HomeMy WebLinkAboutC_Grant Ave Vault Repair_20200514_v5 May 14, 2020 File No. 262020.037/00101 Mr. Craig Burnell, Building Official Development Services Division Department of Community and Economic Development City of Renton 1055 South Grady Way Renton, WA 98055 Subject: Grant Avenue Vault Repairs – Final Submittal Dear Mr. Burnell: We reviewed the proposed repairs for compliance with the structural provisions of the 2015 International Building Code (IBC), as amended and adopted by the state of Washington and the City of Renton. Please note that we understand that the City has previously reviewed and accepted the applicant’s durability modeling. For that reason, durability modeling information was not included in the applicant’s responses and was not reviewed. With this note, the permit applicant has responded successfully to our comments. Drawing Revisions New structural drawing sets were submitted in response to our plan review. These sets should replace any previous sets submitted with the original permit submittal. The new drawing sets are dated May 8, 2020. Special Inspections, Submittals, Tests, and Structural Observation Special inspections and tests should be performed by qualified special inspectors. Reports, certificates, and other documents related to structural special inspections and tests should be submitted to the City of Renton. Structural Special Inspections: Special inspections by qualified special inspectors should be provided. Please reference the special inspections indicated on Sheet S100 and as recommended on Sheet S101. Structural Tests: Tests by qualified special inspectors should be conducted. See the material sections on Sheets S100 and as recommended on Sheet S101. Structural submittals: Reports, certificates, and other documents related to structural special inspections and tests should be submitted to the City of Renton. See the material sections on Sheets S100 and S101 of the structural general notes for specific requirements. B18004340_V5 Mr. Craig Burnell, Building Official City of Renton, Development Services Division, Department of Community and Economic Development May 14, 2020 File No. 262020.037/00101 Page 2 Structural Observation: Structural observation during construction is required for this project per IBC Section 1704.6. Corrections and comments made during the review process do not relieve the permit applicant or the designers from compliance with code requirements, conditions of approval, and permit requirements; nor are the designers relieved of responsibility for a complete design in accordance with the laws of the state of Washington. This review is for general compliance with the International Building Code as it relates to the project. If you have any questions or need additional clarification, please contact us. Sincerely, Reid Middleton, Inc. Paul Crocker, P.E., S.E. Director, Structural Engineering cc: Craig Burnell, City of Renton (by e-mail) Al Findlay, City of Renton (by e-mail) Ehw\O:\20\037 Renton, Grand Avenue Vault Repair Review\Reports\Grant Ave Vault Repair_R02.docx\pnc