 1+00 2+00 3+00 4+00 co erra ENGINEERING PLLC 321 3rd Ave South, Suite 406 Seattle, Washington 98104 ph 206.596.7115 coterraengineering.com ALLEY PROFILE SCALE: HORZ. 1" = 20' VERT. 1" = 5' Kel STA 3+91.08=STA 7+23.28 INTERSECTION OF PROPOSED ALLEY CENTERLINE AND I HARRINGTON AVE NE CENTERLINE I 355 CN U 350 cV J 0 z 345 U w z z 0 U L IJ Cn 340 335 NORTH PROP LINE 16' WIDE DEDICATION PROP ROW LINE 2' 12' PUBLIC ALLEY 2' 6' I 6' CENTERLINE OF ALLEY DRIVE AISLE (PROFILE POINT) 2.0% MATCH EXISTING GRADE (lYP) J � CONC. VERTICAL CURB CONC. VERTICAL CURB PER DETAIL 5/C6J PER DETAIL 1/C6.6 PERMEABLE ASPHALT CONC OR PAVEMENT PER DETAIL 6/C6.6 FLUSH CONC CURB PER TYPICAL SECTION DETAIL 7/C6.6 NTS REVISION SURVEYED: DESIGNED: HS DRAWN: HS CHECKED: PA BY DATE APPR APPROVED: SCALE: 1 "=20' ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY VERTICAL• NAVD 1988 HORIZONTAL, NAD 1983/1991 DATUM DATUM NAVD 88 LEGEND VEHICULAR PERMEABLE PAVERS 6 REFER TO LA PLANS FOR FINISH C6. PERMEABLE PAVERS 6 REFER TO LA PLANS FOR FINISH C6. ASPHALT CONC. PAVEMENT 4 C6. 6 PERMEABLE ASPHALT CONC. PAVEMENT C6. PERMEABLE CEM. 6 CONC. SIDEWALK C6. CEM. CONC. PAVEMENT )j 3 5 C6. C6. CONC CURB AND GUTTER 1 C6. - - - SAWCUT LINE _ 3 4 FIRE HYRANT C6. C6. DOMESTIC WATER 5 SERVICE METER C6. 6 z WATER VALVE C6. POST INDICATOR VALVE FIRE DEPT CONNECTION 7 ® CONC THRUST BLOCKING HORIZ C6. WATER/FIRE SERVICE NOTES 1. AN AUTOCAD FILE WILL BE PROVIDED TO THE CONTRACTOR FOR LAYOUT. 2. COORDINATE WORK WITH ARCHITECTURAL AND LANDSCAPE ARCHITECTURAL DRAWINGS. 3. SEE ARCHITECTURAL SITE PLAN FOR ADDITIONAL SITE INFO. 4. SEE SHEET C1.0 AND C1.1 FOR GENERAL NOTES. CONSTRUCTOR RECORD DRAWING THE INFORMATION ON THIS DRAWING INDICATES CHANGES MADE TO THE CONSTRUCTION DOCUMENTS BASED UPON UTILITY AS -BUILT SURVEY PREPARED BY D.R. STRONG CONSULTING ENGINEERS INC., DATED 12/10/21, AND TRANSFERRED TO THE REPRODUCIBLE DRAWINGS BY THE ENGINEER. CITY OF RENTON Planning/Building/Public Works Dept. J T I O) O O 0 m v! � G W 0- Z 0 U rr� 0 Z 0 U J_ u H z IN COMPLIANCE WITH CITY OF RENTON STANDARDS w SUNSET OAKS APARTMENTS SUNSET LANE NE, RENTON, WA ALLEY PLAN AND PROFILE I - a Q U) Q DATE: 10/5/20 O FIELDBOOK: LU PAGE: DRAWING NO: C5.0 z SHEET: 13 OF: 36 �,/ � r /'\