HomeMy WebLinkAboutTriton Pre-App Meeting - DRAFT-V16 -2023.02.17NEPTUNE MIXED-USE DISTRICT
CITY OF RENTON PRE-APPLICATION SUBMISSION
Table of Contents:
•Project Narrative:
•Vicinity Map:
•Site Plan:
•Preliminary Tree Retention Plan:
•Floor Plans:
•Conceptual Building Elevations:
•Sewer and Water Availability Information:
•Additional Topics
Project Narrative
Sponsor
Affiliate Sponsor
Who is Guerdon?
•A subsidiary of Innovatus Capital Partners
•20+ year-old industry leader in modular technology
•State-of-the-art modular builder
•ESG innovator
•Reducing construction carbon footprints
•Innovators of:
•Multi-family Modular Buildings
•Modular Hotels & Hospitality facilities
•Assisted Living & Senior Housing Centers
•Student Housing Modular Buildings
•Modular Workforce Housing or Man Camps
&
Our commitment to ESG
Life Sciences Lending: Impact-focused, partner with life sciences companies that are leaders in their field and focused on
innovations that (i) address unmet medical needs, (ii) improve patient outcomes, and (iii) reduce overall healthcare
costs.
Commercial Real Estate in micro markets: Environmental and sustainability-focused, providing tenants with efficient,
healthy, and green-certified buildings through operational performance technology, including energy.
Lower Middle Market Value: Incorporates ESG factors into fundamental, bottom-up investment processes to drive value.
We seek to optimize ESG-favorable variables within production facilities and product offerings through sustainable
sourcing, energy efficiency, health and safety, diversity and inclusion; providing low-income housing, fair wages, and
domestic manufacturing; and alignment through equity incentives & profit participation.
Flagship Fund: In addition to the above strategies, the Fund shall not directly invest in companies whose activity is
related to:
•Sale or production of ammunition and military weapons;
•Projects which result in limiting people’s individual rights and freedom or violation of human rights;
•Development and/or implementation of projects unacceptable in environmental and social terms;
•Ethically or morally controversial projects.
City of Renton Benefits
The proposed Neptune Mixed-Use District will benefit the City of Renton and its residents as follows:
•Increased Multifamily/Affordable Housing Density
•Increased Real Estate Tax Revenues
•Increased Excise Tax Revenues
•Transit-Oriented District (TOD) Compliance
•Work/Live/Play Community
•Activate the Renton Village Corridor
•And much more….
The Property
The property includes the following four parcels on the southwest corner of South Grady Way and Talbot Road, north
and west of I-405:
555 S Renton Village Place (parcel number 7231600542) is a 239,973 square foot (5.51 acre) site abutting I-405,
currently developed with the Triton Tower One office building and surface parking. The building is 7 stories and
136,712 square feet, constructed in 1980.
700 South Renton Village Place (parcel number 1923059001) is 272,021 square feet (6.24 acres) located in the
northwest corner of Talbot Road South and I-405. The parcel is developed with the Triton Tower Two office building
and surface parking. The building is seven stories and 137,665 square feet, constructed in 1986.
700 South Renton Village Place (parcel number 1923059023) is 325,750 square feet (7.48 acres) located in the
southwest corner of South Grady Way and Talbot Road South. The parcel is developed with the Triton Tower Three
office building and surface parking. The building is seven stories and 132,730 square feet, constructed in 1986.
905 Talbot Road South (parcel 7231600595) is 23,381 square feet (.54 acres) located north of the Triton Tower One
site, currently developed with surface parking.
The above four parcels are referred to herein as the “Property.”
The Property
Project Name: Neptune Mixed-Use District
Size: 19.77 acres
Location: 700 South Renton Village Place (4 parcels)
Zoning: The Property is in the Commercial Office (“CO”) zone
and designated Commercial Mixed Use on the Comprehensive
Plan. In addition to the CO zoning designation, the Property is
also located in Urban Design District Overlay D.
Current Use: Commercial Office (“CO”)
Special Features: No adverse features on the site.
Soil & Drainage: The site is currently developed with code-
compliant drainage.
