Loading...
HomeMy WebLinkAboutP_ConstructionPlans V15aEFFICIENT WATER HEATING 5a:All showerhead and kitchen sink faucets installed in the house shall be rated at 1.75GPM or less. All other lavatory faucets shall be rated at 1.0 GPM or less.cTo qualify to claim this credit, the building permit drawings shall specify the optionbeing selected and shall specify the maximum flow rates for all showerheads, kitchensink faucets, and other lavatory faucets.0.5EFFICIENT WATER HEATING 5c:5cWater heating system shall include one of the following:Certified Solar Water Heating SystemsGas, propane or oil water heater with a minimum EF of 0.91orSolar water heating supplementing a minimum standard water heater. Solar waterheating will provide a rated minimum savings of 85 therms or 2000 kWh based on theSolar Rating and Certification Corporation (SRCC) Annual Performance of OG-300orElectric heat pump water heater with a minimum EF of 2.0 and meeting the standardsof NEEA's Northern Climate Specifications for Heat Pump Water HeatersTo qualify to claim this credit, the building permit drawings shall specify the optionbeing selected and shall specify the water heater equipment type and the minimumequipment efficiency and, for solar water heating systems, the calculation of theminimum energy savings.1.5Table 406.2OPTION1aEnergy Credits (2015 Code)DESCRIPTIONEFFICIENT BUILDING ENVELOPE 1a:Prescriptive compliance is based on Table R402.1.1 with the following modifications:Vertical fenestration U = 0.28Floor R-38Slab on grade R-10 perimeter and under entire slabBelow grade slab R-10 perimeter and under entire slaborCompliance based on Section R402.1.4: Reduce the Total UA by 5%.CREDIT(S)0.5Estimated Cost3aHIGH EFFICIENCY HVAC EQUIPMENT 3a:Gas, propane or oil-fired furnace with minimum AFUE of 94%, orGas, propane or oiled-fired boiler with minimum AFUE of 92%To qualify to claim this credit, the building permit drawings shall specify the optionbeing selected and shall specify the heating equipment type and the minimum1.0 TABLE R402.1.1INSULATION AND FENESTRATION REQUIREMENTS BY COMPONENTa WOOD-FRAMED SHEAR WALL SCHEDULEFOR HEM-FIR/DOUG-FIR STUD FRAMINGWOOD-FRAMED SHEAR WALL SCHEDULEFOR HEM-FIR/DOUG-FIR STUD FRAMING WOOD-FRAMED SHEAR WALL SCHEDULEFOR HEM-FIR/DOUG-FIR STUD FRAMINGWOOD-FRAMED SHEAR WALL SCHEDULEFOR HEM-FIR/DOUG-FIR STUD FRAMING with mastic. If flex ducts are used, they cannot contain splices. Flex duct connections3abHIGH EFFICIENCY HVAC EQUIPMENT 3a:Gas, propane or oil-fired furnace with minimum AFUE of 94%, orGas, propane or oiled-fired boiler with minimum AFUE of 92%To qualify to claim this credit, the building permit drawings shall specify the optionbeing selected and shall specify the heating equipment type and the minimumequipment efficiency.3bbHIGH EFFICIENCY HVAC EQUIPMENT 3b:Air-source heat pump with minimum HSPF of 9.0To qualify to claim this credit, the building permit drawings shall specify the optionor1cbeing selected and shall specify the heating equipment type and the minimumequipment efficiency.3cbHIGH EFFICIENCY HVAC EQUIPMENT 3c:Closed-loop ground source heat pump; with a minimum COP of 3.3orOpen loop water source heat pump with a maximum pumping hydraulic head of 150feet and minimum COP of 3.6To qualify to claim this credit, the building permit drawings shall specify the optionbeing selected and shall specify the heating equipment type and the minimumequipment efficiency.3dbHIGH EFFICIENCY HVAC EQUIPMENT 3d:Ductless Split System Heat Pumps, Zonal Control: In homes where the primary spaceheating system is zonal electric heating, a ductless heat pump system shall be installedand provide heating to the largest zone of the housing unit.To qualify to claim this credit, the building permit drawings shall specify the optionbeing selected and shall specify the heating equipment type and the minimumequipment efficiency.4HIGH EFFICIENCY HVAC DISTRIBUTION SYSTEM:All heating and cooling system components