Loading...
HomeMy WebLinkAboutP_Struct Plans_Grant Ave_Vault_200508_v6ΩPROJECT SPECIAL INSPECTIONSMATERIAL/ACTIVITYSERVICEAPPLICABLE TO THIS PROJECTY/NEXTENT1704.2.5 INSPECTION OF FABRICATORS1705.3 CONCRETE CONSTRUCTION1705.6 SOILS1705.12.1 CONCRETE REINFORCEMENT TESTING AND QUALIFICATION FOR SEISMIC RESISTANCE1705 POST-INSTALLED ANCHORSHGUOBHSOLA NI J . BR NOTGHISNAFWOE T ATS REGISTEREDPROFESSIONALENGI N EER5 3 2 1 4RECEIVED 05/08/2020 striplett BUILDING DIVISION B19004340_v5APPROVEDBUILDING DIVISIONBy: striplett Date: 05/14/2020 THIS SET OF APPROVED PLANS MUST BE ON THE JOB AT ALLTIMES DURING CONSTRUCTION. THIS BUILDING IS NOT TO BEOCCUPIED UNTIL AFTER FINAL INSPECTION BY THE RENTONBUILDING DIVISION AND RECEIPT OF CERTIFICATE OFOCCUPANCY.APPROVAL SHALL NOT BE CONSTRUED AS THE AUTHORITY TOVIOLATE OR CANCEL ANY PROVISIONS OF CODES, ORDINANCES,OR OTHER REGULATIONS ENFORCED BY THIS CITY. HGUOBHSOLA NI J . BR NOTGHISNAFWOE T ATS REGISTEREDPROFESSIONALENGI N EER5 3 2 1 4RECEIVED 05/08/2020 striplett BUILDING DIVISION B19004340_v5 1S/4001S/4002S/4001S/4001S/400HGUOBHSOLA NI J. BR NOTGHISNAFWOETATS REGISTEREDPROFESSIONALENGI N EER5 3 2 1 4RECEIVED 05/08/2020 striplett BUILDING DIVISION B19004340_v5 2S/3004S/3001S/3001S/3003S/30011S/30011S/30010S/3004S4003S4006S/3007S/3007S/3006S/3005S4002S/3005S/3007S/400HGUOBHSOLA NI J. BR NOTGHISNAFWOE T ATS REGISTEREDPROFESSIONALEN GI N EER5 3 2 1 4RECEIVED 05/08/2020 striplett BUILDING DIVISION B19004340_v5 HGUOBHSOLA NI J. BR NOTGHISNAFWOE T ATS REGISTEREDPROFESSIONALEN GI N EER5 3 2 1 4EMBED 12"EMBED 12" EMBED 12" EMBED 12"55@ 8" O.C.@ 8" O.C.@ 8" O.C.@ 8" O.C.RECEIVED06/08/2020 striplettBUILDING DIVISIONB18004340_V6NOTEWHERE TOP OF EXISTINGVERTICAL REINFORCING IS BELOWCOLD JOINT, USE SCANNING TOLOCATE TOP OF EXISTINGVERTICAL REINFORCING ANDEMBED NEW REINFORCING 12"PAST TOP OF EXISTING.NOTEWHERE TOP OF EXISTINGVERTICAL REINFORCING IS BELOWCOLD JOINT, USE SCANNING TOLOCATE TOP OF EXISTINGVERTICAL REINFORCING ANDEMBED NEW REINFORCING 12"PAST TOP OF EXISTING.NOTEWHERE TOP OF EXISTINGVERTICAL REINFORCING IS BELOWCOLD JOINT, USE SCANNING TOLOCATE TOP OF EXISTINGVERTICAL REINFORCING ANDEMBED NEW REINFORCING 12"PAST TOP OF EXISTING.NOTEWHERE TOP OF EXISTINGVERTICAL REINFORCING IS BELOWCOLD JOINT, USE SCANNING TOLOCATE TOP OF EXISTINGVERTICAL REINFORCING ANDEMBED NEW REINFORCING 12"PAST TOP OF EXISTING.REVIEWEDBy: Alan Findlay, P.E. Date: 06/10/2020 4S/4006S/400HGUOBHSOLA NI J . BR NOTGHISNAFWOE T ATS REGISTEREDPROFESSIONALEN GI N EER5 3 2 1 4RECEIVED 05/08/2020 striplett BUILDING DIVISION B19004340_v5