Loading...
HomeMy WebLinkAboutP_Truss_Layout_180720_v32X6 RAFTER 6/12GARAGE HUS26(9) HUS26(14) Furnace Platform 8/128/12 6/12Qty 26 Product Blocking List 2x4 Vent Block = Truss left end indicator. QUANTITYHANGERCARRIED MEMBER HANGER SCHEDULE CARRYING MEMBER USE 10DX1 1/2" NAILS @ SINGLE PLY CARRYING MEMBER OR CLINCH 3" NAILS ON BACKSIDE OF GIRDER HUS26 2314-16D6-16D 6/12J01J02(3) J03(6)3-00-00D01 D02 C01 C02 B01 B03 A01A05B02(3)A02(5)A03(4)A04(5)6-06-0046-06-0053-00-004-00-0049-00-0053-00-0010-09-0013-01-006-02-00 30-00-00 30-00-00 5-06-004-11-006-00-006-06-002-00-004-03-00 11-05-007-00-0039-06-00THIS IS A TRUSS PLACEMENT DIAGRAM ONLY. These trusses are designed as individual building components to be incorporated into the building design at the specification of the building designer. See the individual design sheets for each truss design identified on the placement drawing. The building designer is responsible for temporary and permanent bracing of the roof and floor system and for the overall structure. The design of the truss support structure including headers, beams, walls, and columns is the responsibility of the building designer. For general guidance regarding bracing, consult "Bracing of wood trusses" available from the Truss Plate Institute, 583 D'Onifrio Drive; Madison, WI 53179 BUILDER : PROJECT : DATE : DRAWN BY : SCALE: 20815 67th Ave NE Arlington, WA 98223 Phone: 1-360-925-4155 JOB #:RT - 1 ADDRESS : JK Monarch Chelan Creek Lot 2 , Renton, WA GTG 07/18/18 10:52:12 B1800692 D08-053 B18000839 V3 REVISION Received: 07/20/2018 / aalexander BUILDING DIVISION APPROVEDBUILDING DIVISION THIS SET OF APPROVED PLANS MUST BE ON THE JOB AT ALLTIMES DURING CONSTRUCTION. THIS BUILDING IS NOT TO BEOCCUPIED UNTIL AFTER FINAL INSPECTION BY THE RENTONBUILDING DIVISION AND RECEIPT OF CERTIFICATE OFOCCUPANCY. APPROVAL SHALL NOT BE CONSTRUED AS THE AUTHORITY TOVIOLATE OR CANCEL ANY PROVISIONS OF CODES, ORDINANCES,OR OTHER REGULATIONS ENFORCED BY THIS CITY. DATE: 08/07/2018