installed inside the conditioned space.This includes all equipment and distribution system components such as forced airducts, hydronic piping, hydronic floor heating loop, convectors and radiators. Allcombustion equipment shall be direct vent or sealed combustion.For forced air ducts: A maximum of 10 linear feet of return ducts and 5 linear feet ofsupply ducts may be located outside the conditioned space. All metallic ducts locatedoutside the conditioned space must have both transverse and longitudinal joints sealedmust be made with nylon straps and installed using a plastic strapping tensioning tool.Ducts located outside the conditioned space must be insulated to a minimum of R-8.Locating system components in conditioned crawl spaces is not permitted under thisoption.Electric resistance heat and ductless heat pumps are not permitted under this option.Direct combustion heating equipment with AFUE less than 80% is not permittedunder this option.To qualify to claim this credit, the building permit drawings shall specify the optionbeing selected and shall specify the heating equipment type and shall show thelocation of the heating and cooling equipment and all the ductwork.1.01.01.01.51.0Table 406.2OPTION1aEnergy Credits (2015 Code)DESCRIPTIONEFFICIENT BUILDING ENVELOPE 1a:Prescriptive compliance is based on Table R402.1.1 with the following modifications:Vertical fenestration U = 0.28Floor R-38Slab on grade R-10 perimeter and under entire slabBelow grade slab R-10 perimeter and under entire slaborCompliance based on Section R402.1.4: Reduce the Total UA by 5%.1bEFFICIENT BUILDING ENVELOPE 1b:Prescriptive compliance is based on Table R402.1.1 with the following modifications:Vertical fenestration U = 0.25Wall R-21 plus R-4Floor R-38Basement wall R-21 int plus R-5 ciSlab on grade R-10 perimeter and under entire slabBelow grade slab R-10 perimeter and under entire slabCompliance based on Section R402.1.4: Reduce the Total UA by 15%.EFFICIENT BUILDING ENVELOPE 1c:Prescriptive compliance is based on Table R402.1.1 with the following modifications:Vertical fenestration U = 0.22Ceiling and single-rafter or joist-vaulted R-49 advancedWood frame wall R-21 int plus R-12 ciFloor R-38Basement wall R-21 int plus R-12 ciSlab on grade R-10 perimeter and under entire slabBelow grade slab R-10 perimeter and under entire slaborCompliance based on Section R402.1.4: Reduce the Total UA by 30%.1da2aEFFICIENT BUILDING ENVELOPE 1d:Prescriptive compliance is based on Table R402.1.1 with the following modifications:Vertical fenestration U = 0.24AIR LEAKAGE CONTROL AND EFFICIENT VENTILATION 2a:show the heat recovery ventilation system.Compliance based on R402.4.1.2: Reduce the tested air leakage to 3.0 air changes perhour maximumandAll whole house ventilation requirements as determined by Section M1507.3 of theInternational Residential Code shall be met with a high efficiency fan (maximum 0.35watts/cfm), not interlocked with the furnace fan. Ventilation systems using a furnaceincluding an ECM motor are allowed, provided that they are controlled to operate atlow speed in ventilation only mode.To qualify to claim this credit, the building permit drawings shall specify the optionbeing selected and shall specify the maximum tested building air leakage and shallshow the qualifying ventilation system.2bAIR LEAKAGE CONTROL AND EFFICIENT VENTILATION 2b:Compliance based on Section R402.4.1.2: Reduce the tested air leakage to 2.0 airchanges per hour maximumandAll whole house ventilation requirements as determined by Section M1507.3 of theInternational Residential Code shall be met with a heat recovery ventilation systemwith minimum sensible heat recovery efficiency of 0.70.To qualify to claim this credit, the building permit drawings shall specify the optionbeing selected and shall specify the maximum tested building air leakage and shallshow the heat recovery ventilation system.CREDIT(S)0.5Estimated Cost1.02.00.50.51.0EFFICIENT WATER