OFF RAMPBOUNDARYBOUNDARY
BOUNDARY
BOUNDARY
BOUNDARYexisting easement
on carpark BOUNDARYBOUND
A
R
Y
BOUNDARY
BOUNDARYexisting easement
on carpark
TRITON
TOWER 1 BOUNDARYS GRADY W
A
Y
S GRA
D
Y
W
A
Y
SHATTUCK AVEKing County Parcel
SOUTH RENTON VILLAGE PLACE TALBOT ROAD STTRITON
TOWER 2
WELLS
FARGO
existing electrical
substation 1985
to present
TESLA
HIGHWAY
4
0
5
EXISTING
RETAIL
TIRE
SHOP
APPLE BEES
MCDONALDS
EXISTING
RETAIL
EXISTING
RETAIL
LOT A
LOT 6
LOT B
TRITON
TOWER 3
LOT 4
B
OU
N
D
A
R
Y
LOT 3
LOT 5
LOT 1
LOT 2
LOT C
ENTRY
ENTRY
ENTRYnew road
landscaped
park
PODIUM 2
PODIUM 1
CARPARK
G
SITE PLAN:
TRITON VILLAGE WALK
SCALE: 1" = 150'
100'
N
300'200'0' 25'
N
DATE: 02/03/23
KEY:
POWER LINE EASEMENTS
POWER LINES
BOUNDARY LINES
WATER PIPE EASEMENTS
NEW RESIDENTIAL/MIXED
USE GROUND FLOOR
EXISTING BUILDINGS
PARK/LANDSCAPING
NEW CARPARKING STRUCTURE
20' SETBACK
VII. PARKING ANALYSIS
LOT 1
LOT 2
LOT 3
LOT 4
LOT 5
LOT 6
LOT A
LOT B
LOT C
OTHER:
TOTAL
LOT NO.
SURFACE PARKING
PODIUM 2FLR
PODIUM 2FLR + SURFACE
CARPARKING BUILDING @ 6FLR
HOTEL / RESIDENTIAL
LANDSCAPE PARK
SURFACE PARKING
SURFACE PARKING
SURFACE PARKING
EASEMENT OUTSIDE BOUNDARY
PARKING TYPE
64
190
300
755
78
0
443
83
156
44
2113
SPACES
DATE : 02/08/2023
NEPTUNE DISTRICT
REQUIREMENTS BY CODE:
OFFICE :
HOTEL (TBD):
RETAIL:
RESIDENTIAL:
TOTAL:
TOTAL:
1752
105
95
400
2247
4 PER 1000 SQ FT.
1 PER GUEST ROOM PLUS 1
FOR EVERY 3 EMPLOYEES.
2.5 PER 1000 SQ FT.
1 PER UNIT
REQUESTED VARIANCES:
OFFICE :
HOTEL (TBD) :
RETAIL:
RESIDENTIAL:
TOTAL:
TOTAL:
1577
105
48
400
2025
3.6 PER 1000 SQ FT.
1 PER GUEST ROOM PLUS 1
FOR EVERY 3 EMPLOYEES.
1.25 PER 1000 SQ FT.
1 PER UNIT
PARKING PROVIDED:
The Project
Proposed Use: Maintain the existing
office towers and add multifamily
residential and a hotel to the campus
with future amenity retail
Lot Coverage: 60%
Development: Four (4) five-story
apartment buildings, including
approximately 400 new units and 1
above-grade parking structure with
approximately 755 spaces (the
“Project”).
***Unit the proposed mix ratio is pending a formal market study.
Proposed Subdivision
Existing Site:Proposed Site:
On & Off-Site Improvements
The project will provide a consolidated
east/west drive through the middle of
the site, providing potential future
connectivity to the property to the west.
Minimal fill and excavation are required.
Landscape and hardscape aim to produce
a work, live, and play environment with
onsite greenery and common areas.
We are conducting a study to determine
if any off-site improvements are
necessary for sewer, water, traffic signals,
sidewalks, etc.
