Loading...
HomeMy WebLinkAboutMFP23000551DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP23000551 IVR Number: 23000551 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:02/01/2023Application Date:1923059023Parcel Number: 707 S GRADY WAY Permit Type:02/14/2023Issue Date:Franchise Permit Work Class:02/14/2024Expiration Date:Minor Utility Job Number: 101157901Franchise Type:Electric Description: Puget Sound Energy Electric RUSH REQUEST SUPSTATION WORK Replacing getaways off the sub stations through vaults. Any Restorations Per COR Standards. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact NEPTUNE III TT LLC 777 THIRD AVE 25TH FL NEW YORK , NY 10017 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 101157901 707 S GRADY WAY RICHARD MILLER 253-355-6930 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG 707 S Grady Way Renton WA 98057 USA ONLYONLYO N L Y ONL Y T A L BO T R D S S GR A D Y W A Y11111111111111 11 1 1 1 1 1 1 GRA SUB-STATION PSE PUGETSOUNDENERGY BUSSTOPONLY1111111111 © ©TALBOT RD SPV1 PV4 PV2 PV3 SPEEDLIMIT35 SPEED LIMIT35 TALBOT RD SARRW-BRDRIGHT LANECLOSEDAHEADW20 - 5R W4-2RROADWORKAHEADW2 0 -1350 ' 35 0 ' 3 5 0 'THRUTRAFFICMERGERIGHTW4 -7R 350'ROADWORKAHEADW20-1350'ROADWORKAHE AD W20-1 3 5 0 ' S GRA D Y W A Y X'X'PLACE W20-1 SIGNS ON ALL ADJACENT PUBLIC STREETS WHERE TRAFFIC COULD ENTER WORK AREA WITHIN 1050 FEET OF WORK AREA ROADWORKAHEAD W20-1ROADWORKAHEADW20-1DETOURM4 - 9 b R 9 - 1 1 SIDEWALKCLOSEDAHEADS/WCLOSEDR9- 9 S/WCLOSEDR9-9DETOUR M4-9bR9-11SIDEWALK CLOSED AHEAD PLACE PDETOUR SIGNS AT CROSSWALK/ INTERSECTION NORTH/WEST OF S RENTON VILLAGE PL & TALBOT RD S. TEMPORARY TRAFFIC CONTROL PLAN N SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV Safaa Al Neema (425) 398-6077 safaa.alneema@pse.com 1 OF 3707 S Grady Way, Renton, WA 98057 0 101157901 01/31/2023 Puget Sound Energy Traffic Control Supervisor:Safaa Al Neema Card No. 012611 Card Exp. 10/31/2024 Safaa.alneema@pse.com (425)398-6077 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 10' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 28" TRAFFIC CONE TRAFFIC FLOW SIGN LOCATION LEGEND VAULTVault ARRW-BRD DBL WAY ARROW BOARD WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY 707 S Grady Way Renton WA 98057 USA T A L B O T R D S S GRA D Y W A Y GRA SUB-STATION PSE PUGETSOUNDENERGY BUSSTOPONLY1111111111 © ©TALBOT RD SS RENTON VILLAGE PL TALBOT RD SPV1 PV4 PV2 PV3 SPEEDLIMIT35 SPEED LIMIT35 TALBOT RD SARRW-BRDRIGHT LANECLOSEDAHEADW20-5RW4-2RROADWORKAHEADW20-1350'350'350' ROAD WORK AHEAD W20-1X'USE MAXIMUM AVAILABLE SPACE FOR SIGNS MOVE BUS STOP 300' SOUTH. NOTIFY KING COUNTY METRO CONTACTED AT 206-477-1150 FIVE DAYS IN ADVANCE OF SCHEDULED DATE.X'X'PLACE W20-1 SIGNS ON ALL ADJACENT PUBLIC STREETS WHERE TRAFFIC COULD ENTER WORK AREA WITHIN 1050 FEET OF WORK AREA ROADWORKAHEAD W20-1ROADWORKAHEADW20-1DETOURM4-9bR9-11SIDEWALK CLOSED AHEAD S/WCLOSEDR9-9S/WCLO S E DR9-9DETOURM4-9bR9-11SIDEWALKCLOSEDAHEADPLACE PDETOUR SIGNS AT CROSSWALK INTERSECTION SOUTH/WEST OF S GRADY WAY & TALBOT RD S. Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV Safaa Al Neema (425) 398-6077 safaa.alneema@pse.com 2 OF 3707 S Grady Way, Renton, WA 98057 0 101157901 01/31/2023 Puget Sound Energy Traffic Control Supervisor:Safaa Al Neema Card No. 012611 Card Exp. 10/31/2024 Safaa.alneema@pse.com (425)398-6077 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 10' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 28" TRAFFIC CONE TRAFFIC FLOW SIGN LOCATION LEGEND VAULTVault CHEVRON ARROW BOARD WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY TEMPORARY TRAFFIC CONTROL PLAN N SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 707 S Grady Way Renton WA 98057 USA 707 S Grady Way, Renton, WA 98057 TALBOT RD S S GRA D Y W A Y GRA SUB-STATION PSE PUGETSOUNDENERGY BUSSTOPONLY1111111111 © ©TALBOT RD SS RENTON VILLAGE PL TALBOT RD SPV1 PV4 PV2 PV3 SPEEDLIMIT35 SPEED LIMIT35 TALBOT RD SARRW-BRD 350'ROADWORKAHEADW20-1350'ROADWORKAHEADW20-1 RIGHT LANECLOSEDAHEAD W20-5RW4-2RROAD WORK AHEAD W20-1350'350'350'ROADWORKAHEADW20-1350' DETOU R M4-9bR9-11SIDEW A L K CLOSE D AHEAD DETOURM4-9bR9-11SIDEWALKCLOSEDAHEADPLACE PDETOUR SIGNS AT CROSSWALK/ INTERSECTION SOUTH/EAST OF S GRADY WAY & TALBOT RD S.S/WCLOSEDR9-9S/WCLOSED R9-9Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV Safaa Al Neema (425) 398-6077 safaa.alneema@pse.com 3 OF 3707 S Grady Way, Renton, WA 98057 0 101157901 01/31/2023 Puget Sound Energy Traffic Control Supervisor:Safaa Al Neema Card No. 012611 Card Exp. 10/31/2024 Safaa.alneema@pse.com (425)398-6077 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 10' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 28" TRAFFIC CONE TRAFFIC FLOW SIGN LOCATION LEGEND VAULTVault CHEVRON ARROW BOARD WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY TEMPORARY TRAFFIC CONTROL PLAN N SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 14 15 16 17 26 25 GRA SUB-STATION P# 192305-9094 707 P# 192305-9023 700 P# 19230-5001 P# 202305-9007 P# 202305-9008TALBOT ROAD SEIY807 - AØ EIY808 - BØ EIY808 - CØ 33005 - AØ 33006 - BØ 33007 - CØ 33002 - AØ 33003 - BØ 33004 - CØ 33017 - AØ 33018 - BØ 33019 - CØ 33008 - AØ 33009 - BØ 33010 - CØ 1415 16 17 26 25 GRA SUB 101157901Potelco, Inc.DESIGNED BY No No No Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" MAKE NO CHANGES TO THIS JOB WITHOUT PRIOR APPROVAL Notify Customers and Service Area 48 HRS Prior To Planned Outages ORDER#NOTIF#PROJECT PHASE MAINTENENCE O & M SUPERIOR FAILED SILICONE REMOVAL EXPENSE 11918054 101157901 - 108144065 594153459 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG OVERHEAD CIRCUIT MAP: 2305E076 SCALE: 6" = 1 MILE SITE PLAN SCALE: 1:50 FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP R. MILLER 253-355-6930 1/27/23 L. NEELY 253-569-2523 1/27/23 --- R. MILLER 253-355-6930 1/27/23 REQ-CITY OF RENTON GRA-14,15,16,17 & 25, 26 707 S GRADY W REPL GRA-14,15,16,17, 25, 26 TO FIRST VAULT 707 S GRADY WAY, RENTON, WA 98057 N/A N/A N/A 101157901 AS NOTED 1/1 KING --QCSOKE NE-19-05-23 N/A N/A 2305E073 