Loading...
HomeMy WebLinkAboutP_Revised Structural_Grant Ave Vault_190813_V2ΩPROJECT SPECIAL INSPECTIONSMATERIAL/ACTIVITYSERVICEAPPLICABLE TO THIS PROJECTY/NEXTENT1704.2.5 INSPECTION OF FABRICATORS1705.3 CONCRETE CONSTRUCTION1705.6 SOILS1705.12.1 CONCRETE REINFORCEMENT TESTING AND QUALIFICATION FOR SEISMIC RESISTANCE1705 POST-INSTALLED ANCHORSHGUOBHSOLA NI J . BR NOTGHISNAFWOE T ATS REGISTEREDPROFESSIONALENGI N EER5 3 2 1 4REVISION Received: 08/13/2019 / striplett BUILDING DIVISION B18004340_V2REVIEWEDBy: Alan Findlay, P.E. Date: 08/14/2019 1S/4001S/4002S/4001S/4001S/400HGUOBHSOLA NI J. BR NOTGHISNAFWOETATS REGISTEREDPROFESSIONALENGI N EER5 3 2 1 4BACKFILL NOTEDO NOT BACKFILL WALLS UNTIL VAULT IS FULLY CONSTRUCTED INCLUDING VAULT LID.REVISION Received: 08/13/2019 / striplett BUILDING DIVISION REVISION Received: 08/13/2019 / striplett BUILDING DIVISION B18004340_V2REVIEWEDBy: Alan Findlay, P.E. Date: 08/14/2019 2S/3004S/3001S/3001S/3003S/30011S/30011S/30010S/3004S4003S4003S/4005S/3005S/300HGUOBHSOLA NI J. BR NOTGHISNAFWOE T ATS REGISTEREDPROFESSIONALEN GI N EER5 3 2 1 4REVISION Received: 08/13/2019 / striplett BUILDING DIVISION REVISION Received: 08/13/2019 / striplett BUILDING DIVISION B18004340_V2REVIEWEDBy: Alan Findlay, P.E. Date: 08/14/2019 HGUOBHSOLA NI J. BR NOTGHISNAFWOE T ATS REGISTEREDPROFESSIONALEN GI N EER5 3 2 1 4REVISION Received: 08/13/2019 / striplett BUILDING DIVISION REVISION Received: 08/13/2019 / striplett BUILDING DIVISION B18004340_V2REVIEWEDBy: Alan Findlay, P.E. Date: 08/14/2019 HGUOBHSOLANI J . BR NOTGHISNAFWOETATS REGISTEREDPROFESSIONALENGI N EER5 3 2 1 4REVISION Received: 08/13/2019 / striplett BUILDING DIVISION REVISION Received: 08/13/2019 / striplett BUILDING DIVISION B18004340_V2REVIEWEDBy: Alan Findlay, P.E. Date: 08/14/2019