Remove
Remove
New
OFF RAMPBOUNDARYBOUNDARYLAKE AVE STBOUNDARY
BOUNDARY
BOUNDARYexisting easement
on carpark BOUNDARYBOUND
A
R
Y
BOUNDARY
BOUNDARYexisting easement
on carpark
TRITON
TOWER 1 BOUNDARYS GRADY W
A
Y
S GRAD
Y
W
A
Y
SHATTUCK AVEHOME DEPOT
King County ParcelEXISTING OFFICE
BUILDING
SOUTH RENTON VILLAGE PLACE TALBOT ROAD STMOVIE THEATRE
DEMOLISHED
GAS
STATION
TRITON
TOWER 2
WELLS
FARGO
existing electrical
substation 1985
to present
GAS STATION
TESLA
HIGHWAY
4
0
5
EXISTING
RETAIL
TIRE
SHOP
APPLE BEES
MCDONALDS
EXISTING
RETAIL
EXISTING
RETAIL
TRITON
TOWER 3
B
OU
N
D
A
R
Y
VICINITY MAPVICINITY MAP
200'
N
400'100'0'25'
SCALE: 1" = 200'SCALE: 1" = 200'
200'
N
100'400'0'25'
DATE: 02/03/23
KEY:
POTENTIAL FLOOD CONDITIONS
EXISTING BUILDINGS
FLOODING MAP
VICINITY AREA
DATE : 02/08/2023
NEPTUNE DISTRICT
Project Schedule
ELECTRICAL
SUBSTATION
TW 2
TW 3
LOT A LOT B
LOT 6
LOT CLOT 4
LOT 5
85 DU
LOT 1
75 DU
LOT 2
95 DU
LOT 3
145 DU
PARKING
ELECTRICAL
SUBSTATION
TW 2
TW 3
LOT A LOT B
LOT 6
LOT CLOT 4
LOT 5
LOT 1
75 DU
LOT 2
LOT 3
ELECTRICAL
SUBSTATION
TW 2
TW 3
LOT A LOT B
LOT 6
LOT CLOT 4
LOT 5
85 DU
LOT 1
75 DU
LOT 2
LOT 3
MODUFY
PHASES
PHASE 1 A
LOT 1 : 75 DU
PHASE 2
LOT 1 : 75 DU
LOT 2 : 95 DU
LOT 3 : 145 DU
LOT 4 :
PARKING LOT
5 : 85 DU
PHASE 1 B
LOT 1 : 75 DU
LOT 5 : 85 DU
MODUFY
PHASE 1 A
ELECTRICAL
SUBSTATION
TW 2
TW 3
LOT A LOT B
LOT 6
LOT CLOT 4
LOT 5
LOT 1
75 DU
LOT 2
LOT 3
MODUFY
PHASE 1 B
ELECTRICAL
SUBSTATION
TW 2
TW 3
LOT A LOT B
LOT 6
LOT CLOT 4
LOT 5
LOT 1
75 DU
LOT 2
LOT 3
85 DU
MODUFY
PHASE 2
ELECTRICAL
SUBSTATION
TW 2
TW 3
LOT A LOT B
LOT 6
LOT CLOT 4
LOT 1
75 DU
LOT 2
95 DU
LOT 3
145 DU
PARKING
LOT 5
85 DU
Vicinity Map
OFF RAMPBOUNDARYBOUNDARYLAKE AVE STBOUNDARY
BOUNDARY
BOUNDARYexisting easement
on carpark BOUNDARYBOUND
A
R
Y
BOUNDARY
BOUNDARYexisting easement
on carpark
TRITON
TOWER 1 BOUNDARYS GRADY W
A
Y
S GRAD
Y
W
A
Y
SHATTUCK AVEHOME DEPOT
King County ParcelEXISTING OFFICE
BUILDING
SOUTH RENTON VILLAGE PLACE TALBOT ROAD STMOVIE THEATRE
DEMOLISHED
GAS
STATION
TRITON
TOWER 2
WELLS
FARGO
existing electrical
substation 1985
to present
