HomeMy WebLinkAboutP_Structural Vault Plans_200305ΩPROJECT SPECIAL INSPECTIONSMATERIAL/ACTIVITYSERVICEAPPLICABLE TO THIS PROJECTY/NEXTENT1704.2.5 INSPECTION OF FABRICATORS1705.3 CONCRETE CONSTRUCTION1705.6 SOILS1705.12.1 CONCRETE REINFORCEMENT TESTING AND QUALIFICATION FOR SEISMIC RESISTANCE1705 POST-INSTALLED ANCHORSHGUOBHSOLA
NI
J
.
BR
NOTGHISNAFWOE
T
ATS
REGISTEREDPROFESSIONALENGI
N
EER5 3 2 1 4REVIEWEDBy: Alan Findlay, P.E. Date: 03/05/2020 RECEIVED03/17/2020 striplettBUILDING DIVISIONB18004340_V4
HGUOBHSOLA
NI
J
.
BR
NOTGHISNAFWOE
T
ATS
REGISTEREDPROFESSIONALENGI
N
EER5 3 2 1 4REVIEWEDBy: Alan Findlay, P.E. Date: 03/05/2020 RECEIVED03/17/2020 striplettBUILDING DIVISIONB18004340_V4
1S/4001S/4002S/4001S/4001S/400HGUOBHSOLA
NI
J.
BR
NOTGHISNAFWOETATS
REGISTEREDPROFESSIONALENGI
N
EER5 3 2 1 4REVIEWEDBy: Alan Findlay, P.E. Date: 03/05/2020 RECEIVED03/17/2020 striplettBUILDING DIVISIONB18004340_V4
2S/3004S/3001S/3001S/3003S/30011S/30011S/30010S/3004S4003S4003S/4005S/3005S/3006S/3004S400HGUOBHSOLA
NI
J.
BR
NOTGHISNAFWOE
T
ATS
REGISTEREDPROFESSIONALEN
GI
N
EER5 3 2 1 4REVIEWEDBy: Alan Findlay, P.E. Date: 03/05/2020 RECEIVED03/17/2020 striplettBUILDING DIVISIONB18004340_V4
HGUOBHSOLA
NI
J.
BR
NOTGHISNAFWOE
T
ATS
REGISTEREDPROFESSIONALEN
GI
N
EER5 3 2 1 4REVIEWEDBy: Alan Findlay, P.E. Date: 03/05/2020 RECEIVED03/17/2020 striplettBUILDING DIVISIONB18004340_V4
4S/400HGUOBHSOLA
NI
J
.
BR
NOTGHISNAFWOE
T
ATS
REGISTEREDPROFESSIONALEN
GI
N
EER5 3 2 1 4REVIEWEDBy: Alan Findlay, P.E. Date: 03/05/2020 RECEIVED03/17/2020 striplettBUILDING DIVISIONB18004340_V4