Loading...
HomeMy WebLinkAboutP_Truss_Layout_180606_v2LAYOUT 24" O.C. LAYOUT 24" O.C.LAYOUT 24" O.C. LAYOUT 24" O.C. LAYOUT 24" O.C.ATTIC ROOM GARAGE FURNACE PLATFORM B03 HRJ1J04J05S03 S04 S05 HRJ2J07S03 S04 D01 D02 B01A01 A05A07F01A06 G01 G02 D03HRBLUS26HUS26HGUS26-2HUS26HUS26HUS26HUS26HUS26HUS26HUS26HUS26HUS26LUS26LUS26 LUS26 LUS26 LUS26 LUS26 LUS24LUS24TJC37TBE6 (2)TBE6 (2)J06(6)A04(5)A02(2)A03(5)G03(5) B02(3) J01(5) J08(9) LUS24 LUS24 LUS24 39-06-0013-00-0010-00-003-00-004-06-0030-00-00 11-00-00 19-00-00 14-00-00 24-06-00 10-06-00 5-06-00 4-00-00 12-03-0015-00-0052-00-002-00-00 6-00 8-00-002-00-00 5-00-006-06-003-00-0015-08-08 Truss Connector Total List Manuf Product Qty Simpson HGUS26-2 1 Simpson HUS26 10 Simpson LUS24 23 Simpson LUS26 7 Simpson TJC37 1 Simpson TBE6* 4 HANGER HANGER NAILING SCHEDULE USE 10DX1 1/2" NAILS @ SINGLE PLY CARRYING MEMBER OR CLINCH 3" NAILS ON BACKSIDE OF GIRDER 6-10D20-10DHGUS26-2 4-10D 4-10DLUS26 CARRIED MEMBER CARRYING MEMBER 6-10D14-10DHUS26 Blocking List 2x4 Vent Block 70 Product Qty TBE6 10-10D 10-10D TJC37 6-8DX1.5"6-8DX1.5" 4-10D 2-10DLUS24 = Truss left end indicator. THIS IS A TRUSS PLACEMENT DIAGRAM ONLY. These trusses are designed as individual building components to be incorporated into the building design at the specification of the building designer. See the individual design sheets for each truss design identified on the placement drawing. The building designer is responsible for temporary and permanent bracing of the roof and floor system and for the overall structure. The design of the truss support structure including headers, beams, walls, and columns is the responsibility of the building designer. For general guidance regarding bracing, consult "Bracing of wood trusses" available from the Truss Plate Institute, 583 D'Onifrio Drive; Madison, WI 53179 BUILDER : PROJECT : MODEL : DRAWN BY : SCALE: 20815 67th Ave NE Arlington, WA 98223 Phone: 1-360-925-4155 JOB #:RT - 1 ADDRESS : JK Monarch LL L2-2853-2L B1803160 D08-053 B18000840 V2 APPROVEDBUILDING DIVISION THIS SET OF APPROVED PLANS MUST BE ON THE JOB AT ALLTIMES DURING CONSTRUCTION. THIS BUILDING IS NOT TO BEOCCUPIED UNTIL AFTER FINAL INSPECTION BY THE RENTONBUILDING DIVISION AND RECEIPT OF CERTIFICATE OFOCCUPANCY. APPROVAL SHALL NOT BE CONSTRUED AS THE AUTHORITY TOVIOLATE OR CANCEL ANY PROVISIONS OF CODES, ORDINANCES,OR OTHER REGULATIONS ENFORCED BY THIS CITY. DATE: 06/27/2018