HomeMy WebLinkAbout20160674E003 Bethany Corner 2023-02-02 TESC 110.pdf
www.aesgeo.com
This document is considered DRAFT until reviewed and initialed by an AESI Project Manager
Temporary Erosion and
Sediment Control Monitoring
DATE PROJECT NAME AESI PROJECT NO. TESC REPORT NO.
2/02/2023 Bethany Corner 20160674E003 110
LOCATION CITY MUNICIPALITY CSWGP
16451 111th Ave SE Renton Renton WAR307077
PREVIOUS SITE VISIT CLIENT/OWNER WEATHER 24 HOUR RAINFALL PAST WEEK RAINFALL
1/26/2023
Mark Seek (Tiger Mountain
Homes) P/C, 50's 0.00" 0.30"
AESI FIELD REP Catherine Ikeda AESI PROJECT MANAGER Matthew A. Miller,
P.E.
Catherine Ikeda
QUALITY/CONDITION (SEE SWPPP FOR BMP LOCATIONS)
CONSTRUCTION ENTRANCE SITE RESTRICTED ACCESS
Asphalt pavement No
WHEEL WASH SEDIMENT TRACK OUT
N/A Some sediment trackout
ROADWAY SURFACE CATCH BASIN
Asphalt silt socks installed, along 165th St - need repair
LIMITS BUFFER AREA STABILIZATION
Silt fence Landscaping grass, bark
SILT FENCING CONCRETE WORK (Sidewalks, curbing, foundation)
Installed along N, S, and W perimeter - needs repairs None observed
COVER MEARSURES OVERALL STRAW
Fair N/A
PLASTIC SHEETING HYDROSEED
N/A Sidewalk planters
CONVEYENCE CHANNEL CHECK DAMS
N/A N/A
STOCKPILE COVER PIPE SLOPE DRAINS
N/A N/A
LEVEL SPREADER LANDSCAPE/MULCH
South side of site Sidewalk planters, actively landscaping
SEDIMENT POND TRAP SEDIMENT POND INLET/OUTLET
Detention vault N/A
SEDIMENT POND SIDE SLOPES SURFACE WATER OBSERVATION
(Creek, Wetland, or Lake) (Clear, Turbid, Sheen)
Concrete (detention vault) turbid puddles
WATER QUALITY SAMPLE TURBIDITY (NTU) pH OVERALL
Yes 4 6.0 BMPs fair
SAMPLE LOCATION AREAS OF CONCERN
SE of site: 111th Ave swale outfall Silt fence, silt socks
CORRECTIVE ACTIONS
repair silt fence, replace silt socks
PAST CORRECTIVE ACTIONS
None
Is this site in compliance with the terms and conditions
of the SWPP and CSWGP discharge Permit?
Yes
www.aesgeo.com
TESC REPORT
DATE CSWGP PROJECT NO. TESC REPORT NO.
2/02/2023 WAR307077 20130674E003 110
Sample Location Approximate Flow Turbidity NTU/Transparency pH Compliance
111th Ave Swale
outfall
4 6.0 Yes
ADDITIONAL COMMENTS:
While onsite, AESI observed the silt fence to need repairs in some areas around the site. AESI recommended repairing
the silt fence on the western perimeter by building 6 and replacing the silt socks in the catch basins on 165th St. Utility
and sewer work were ongoing. The contractor notified AESI that there were plans to place straw on exposed soils once
the utility work was completed. AESI took a water sample from the 111th Ave swale outfall. The turbidity of the water
came back at 4 NTU. This is in compliance with the SWPP.