GAS STATION
TESLA
HIGHWAY
4
0
5
EXISTING
RETAIL
TIRE
SHOP
APPLE BEES
MCDONALDS
EXISTING
RETAIL
EXISTING
RETAIL
TRITON
TOWER 3
B
OU
N
D
A
R
Y
VICINITY MAPVICINITY MAP
200'
N
400'100'0'25'
SCALE: 1" = 200'SCALE: 1" = 200'
200'
N
100'400'0'25'
DATE: 02/03/23
KEY:
EXISTING BUILDINGS
VICINITY AREA
DATE : 02/08/2023
NEPTUNE DISTRICT
Site Plan
25'-6"21'-10"97'-8"281'-9"33'-7"54'-8"21'-8"OFF RAMPBOUNDARYBOUNDARY
BOUNDARY
BOUNDARY
BOUNDARYexisting easement
on carpark BOUNDARYBOUND
A
R
Y
BOUNDARY
BOUNDARYexisting easement
on carpark
TRITON
TOWER 1 BOUNDARYS GRADY W
A
Y
S GRA
D
Y
W
A
Y
SHATTUCK AVEKing County Parcel
SOUTH RENTON VILLAGE PLACE TALBOT ROAD STTRITON
TOWER 2
WELLS
FARGO
existing electrical
substation 1985
to present
TESLA
HIGHWAY
4
0
5
EXISTING
RETAIL
TIRE
SHOP
APPLE BEES
MCDONALDS
EXISTING
RETAIL
EXISTING
RETAIL
LOT A
195'-1"
LOT 6
288'-2"
LOT B 72'-0"TRITON
TOWER 3
LOT 4
212'-9"B
OU
N
D
A
R
Y
72'-0"LOT 3
LOT 572'-0"LOT 1
152'-7"LOT 2100'-2"LOT C
72'-0"ENTRY
123'-1"ENTRY
156'-1"
72'-0"
ENTRY
71'-9"
new road224'-7"landscaped
park
172'-2"PODIUM 2
84'-1"
PODIUM 1
195'-1"
CARPARK
178'-5"72'-0"HOTEL
G
123'-1"250'-8"106'-9"SITE PLAN:
TRITON VILLAGE WALK
N
300'
N
25'
SCALE: 1" = 150'
100'200'0'
DATE: 02/03/23
LOT LINES
KEY:
20' SETBACK
LOT 1
LOT 2
LOT 3
LOT 4
LOT 5
TYPE
RES.
RES.
PODIUM
RES. +
PODIUM
CARPARK
HOTEL
GRD FL
SQFT
18450
25035
43820
36209
49130
37962
20754
TOTAL
SQFT
92250
125175
219100
181045
245650
189810
124524
TOTAL
FLRS
5
5
2
5
2
6
5
II. & III. BUILDING AREA SQFT :
HEIGHT
60 FT
60 FT
30 FT
TOTAL: 90 FT
60 FT
30 FT
TOTAL: 90 FT
60 FT
60 FT
IV. PERCENTAGE OF LOT COVERAGE: 32%
V. LANDSCAPING SQFT: 10,195,890 SQFT
VI. PROPOSED MAXIMUM HEIGHT
WITH PODIUM: 90’
VI. REQUIRED SETBACK: 20’
VI. EXISTING SETBACK: 20’
I. TOTAL SQFT OF SITE: 1027247
DATE : 02/08/2023
NEPTUNE DISTRICT
Preliminary Tree Retention Plan
Tree Retention & Landscape
The project entails upgrading the affected mature
landscape and treescape with a vibrant and
younger array of plants and trees.
This will promote a renewed and modern feel to
the new work, live and play campus.
