Loading...
HomeMy WebLinkAboutP_ ROOF_LAY_OUT__190710_v38:12 8:12 FAU **SEE NOTE "5" LADDER FRAMING THIS AREA TO BE BY OTHERS BEARING WALLCANT.'ED GIRDER LOADING: 25 TC LL 10 TC DL 10 BC DL ----------------- 45 TL PSF 2015 IRC CODE WIND EXPOSURE: B WIND VELOCITY = 110 mph KzT = 1.00 6:12 6:12 6:12 6:12 8:12 8:12 8:12 8:12 QTY TYPE SYMBOL 11 HUS26 1 HGUS26-2 NOTE: ALL HANGER NAILS MUST BE 16d SINKER (3-1/4" LONG)....TYP. UNLESS NOTED OTHERWISE 1 2 CAUTION: DO NOT CUT, DRILL OR ALTER ANY TRUSSES WITHOUT PRIOR APPROVAL FROM ROOF TRUSS SUPPLY, INC. DF TOP PLATES REQUIRED, AND MUST BE INSTALLED UNDER EACH END OF GIRDER "B2" TO ACHIEVE PROPER BEARING. ROOF NOTES: 1.) ALL TRUSSES TO BE SPACED AT 24" O.C. (UNLESS NOTED OTHERWISE) 2.) PROVIDE FULL BEARING UNDER GIRDER TRUSSES. 3.) SEE ATTACHED FRAMING DETAILS FOR HIP, VALLEY, GABLE, AND OVERFRAMING. 4.) ALL BEAMS ARE DESIGNED BY OTHERS, UNLESS NOTED OTHERWISE - (SEE STRUCTURAL FRAMING PLANS.) 5.)DF TOP PLATES REQUIRED, AND MUST BE INSTALLED UNDER EACH END OF GIRDER "B2" TO ACHIEVE PROPER BEARING. 1 1 1 2 = AREA FIELD FRAMED BY OTHERS D1D2(2)A1 A2 B1 B2 A3 C1C4X1C6 C2(3)C2(4)C2A(3)C3(2)C5(2)40-00-001-00-0039-00-0040-00-0012-00-00 4-10-00 13-02-00 30-00-00 30-00-00 8-0010-08-00 8-005-04-007-02-005-06-00 4-00-0011-09-0011-09-0014-00-0013-03-0021-01-002301 CC-3 JK Monarch Job #:B-19-00210-A Above plan provided for truss placement only. Refer to truss calculations and engineering structural drawings for all futher information. Building designer/ engineer of record are responsible for all non truss to truss connections. Building designer/engineer of record to review and approve all designs prior to construction. Customer: Project: Plan: Delivery: Issue Date: 2/28/2019 12:00:00 AM Revision-2 / / Revision-3 / / Anna Roats Drawn By: STANDARD G-RIGHT