Loading...
HomeMy WebLinkAboutRS_City_of_Renton_Structural_Review_1_Letter_181126_v2November 4, 2018 Mr. Russ Sorkness JK Monarch 424 29th St NE, Suite C Puyallup, WA 98372 RE: Building Permit Structural Plan Review – First Submittal 862 Chelan Ave NE (B18005659) Dear Mr. Sorkness: We reviewed the proposed project for compliance with the structural provisions of the 2015 International Residential Code (IRC) and 2015 International Building Code (IBC) as amended and adopted by the state of Washington and the City of Renton. The design team should address the comments below. Responses to these review comments should be made in an itemized letter form and any changes to the drawings should be clouded. We recommend that the permit applicant have the structural engineer respond and resubmit for additional review. All information should be submitted directly to the City of Renton. Geotechnical 1. Geotechnical special inspections. Special inspections and tests should be provided by a qualified geotechnical engineer as recommended in the geotechnical report by Associated Earth Sciences dated June 20, 2013. See IRC Section R401.4. The following is a summary: a. Site excavation and grading. b. Overexcavation for placement of structural fill. c. Construction dewatering, see Page 4 of geotechnical report. d. Placement of structural fill and soil compaction. e. Verification of soil-bearing capacity. REVISION Received: 11/26/2018 / aalexander BUILDING DIVISION Mr. Sorkness Page 2 of 3 November 4, 2018 No response from the applicant is required for this comment. This comment is for the building official and for reference Structural General 1. Structural special inspections. Structural special inspections. Special inspections by qualified special inspectors do not appear warranted for this project. If it is determined otherwise, the applicable special inspections are noted below. See IBC Sections 1704.1 and 1704.2. a. Installation of concrete expansion, adhesive, and screw anchors, where applicable: in accordance with qualifying report of evaluation service (e.g., ICC-ES). See also IRC Section 301.1.3 as well as IBC Section 1705.1.1. No response from the applicant is required for this comment. This comment is for the building official and for reference. 2. The drawings, such as Sheet S-0, should be revised to indicate the manufacturer’s installation instructions shall be available on the job site at the time of inspection, for the inspector’s use and reference. We strongly suspect this requirement is indicated the drawings, we just cannot find it. The revised drawings shall be resubmitted for reviews. See IRC Sections 106.1.1 and 106.1.2. Lateral 3. The rear exterior shear walls on the Upper Level of the proposed structure appear (as shown on the plans and calculations) to cause this framing scheme to be irregular by IRC Section R301.2.2.2.5 Items 1 through 5, especially Items 1 and 3. Per IRC Section R301.2.2.2.5, these shear walls and supporting elements shall be designed per acceptable engineering practice, i.e. the IBC and associated ASCE 7-10. These shear walls appear to cause a Type 4 horizontal, and so the supporting members shall be designed for increase forces, including increase in: chord forces, diaphragm connection forces to chords and collectors, etc…; as indicted by ASCE 7-10 Tables 12.3-1 and 12.3-2 as well as Sections 12.3.3.3 and 12.3.3.4. Below is an image of the current framing with redlines as the upper floor, the green lines as the main floor, and the yellow lines as our comment. The submitted calculations do not appear to Mr. Sorkness Page 3 of 3 November 4, 2018 address these irregularities. Please submit substantiating data, such as additional calculations, that indicate the proposed structure has the design capacity to resist the required IBC loadings. Please note, there is currently no collector in the Upper Floor framing to drag W2 shear loads to the Main Floor shear walls. The drawings may need to be revised to also show a complete load path from these shear walls to the foundation as per IRC Sections 301.1 and 301.1.3. Also see IBC Sections 1604.2, 1604.4, 1605.2, 1605.3, and 1613.1. Corrections and comments made during the review process do not relieve the permit applicant or the designers from compliance with code requirements, conditions of approval, and permit requirements; nor are the designers relieved of responsibility for a complete design in accordance with the laws of the state of Washington. This review is for general compliance with the International Residential Code and International Building Code as they relate to the project. See IRC Section 105.4. If you have any questions or need additional clarification, please contact us. Sincerely, Alan D. Findlay, P.E. Building Plan Reviewer, City of Renton cc: File