OFF RAMPBOUNDARYBOUNDARY
BOUNDARY
BOUNDARY
BOUNDARYexisting easement
on carpark BOUNDARYBOUND
A
R
Y
BOUNDARY
BOUNDARYexisting easement
on carpark
TRITON
TOWER 1 BOUNDARYS GRADY W
A
Y
S GRA
D
Y
W
A
Y
SHATTUCK AVEKing County Parcel
SOUTH RENTON VILLAGE PLACE TALBOT ROAD STTRITON
TOWER 2
WELLS
FARGO
existing electrical
substation 1985
to present
TESLA
HIGHWAY
4
0
5
EXISTING
RETAIL
TIRE
SHOP
APPLE BEES
MCDONALDS
EXISTING
RETAIL
EXISTING
RETAIL
TRITON
TOWER 3
B
OU
N
D
A
R
Y
ENTRY
ENTRY
ENTRYnew road
landscaped
park
PODIUM 2
PODIUM 1
CARPARK
HOTEL
G
LANDSCAPE PLAN:
TRITON VILLAGE WALK
SCALE: 1" = 150'
100'
N
300'200'0'25'
N
DATE: 02/03/23OFF RAMPBOUNDARYBOUNDARY
BOUNDARY
BOUNDARY
BOUNDARYexisting easementon carpark BOUNDARYBOUND ARY
BOUNDARY
BOUNDARYexisting easementon carpark
TRITON
TOWER 1 BOU NDARYS GRADY W
A
Y
S GRAD
Y
W
A
Y
SHATTUCK AVEKing County Parcel
SOUTH RENTON VILLAGE PLACE TALBOT ROAD STTRITON
TOWER 2
WELLSFARGO
existing electricalsubstation 1985to present
TESLA
HIGHWAY 4
0
5
EXISTINGRETAIL
TIRESHOP
APPLE BEES
MCDONALDS
EXISTINGRETAIL
EXISTINGRETAIL
TRITON
TOWER 3
B
OUN
D
A
R
Y
ENTRY
ENTRY
ENTRYnew road
landscapedpark
PODIUM 2
PODIUM 1
CARPARK
HOTEL
G
LANDSCAPE PLAN:TRITON VILLAGE WALK
SCALE: 1" = 150'
100'
N
300'200'0'25'
N
DATE: 02/03/23
KEY:
PROJECT: ASSEMBLY ROW
LOCATION: SOMERVILLE, MASSACHUSETTS
ARCHITECTS: COPELY WOLFF DESIGNS
PROJECT: BLACKSTONE MUSIC PARK
LOCATION: SHANGHAI, CHINA
ARCHITECTS: LAB D+H
NEPTUNE DISTRICT
Floor Plans
MODUFY
0. LOT PROPOSAL
ELECTRICAL
SUBSTATION
TW 1
TW 2
TW 3
LOT A
LOT B
LOT 6
LOT C
LOT 4
LOT 5
LOT 1
LOT 2
LOT 3
PARKING
MODUFY
0. LOT PROPOSAL
ELECTRICAL
SUBSTATION
TW 2
TW 3
LOT A LOT B
LOT 6
LOT C
LOT 1
LOT 2
LOT 3
LOT 5
LOT 4
PARKING
MODUFY
1. MODUFY UNITS
MODUFY
LOT 1
LOT 1
TW 3
LOT C
LOT 2
LOT 4
2. LAYOUT OPTIMIZATION
- STUDIO : 5%
- 1 BDR : 45%
- 2 BDR : 45%
- 3 BDR : 5 %
OPTIMIZATION GOALS
MODUFY
LOT 1
2. LAYOUT OPTIMIZATION
75
UNITS
13.3 %
53.4 %
26.7 %
6.7 %
% TYPES OF UNITS
STUDIO :
1 BDR :
2 BDR :
3 BDR :
MODUFY
LOT 2
2. LAYOUT OPTIMIZATION
LOT 1
LOT 4
LOT 2
LOT 3 LOT 5
- STUDIO : 5%
- 1 BDR : 45%
- 2 BDR : 45%
- 3 BDR : 5 %
OPTIMIZATION GOALS
MODUFY
LOT 2
2. LAYOUT OPTIMIZATION
95
UNITS
5.3%
47.4 %
36.8%
10.5 %
% TYPES OF UNITS
STUDIO :
1 BDR :
2 BDR :
3 BDR :
MODUFY
LOT 3
2. LAYOUT OPTIMIZATION
LOT 5
LOT 3
TW 2
- STUDIO : 5%
- 1 BDR : 45%
- 2 BDR : 45%
- 3 BDR : 5 %
OPTIMIZATION GOALS
MODUFY
LOT 3
2. LAYOUT OPTIMIZATION
145
UNITS
17.2%
44.8 %
31%
6.9 %
% TYPES OF UNITS
STUDIO :
1 BDR :
2 BDR :
3 BDR :
MODUFY
LOT 5 - RESIDENTIAL
2. LAYOUT OPTIMIZATION
LOT 5
LOT 4
TW 2
- STUDIO : 5%
- 1 BDR : 45%
- 2 BDR : 45%
- 3 BDR : 5 %
OPTIMIZATION GOALS
MODUFY
LOT 5 - RESIDENTIAL
85
UNITS
2. LAYOUT OPTIMIZATION
11.8 %
47.1 %
35.3 %
5.9 %
% TYPES OF UNITS
STUDIO :
1 BDR :
2 BDR :
3 BDR :
MODUFY
LOT 5
2. LAYOUT OPTIMIZATION
LOT 5
LOT 4
TW 2
- DEN : 25%
- STUDIO : 50%
- SUITE : 25%
OPTIMIZATION GOALS
MODUFY
LOT 5 - HOTEL
2. LAYOUT OPTIMIZATION
150
UNITS
22.7%
43.3 %
24%
% TYPES OF UNITS
DEN :
STUDIO/ SS :
SUITE L :
MODUFY
3. MASTERPLAN
ELECTRICAL
SUBSTATION
TW 2
TW 3
LOT A LOT B
LOT 6
LOT CLOT 4
LOT 1
