Loading...
HomeMy WebLinkAboutM.Hazmat_Report_1171_Kirkland_Ave_NE_20200603_v1ASBESTOS NORTHWEST LLC SURVEY REPORT 30620 Pacific Hwy S Suite 103 Federal Way, WA 98003 Tel: 253 941 4343 Fax: 253 941 4175 1 Asbestos Northwest, LLC - Survey Report 30620 Pacific Hwy S, #103, Federal Way, WA 98003 253.941.4343 Survey Location: 1171 Kirkland Ave NE Renton WA Prepared for: Ascendent Demolition LLC Date: April 29th, 2020 Asbestos Northwest Batch Number: 202011788 Inspector: Sean Butler (#173733) E-mail: seanb@asbestosnw.com ASBESTOS NORTHWEST LLC SURVEY REPORT 30620 Pacific Hwy S Suite 103 Federal Way, WA 98003 Tel: 253 941 4343 Fax: 253 941 4175 2 Contents 1. Background Information and Scope of Work ............................................................................ 3 2. Building Description ................................................................................................................. 4 Structural System ..................................................................................................................................... 4 Finishing Materials ................................................................................................................................... 4 Mechanical system ................................................................................................................................... 4 Electrical system ....................................................................................................................................... 4 Insulation ..................................................................................................................................................... 4 Roofing ........................................................................................................................................................ 4 Outbuildings ............................................................................................................................................... 4 3. Material Sampling Information .................................................................................................. 5 Definitions ................................................................................................................................................... 5 Survey Methodology ................................................................................................................................ 5 4. Asbestos Containing Material ................................................................................................... 7 5. Conclusions ............................................................................................................................. 8 Appendix A – Certifications ............................................................................................................. 9 Appendix B – Building Layout ....................................................................................................... 11 Front Lobby ................................................................................................................................... 12 Main Room West Side .................................................................................................................. 12 Asbestos Containing Floor Tiles .................................................................................................... 13 Main Room East Side ................................................................................................................... 13 Appendix C – Laboratory Report ................................................................................................... 14 ASBESTOS NORTHWEST LLC SURVEY REPORT 30620 Pacific Hwy S Suite 103 Federal Way, WA 98003 Tel: 253 941 4343 Fax: 253 941 4175 3 1. Background Information and Scope of Work On April 29th 2020 Asbestos Northwest, LLC conducted a survey of the former office building located at 1171 Kirkland Ave NE in Renton WA. AHERA-certified building inspector Sean Butler (#173733) conducted the survey to determine the presence of Asbestos Containing Materials (ACM’s) prior to the demolition of the building for redevelopment of the parcel. The building was unoccupied at the time of the inspection and was in good condition. It had originally been constructed as a post office and was later reconfigured as a home remodel showroom. A significant portion of the building had been converted into model kitchen or bathroom spaces. The building was later in use as a general office. A reception area was still present at the front of the building and a loading dock was located at the rear. There were no outbuildings. Utilities were disconnected at the time of the inspection. Throughout these various changes the original finishing materials were left largely intact, with new walls added in and new flooring placed over original. No clear division between new and old materials was possible, for the purposes of this survey the building was considered to be a single homogenous area. Potential asbestos-containing materials were located and sampled from the interior and exterior of the building. See Appendix B for a detailed floor plan with sample locations. Materials were located and sampled following AHERA protocol in 40 CFR 763.86, then