Loading...
HomeMy WebLinkAboutRevised Plan #E02MBDMWBJan 20, 2023Jan 20, 2023REN21-0234WHBPS-D-ELEC02.DWGSHOWN E02 16 32 DWG NO.:DATEDESCRIPTIONREVISIONSBYREVIEWENGINEER:SAVE DATE:REVIEWED:PLOT DATE:CLIENT:FILENAME:SHEET NO.:JOB NO.:NO.0"1"2" DRAWING IS FULL SCALE WHEN BAR MEASURES 2" SCALE:ONE-LINE DIAGRAMCITY OF RENTONWEST HILL BOOSTER PUMP STATIONIMPROVEMENTS PROJECTCITY OF RENTONWEST HILL BOOSTER PUMP STATIONIMPROVEMENTS PROJECT001/20/23ISSUED FOR BIDDINGLJBRJF480/277V WEST HILL BPS ONE-LINE DIAGRAM 400/3 TM INSIDE OUTSIDE MOTOR CONTROL CENTER "MCC", 480V, 3Ø 50/2 TM 600/3 ET, LSI 600/3 TM PROPOSED STANDBY GENERATOR PROVIDED BY OWNER, INSTALLED BY CONTRACTOR. M 240/120V "L" CURRENT TRANSFORMER CABINET, TO BE REPLACED UTILITY METER, TO BE REPLACED PAD-MOUNT TRANSFORMER, TO BE REPLACED PRIMARY SERVICE 60 HP EXISTINGBAY 2 PUMP60 HP EXISTINGBAY 3 PUMP400KW 150/3 TM 150/3 TM SSRVS SSRVS 600/3 ET, LSI, SE PROPOSED MAIN SERVICE DISCONNECT ATS PROPOSED AUTOMATIC TRANSFER SWITCH, "ATS" PROPOSED LOAD BANK CIRCUIT BREAKER 75 HP PUMP 275 HP PUMP 3150 HP PUMP 1MOTOR CONTROL CENTER "MCC", 480/277V, 3Ø, 4W, 600A BUS, 42 KAIC WITHSTAND GND BUS NEUTRAL SPD "L1" 240/120V 5% REACTORS 5% REACTORS 600/3 ET, LSI DIGITAL METER HARMONIC FILTER HARMONIC FILTER 200/3 TM 300/3 TM 70/2 TM PROPOSED MOTOR CONTROL CENTER 5% REACTORS HARMONIC FILTER 200/3 TM 480V 25 kVA 1Ø, 3W, 240/120V 200/3 TM 60 HP 1. PROPOSED UTILITY METERING. METER BASE AND ENCLOSURE BY CONTRACTOR PER SERVING UTILITY REQUIREMENTS. METER BY PUGET SOUND ENERGY. 2. GROUNDING PER DETAIL, THIS SHEET. 3. GROUND ROD PER N.E.C. (TYPICAL). SEE DWG NO. E12 FOR DETAIL. 4. EXISTING BAY 2 PUMP TO BE REUSED AS PUMP 1. 5. PROPOSED FUSING OR CIRCUIT BREAKER PER SURGE PROTECTION DEVICE MANUFACTURER'S RECOMMENDATION. 6. CONNECT EXISTING GROUNDING SYSTEM TO PROPOSED GROUND BUS. EXTEND EXISTING GROUND ELECTRODE CONDUCTOR WITH PROPOSED GROUND ELECTRODE AS NECESSARY TO REACH TERMINATION POINT. 7. SEE DWG NO. E13 FOR CONDUIT AND CONDUCTOR SCHEDULE. 8. SEE DWG NO. E13 FOR ELECTRICAL EQUIPMENT SCHEDULE. ELECTRICAL NOTES STATION LOAD CALCULATIONS PUMP 4 (150 HP)180 A X 1.25 =225 AMPS PUMP 3 (75 HP)96 A X 1.00 =96 AMPS PUMP 2 (75 HP)96 A X 1.00 =96 AMPS PUMP 1 (60 HP)77 A X 0.00 =0 AMPS HEATER 1 7.5 A X 1.00 =7.5 AMPS HEATER 2 7.5 A X 1.00 =7.5 AMPS LIGHTING TRANSFORMER (25 kVA)52.1A X 1.00 =52.1 AMPS TOTAL 484.1 AMPS #4 MIN. GND BUS #6 MIN. S/N GROUNDING #2/0 MIN.#2/0 MIN. PUMP MOTOR, TYP WATER PIPE SERVICE ENTRANCE DISCONNECT SWITCH LIGHTING TRANSFORMER UFER CONNECTION BUILDING REBAR MAT 5% REACTORS DV/DT FILTER 600/3 ET, LSI PROPOSED GENERATOR DISCONNECT PUMP 420/3 TM 20/3 TM HEATER 5KW HEATER 1HEATER 5KW HEATER 22K 1G 2F, 3K 4A 5A, 6K 7A, 8K 9F, 10F 3G 3I 1A "L2" 240/120V EXISTING MOTOR CONTROL CENTER, TO BE REMOVEDEXISTING CONDUCTORS FROM TRANSFORMER SECONDARY TO BE REMOVED PROPOSED STANDBY GENERATOR PROVIDED AND INSTALLED BY CONTRACTOR 1 ADDENDUM NO. 1 ADDENDUM NO. 1102/06/23