Loading...
HomeMy WebLinkAboutP_Truss Layout_171012_V2Mechanical area RELOCATE SCUTTLE HERE SUPER ANCHOR SUPER ANCHOR (2) HUS26 (2) LUS24 Garage 2x4 Vent Block Blocking List 120 12 Product 2x8 Solid Block Qty QUANTITY HANGER CARRIED MEMBER HANGER SCHEDULE CARRYING MEMBER USE 10DX1 1/2" NAILS @ SINGLE PLY CARRYING MEMBER OR CLINCH 3" NAILS ON BACKSIDE OF GIRDER HUS262 14-16D 6-16D 2 2-10DLUS244-10D = Truss left end indicator. SUPER ANCHOR2 4/124/124/124/124/12 4/12 4/12HRCHRCJ10 J11 J12 J10 J11 J12 S04S05S06S04S05S06HRDHRDJ14J15J14J15S01 S02 S01 S02 E01 J09(6)E0 2 ( 3 ) J16(6)J13(4) 14-04-00 7-00-00 21-00-006-00-0012-00-009-06-00 A01 A02 A03 A04SA A05 HRAHRAJ01J02J03J01J02J03J04J05J06J07J04J05J06J07S01 S02 S03 S01 S02 S03 B01 HRBHRBJ01J02J03J01J02J03J04J04S01 S02 S03 S01A S02A S03A A01B A02B A03 A04SA A05HRA J01J02J03J04J05S01 S02 S03 J0GA06 J05(2)J08(2)37-00-002-00-0035-00-0037-00-0021-06-00 11-06-00 33-00-00 8-00-008-00-008-00-0011-06-00 THIS IS A TRUSS PLACEMENT DIAGRAM ONLY. These trusses are designed as individual building components to be incorporated into the building design at the specification of the building designer. See the individual design sheets for each truss design identified on the placement drawing. The building designer is responsible for temporary and permanent bracing of the roof and floor system and for the overall structure. The design of the truss support structure including headers, beams, walls, and columns is the responsibility of the building designer. For general guidance regarding bracing, consult "Bracing of wood trusses" available from the Truss Plate Institute, 583 D'Onifrio Drive; Madison, WI 53179 BUILDER : PROJECT : SUBDIV : MODEL : LOT : 20815 67th Ave NE Arlington, WA 98223 Phone: 1-360-925-4155 JOB #: ADDRESS : Harbour Homes North Wildwood view ll lot 20 Wildwood view ll B1704742 # 20 2217 B PR13000026 B17005356 V1 REVISION Received: 01/25/2018 / aalexander BUILDING DIVISION APPROVED BUILDING DIVISION THIS SET OF APPROVED PLANS MUST BE ON THE JOB AT ALLTIMES DURING CONSTRUCTION. THIS BUILDING IS NOT TO BEOCCUPIED UNTIL AFTER FINAL INSPECTION BY THE RENTONBUILDING DIVISION AND RECEIPT OF CERTIFICATE OFOCCUPANCY. APPROVAL SHALL NOT BE CONSTRUED AS THE AUTHORITY TOVIOLATE OR CANCEL ANY PROVISIONS OF CODES, ORDINANCES,OR OTHER REGULATIONS ENFORCED BY THIS CITY. DATE: 02/14/2018