analyzed in-house at Asbestos Northwest per 40 CFR 763.86. See section 3 for detailed sampling information. ASBESTOS NORTHWEST LLC SURVEY REPORT 30620 Pacific Hwy S Suite 103 Federal Way, WA 98003 Tel: 253 941 4343 Fax: 253 941 4175 4 2. Building Description County records indicate the building was originally constructed in 1960 and had a finished area of roughly 5,400ft2 over a single floor. The building was unoccupied at the time of the inspection and was in good condition. It had been originally constructed as a post office but had been converted into a home remodel showroom in recent years. It will be demolished to make way for redevelopment of the parcel. Structural System The home had a concrete foundation with a wood and masonry construction. The rear loading ramp area had been enclosed and converted into work space at some point, but the overall structure appeared to be otherwise unaltered. Finishing Materials Interior walls were finished drywall throughout the majority of the space, with some brick veneer in the front of the building and unfinished CMU at the rear. Floors were originally an unusual vinyl tile throughout the space, which did contain asbestos. These tiles were covered with carpet and ceramic tile in other areas. Ceilings were fibrous tiles. The exterior was clad in wood paneling with some asbestos containing cement boards outside the main entrance. Windows were original units with suspect glazing materials. Mechanical system The furnaces were located at the rear of the building with under floor metal ducting. Additional air handling equipment was located on the roof. No asbestos containing wrap or tape materials were encountered. Electrical system The electrical system was live at the time of the inspection, visible wiring was of knob and tube type. The electrical panel was located at the rear of the building. Insulation No vermiculite or other suspect insulation materials were encountered. Fiberglass bats were seen. Roofing The building had a flat roof of rolled asphaltic sheets with silver paint. Outbuildings There were no outbuildings located on the property. ASBESTOS NORTHWEST LLC SURVEY REPORT 30620 Pacific Hwy S Suite 103 Federal Way, WA 98003 Tel: 253 941 4343 Fax: 253 941 4175 5 3. Material Sampling Information Asbestos survey work performed by Asbestos Northwest meets inspection regulatory requirements enforced by federal, state, and local agencies, including Asbestos Hazard Emergency Response Act (AHERA), WAC 296-62-077 (WISHA) and 40 CFR Part 61 (NESHAP) and 29 CFR Part 1926.1101 (OSHA) Definitions Homogenous – Materials with the same appearance, texture, color, and which were applied during the same general construction period. Surfacing Material – Material that has been sprayed-on, troweled-on or otherwise applied to surfaces, such as acoustical plaster, texture and joint compound, and fireproofing materials on structural members. Thermal System Insulation – Material applied to pipes, fittings, boilers, breaching, ducts, and other interior structural components to prevent heat loss or gain. Miscellaneous Material – Building materials such as structural components, structural members or fixtures not included in surfacing and thermal insulation. Survey Methodology Before sampling began, inspectors documented the total surveyed area. A sketch of each space was created, and total square footage was roughly measured. The inspectors then determined the extent of each visible homogenous material throughout the survey area. Materials were classified as surfacing, thermal insulation, or miscellaneous material, and friability was assessed according to AHERA specifications. Materials were sampled according to 40 CFR 763.86. Depending on homogeneity, square footage, and material type, the proper number of samples needed to accurately assess the location and extent of asbestos was determined and collected. At the point of collection, samples were placed in an appropriate container and labeled. Location was noted on the building floor plan, and a description of the material was recorded with the label number. Sampling tools were then wiped clean to prevent contamination between samples. Any suspect debris was sealed. The samples were then counted, and their label numbers were recorded on a chain of custody form. The inspector then signed and released the form to the laboratory with the samples. Samples were analyzed in-house at Asbestos Northwest. Below is a list of all materials sampled. Appendix C contains the laboratory report and analytical results for each sample. ASBESTOS NORTHWEST LLC SURVEY REPORT 30620 Pacific Hwy S Suite 103 Federal Way, WA 98003 Tel: 253 941 4343 Fax: 253 941 4175 6 Description Material Type Sample Numbers and Locations Texture Friable Surfacing Material 5-1 – Lobby Wall 5-3 – Side Office Wall 5-10 – Back Side Office Wall 5-11 – Loading Ramp Wall 5-13 – Bamboo Finish Bathroom Wall 5-15 – Show Room Back Corner Wall 5-18 – Front Side Office Wall Joint Compound Friable Surfacing Material 5-4 – Side Office Wall 5-5 – Center Store Room Wall 5-12 – Bamboo Finish Bathroom Wall 5-14 – Show Room Back Corner Wall 5-17 – Front Side Office Wall Joint Compound Asbestos Containing Friable Surfacing Material 5-2 – Front Counter Wall 5-7 – Original Bathroom Wall Dark Brown Floor Tile with Black Mastic Asbestos Containing