2305E076 2305E073 GRA N/A N/A N/A N/A N/A N/A N/A N/A N/A SITE NOTES: GRA14 - REPLACE 750MCM SUB GETAWAYS AND TERMS (6041.3000 - TER750C) FOR CABLES (EIY807, EIY808 & EIY809) GRA15 -REPLACE 750MCM SUB GETAWAYS AND TERMS (6041.3000 - TER750C) FOR CABLES (33017, 33018 & 33019) GRA16 - REPLACE 750MCM SUB GETAWAYS AND TERMS (6041.3000 - TER750C) FOR CABLES (33002, 33003 & 33004) GRA17 - REPLACE 750MCM SUB GETAWAYS AND TERMS (6041.3000 - TER750C) FOR CABLES (32999, 33000 & 33001) GRA25 - REPLACE 750MCM SUB GETAWAYS AND TERMS (6041.3000 - TER750C) FOR CABLES (33005, 33006 & 33007) GRA26 - REPLACE 750MCM SUB GETAWAYS AND TERMS (6041.3000 - TER750C) FOR CABLES (33008, 33009 & 33010) SITE NOTES: PV1 TO GRA14 BKR: - REPLACE 3 CABLES W/ 750 MCM PRI CABLES & 1 CU 4/0 NEUT +/-225' - INSTALL CABLE #'S EIY807, EIY808, EIY809 - SUBSTATION CREW TO MAKEUP NEW 750 TERMS AT BKR - TRANSFER EXISTING CABLE TAGS PV2 TO GRA15 BKR: - REPLACE 3 CABLES W/ 750 MCM PRI CABLES & 1 CU 4/0 NEUT +/-250' - INSTALL CABLE #'S 33017, 33018, 33019 - SUBSTATION CREW TO MAKEUP NEW 750 TERMS AT BKR - TRANSFER EXISTING CABLE TAGS PV3 TO GRA16 BKR: - REPLACE 3 CABLES W/ 750 MCM PRI CABLES & 1 CU 4/0 NEUT +/-225' - INSTALL CABLE #'S 33002, 33003, 33004 - SUBSTATION CREW TO MAKEUP NEW 750 TERMS AT BKR - TRANSFER EXISTING CABLE TAGS PV3 TO GRA17 BKR: - REPLACE 3 CABLES W/ 750 MCM PRI CABLES & 1 CU 4/0 NEUT +/-225' - INSTALL CABLE #'S 32999, 33000, 33001 - SUBSTATION CREW TO MAKEUP NEW 750 TERMS AT BKR - TRANSFER EXISTING CABLE TAGS PV4 TO GRA25 BKR: - REPLACE 3 CABLES W/ 750 MCM PRI CABLES & 1 CU 4/0 NEUT +/-225' - INSTALL CABLE #'S 32999, 33000, 33001 - SUBSTATION CREW TO MAKEUP NEW 750 TERMS AT BKR - TRANSFER EXISTING CABLE TAGS PV4 TO GRA26 BKR: - REPLACE 3 CABLES W/ 750 MCM PRI CABLES & 1 CU 4/0 NEUT +/-225' - INSTALL CABLE #'S 33008, 33009 & 33010 - SUBSTATION CREW TO MAKEUP NEW 750 TERMS AT BKR - TRANSFER EXISTING CABLE TAGS PRIMARY CABLE TABLE - REMOVAL LOCATION PRIMARY CABLE ASBUILT INFORMATION FROM TO SIZE DESIGN LENGTH (ft) CABLE NUMBERS PLEASE RECORD (FOREMAN TO COMPLETE) A B C MANUFACTURER YEAR ACTUAL AMOUNT INSTALLED (CONDUIT & CABLE) GRA14 PV1 750MCM 215 EIY807 EIY808 EIY809 GRA15 PV2 750MCM 225 33017 33018 33019 GRA16 PV3 750MCM 225 33002 33003 33004 GRA17 PV3 750MCM 210 32999 33000 33001 GRA25 PV4 750MCM 215 33005 33006 33007 GRA26 PV4 750MCM 215 33008 33009 33010 PRIMARY CABLE TABLE - INSTALL LOCATIO N CABLE ASBUILT INFORMATION - FOREMAN COMPLETE FROM TO QT Y BENDS PULL (lbs) PULL REV (lbs) SIZE DESIGN LENGTH (ft) PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED 90 45 22 11 A B C MANUFACTURER COMPOUND YEAR NOTES CABLE GRA14 PV1 1 1393 1300 750MCM 225 EIY807 EIY808 EIY809 GRA15 PV2 1 993 1347 750MCM 250 33017 33018 33019 GRA16 PV3 1 918 1249 750MCM 225 33002 33003 33004 GRA17 PV3 1 833 1163 750MCM 225 32999 33000 33001 GRA25 PV4 1 1557 1123 750MCM 210 33005 33006 33007 GRA26 PV4 1 1615 1120 750MCM 210 33008 33009 33010 TOTAL TOTAL 750MCM 1,345' OVERHEAD CIRCUIT MAP: 2305E076 SCALE: 6" = 1 MILE JOB SITE