Loading...
HomeMy WebLinkAboutAddendum No. 1 West Hill Booster Pump Station Improvements Project ADDENDUM NO. 1 West Hill BPS-Addendum No. 1\ Page 1 of 1 February 6, 2023 West Hill Booster Pump Station Improvements Project WTR-27-04184 – CAG-23-005 Addendum No. 1 Date of Addendum Issue: February 6, 2023 Due Date for Bids: February 28, 2023 Notice to All Plan Holders and/or Prospective Bidders: The following changes, additions, deletions and/or clarifications are hereby made a part of the project bid documents for the above-named project and shall have the same effect as if set forth therein. Bidders shall acknowledge the receipt of this Addendum No. 1 in the place provided in the Acknowledgement of Receipt of Addenda. Failure to do so may result in your bid proposal being disqualified. PLANS 1. DELETE Drawing E02, Sheet 16 of 32, and REPLACE with attached Revised Drawing E02, Sheet 16 of 32. Revisions include: Update construction call out: Delete PROPOSED STANDBY GENERATOR PROVIDED BY THE OWNER, INSTALLED BY CONTRACTOR, and replace with PROPOSED STANDBY GENERATOR PROVIDED AND INSTALLED BY CONTRACTOR. QUESTIONS/CLARIFICATIONS 2. Is the Generator provided by the Owner or by the Contractor? The plans indicate it is provided by the owner, but the specification says that the Contractor is to provide it? Please advise? Answer: The contractor shall furnish and install the Generator. 3. Will there be a pre-bid walk through offered for this property? We would like to get recent pictures of the site and interior of the building. Answer: Yes, there will be a non-mandatory pre-bid walkthrough at the existing booster pump station building on February 16, 2023, at 10:00 am. ALL OTHER REQUIREMENTS OF THE CONTRACT PROVISIONS REMAIN IN EFFECT. Ken Srilofung, P.E., Project Manager, City of Renton