Vinyl Tile Non-Friable Miscellaneous Material 5-6 – Back Side Hallway Floor Ceramic Tile and Mortar Non-Friable Miscellaneous Material 5-8 – Original Bathroom Floor Mastic on Ceramic Tile Non-Friable Miscellaneous Material 5-9 – Original Bathroom Wall Ceramic Tile, Carpet, Vinyl Tile Asbestos Containing Vinyl Tile Non-Friable Miscellaneous Material 5-16 – Show Room Floor Cove Base Mastic Non-Friable Miscellaneous Material 5-19 – Lobby Wall Brown Fibrous Ceiling Tile Friable Miscellaneous Material 5-20 – Main Area Ceiling Green Cement Board with Black Mastic Asbestos Containing Board Non-Friable Miscellaneous Material 5-21 – Front Entrance Exterior Wall Tar Paper Non-Friable Miscellaneous Material 5-22 – Under Siding Brittle Window Glazing Non-Friable Miscellaneous Material 5-23 – Side Windows Rolled Asphaltic Roofing and Silver Paint Non-Friable Miscellaneous Material 5-24 – Roof Front 5-24 – Roof Middle ASBESTOS NORTHWEST LLC SURVEY REPORT 30620 Pacific Hwy S Suite 103 Federal Way, WA 98003 Tel: 253 941 4343 Fax: 253 941 4175 7 4. Asbestos Containing Material A homogenous material is considered ACM (Asbestos Containing Material) if one or more samples of the material are found to have greater than 1% asbestos. Analysis can result in both positive and negative conclusions in materials containing less than 10% asbestos, or materials that have very fine asbestos fibers, have been hand mixed, or have asbestos fibers tightly bound in the matrix; therefore, EPA recommends a minimum of three samples be analyzed by PLM for these types of materials. All materials that were sampled during the inspection were analyzed under PLM, EPA Method 600/R-93/116. Laboratory results show that five of the samples taken contained asbestos. Description and Asbestos Type Material Type and Estimated Quantity Locations Joint Compound Composited to <1% Chrysotile Asbestos Friable Surfacing Material See Conclusions 5-2 – Front Counter Wall 5-7 – Original Bathroom Wall Vinyl Tile 20% Chrysotile Asbestos Non-Friable Miscellaneous Material ~4,200ft2 5-6 – Back Side Hallway Floor 5-16 – Show Room Floor Cement Board Panels 15% Chrysotile Asbestos Non-Friable Miscellaneous Material ~80ft2 5-21 – Front Entrance Exterior Wall ASBESTOS NORTHWEST LLC SURVEY REPORT 30620 Pacific Hwy S Suite 103 Federal Way, WA 98003 Tel: 253 941 4343 Fax: 253 941 4175 8 5. Conclusions Two of the seven samples of joint compound sampled during the inspection were found to contain asbestos. The remaining joint compound samples and all samples of texture or skim coating were asbestos free. The full extent of this asbestos containing material is unknown. These samples were composited with the underlying wallboard at client request and found to contain less than one percent asbestos by this method. An unusual style of vinyl tile was in place below the carpet throughout the majority of the building. These tiles were roughly 1ft x 2ft in size and roughly 1in thick. The tiles contained asbestos, although the associated mastic was asbestos free. The tiles in the show room area were covered by carpet, which was covered by ceramic tile. Cement board panels on the exterior walls of the main entrance contained asbestos. These were not found elsewhere on the building, and the associated adhesive was asbestos free. All other materials sampled within the home were found to be asbestos free. Any identified asbestos containing material must be abated before demolition can continue. A Certified Asbestos Abatement Contractor must carry out abatement. Different materials require different abatement processes depending on the friability, type of asbestos, and amount of asbestos present. It is important that materials are treated by a Certified Asbestos Abatement Contractor. ASBESTOS NORTHWEST LLC SURVEY REPORT 30620 Pacific Hwy S Suite 103 Federal Way, WA 98003 Tel: 253 941 4343 Fax: 253 941 4175 9 Appendix A – Certifications ASBESTOS NORTHWEST LLC SURVEY REPORT 30620 Pacific Hwy S Suite 103 Federal Way, WA 98003 Tel: 253 941 4343 Fax: 253 941 4175 10 ASBESTOS NORTHWEST LLC SURVEY REPORT 30620 Pacific Hwy S Suite 103 Federal Way, WA 98003 Tel: 253 941 4343 Fax: 253 941 4175 11 Appendix B – Building Layout ASBESTOS NORTHWEST LLC SURVEY REPORT 30620 Pacific Hwy S Suite 103 Federal Way, WA 98003 Tel: 253 941 4343 Fax: 253 941 4175 12 Front Lobby Main Room West Side ASBESTOS NORTHWEST LLC SURVEY REPORT 30620 Pacific Hwy S Suite 103 Federal Way, WA 98003 Tel: 253 941 4343 Fax: 253 941 4175 13 Asbestos Containing Floor Tiles Main Room East Side ASBESTOS NORTHWEST LLC SURVEY REPORT 30620 Pacific Hwy S Suite 103 Federal Way, WA 98003 Tel: 253 941 4343 Fax: 253 941 4175 14 Appendix C – Laboratory Report ASBESTOS NORTHWEST LLC SURVEY REPORT 30620 Pacific Hwy S Suite 103 Federal Way, WA 98003 Tel: 253 941 4343 Fax: 253 941 4175 15 ASBESTOS NORTHWEST LLC SURVEY REPORT 30620 Pacific Hwy S Suite 103 Federal Way, WA 98003 Tel: 253 941 4343 Fax: 253 941 4175 16 ASBESTOS NORTHWEST LLC SURVEY REPORT 30620 Pacific Hwy S Suite 103 Federal Way, WA 98003 Tel: 253 941 4343 Fax: 253 941 4175 17 ASBESTOS NORTHWEST LLC SURVEY REPORT 30620 Pacific Hwy S Suite 103 Federal Way, WA 98003 Tel: 253 941 4343 Fax: 253 941 4175 18 ASBESTOS NORTHWEST LLC SURVEY REPORT 30620 Pacific Hwy S Suite 103 Federal Way, WA 98003 Tel: 253 941 4343 Fax: 253 941 4175 19