HomeMy WebLinkAboutC_Grant Ave Vault Repair_20200514_v5
May 14, 2020 File No. 262020.037/00101
Mr. Craig Burnell, Building Official
Development Services Division Department of Community and Economic Development City of Renton 1055 South Grady Way
Renton, WA 98055
Subject: Grant Avenue Vault Repairs – Final Submittal
Dear Mr. Burnell:
We reviewed the proposed repairs for compliance with the structural provisions of the 2015 International Building Code (IBC), as amended and adopted by the state of Washington and the City of Renton. Please note that we understand that the City has previously reviewed and
accepted the applicant’s durability modeling. For that reason, durability modeling
information was not included in the applicant’s responses and was not reviewed. With this note, the permit applicant has responded successfully to our comments. Drawing Revisions
New structural drawing sets were submitted in response to our plan review. These sets should
replace any previous sets submitted with the original permit submittal. The new drawing sets
are dated May 8, 2020. Special Inspections, Submittals, Tests, and Structural Observation
Special inspections and tests should be performed by qualified special inspectors. Reports,
certificates, and other documents related to structural special inspections and tests should be submitted to the City of Renton. Structural Special Inspections: Special inspections by qualified special inspectors should be
provided. Please reference the special inspections indicated on Sheet S100 and as
recommended on Sheet S101. Structural Tests: Tests by qualified special inspectors should be conducted. See the material sections on Sheets S100 and as recommended on Sheet S101.
Structural submittals: Reports, certificates, and other documents related to structural special inspections and tests should be submitted to the City of Renton. See the material sections on Sheets S100 and S101 of the structural general notes for specific requirements.
B18004340_V5
Mr. Craig Burnell, Building Official
City of Renton, Development Services Division, Department of Community and Economic Development May 14, 2020 File No. 262020.037/00101 Page 2
Structural Observation: Structural observation during construction is required for this project
per IBC Section 1704.6.
Corrections and comments made during the review process do not relieve the permit applicant or the designers from compliance with code requirements, conditions of approval, and permit requirements; nor are the designers relieved of responsibility for a complete design in
accordance with the laws of the state of Washington. This review is for general compliance
with the International Building Code as it relates to the project. If you have any questions or need additional clarification, please contact us.
Sincerely,
Reid Middleton, Inc.
Paul Crocker, P.E., S.E. Director, Structural Engineering cc: Craig Burnell, City of Renton (by e-mail)
Al Findlay, City of Renton (by e-mail)
Ehw\O:\20\037 Renton, Grand Avenue Vault Repair Review\Reports\Grant Ave Vault Repair_R02.docx\pnc