75 DU
LOT 2
95 DU
LOT 3
145 DU
PARKING
LOT 5 - R
85 DU
MODUFY
3. MASTERPLAN
ELECTRICAL
SUBSTATION
TW 1
TW 2
TW 3
LOT A
LOT 6
LOT 4
LOT 1
LOT 2
LOT 3
PARKING
LOT B
LOT C
- RESIDENTIAL
- RESIDENTIAL
- RESIDENTIAL
- RESIDENTIAL
LOT 5 - H
Conceptual Building Elevations
Project: Paseo Verde
Location: Philadelphia, Pennsylvania
Project: Capital Hill Station
Location: Washington D.C.
Project: Caddies Boulevard
Location: Sydney, Australia
Project: Ely Court
Location: South Kilburn, London
Completed Modular Multifamily Projects
See our portfolio
HERE
Sterling Manor -Regina, Saskatchewan 320 Units Domain -San Jose, California 430 Units
Eviva -Sacramento, California 118 Units Cubix -Seattle, Washington 93 Units
Sewer and Water Availability Information
Utilities Availability Information
Utility Availability Requirement Surplus/Deficit
Water Available TBD TBD
Sewer Available TBD TBD
Storm Drainage Available TBD TBD
Electricity Available TBD TBD
Telecom Available TBD TBD
We are working with the architects and engineers to determine the capacity required.
This will be submitted with the permit set of plans for permit issuance.
Additional Topics
Additional Topics Table of Contents:
•Modifications (Height, Density, Unit SF)
•Parking (reduction for AFH per RCW 36.70A.540 –1 space per 4 units)
•Tax abatement
•Signage district
•Control of landscaping on the easements
Modifications (Height, Density, Unit SF)
This project seeks a Modification for the following:
•Residential use limit of 25% of the total gross floor area of all buildings on site.
•Structured Parking (podiums) -Also, the project entails one free-standing parking structure
•40% ground-floor commercial requirement in the residential buildings.
*Subject to the Developer’s final design and City approvals
Parking Reduction
This project seeks parking requirement exceptions under the City of Renton Housing Action Plan.
We seek less than 1/unit for residential based on the local apartment market and TOD.
We seek less than 4/1000 for the office.
Signage District
We want to incorporate digital pylon signs and
lighting to enhance the customer experience.
The Sign District shall encompass the entire property.
The Sign District would serve as a catalyst for
investment in the City as a key destination for
business, entertainment, and cultural activities.
The Sign District will foster a vibrant urban
environment with a unified aesthetic and sense of
identity.
The Sign District will allow the City to announce itself
with a gateway-type signage facing the freeway.
Proposed Signage District POV
Control of Landscaping on the Easements
This project seeks to perform the
landscaping over the easements as a
means to ensure the desired curb
appeal along S. Grady Way & Talbot
Road South at the cost of the City of
Renton.
We want to control the site perimeter
We need to have an agreement in
place for this maintenance.
Please send inquiries by email to:
Bseiden@innovatuscp.com | David@buildingz.io |Jack@mhseattle.com
Innovatus Capital Partners
777 Third Avenue, 25th Floor New York, NY 10017 P: (212) 698-4580
www.innovatuscp.com