HEATING 5c:Water heating system shall include one of the following:2cAIR LEAKAGE CONTROL AND EFFICIENT VENTILATION 2c:Compliance based on Section R402.4.1.2: Reduce the tested air leakage to 1.5 airchanges per hour maximumandAll whole house ventilation requirements as determined by Section M1507.3 of theInternational Residential Code shall be met with a heat recovery ventilation systemwith minimum sensible heat recovery efficiency of 0.85.To qualify to claim this credit, the building permit drawings shall specify the optionbeing selected and shall specify the maximum tested building air leakage and shall1.5from all the showers, and has a minimum efficiency of 40% if installed for equal flowTable 406.2Energy Credits (2015 Code)DESCRIPTIONCREDIT(S)Estimated Cost5aEFFICIENT WATER HEATING 5a:All showerhead and kitchen sink faucets installed in the house shall be rated at 1.75GPM or less. All other lavatory faucets shall be rated at 1.0 GPM or less.cTo qualify to claim this credit, the building permit drawings shall specify the optionbeing selected and shall specify the maximum flow rates for all showerheads, kitchensink faucets, and other lavatory faucets.5bEFFICIENT WATER HEATING 5b:Water heating system shall include one of the following:Gas, propane or oil water heater with a minimum EF of 0.74orWater heater heated by ground source heat pump meeting the requirements of Option3c.orFor R-2 occupancy, a central heat pump water heater with an EF greater than 2.0 thatwould supply DHW to all the units through a central water loop insulated with R-8minimum pipe insulation.To qualify to claim this credit, the building permit drawings shall specify the optionbeing selected and shall specify the water heater equipment type and the minimumminimum annual energy power production.equipment efficiency.5corGas, propane or oil water heater with a minimum EF of 0.91Solar water heating supplementing a minimum standard water heater. Solar waterheating will provide a rated minimum savings of 85 therms or 2000 kWh based on theSolar Rating and Certification Corporation (SRCC) Annual Performance of OG-300Certified Solar Water Heating SystemsorElectric heat pump water heater with a minimum EF of 2.0 and meeting the standardsof NEEA's Northern Climate Specifications for Heat Pump Water HeatersTo qualify to claim this credit, the building permit drawings shall specify the optionbeing selected and shall specify the water heater equipment type and the minimumequipment efficiency and, for solar water heating systems, the calculation of theminimum energy savings.5dEFFICIENT WATER HEATING 5d:A drain water heat recovery unit(s) shall be installed, which captures waste water heator a minimum efficiency of 52% if installed for unequal flow. Such units shall berated in accordance CSA B55.1 and be so labeled.To qualify to claim this credit, the building permit drawings shall include a plumbingdiagram that specified the drain water heat recovery units and the plumbing layoutneeded to install it and labels or other documentation shall be provided thatdemonstrates that the unit complies with the standard.0.51.01.50.56RENEWABLE ELECTRIC ENERGY:For each 1200 kWh of electrical generation per each housing unit provided annuallyby on-site wind or solar equipment a 0.5 credit shall be allowed, up to 3 credits.Generation shall be calculated as follows:For solar electric systems, the design shall be demonstrated to meet this requirementusing the National Renewable Energy Laboratory calculator PVWATTs.Documentation noting solar access shall be included on the plans.For wind generation projects designs shall document annual power generation basedon the following factors:The wind turbine power curve; average annual wind speed at the site; frequencydistribution of the wind speed at the site and height of the tower.To qualify to claim this credit, the building permit drawings shall specify the optionbeing selected and shall show the photovoltaic or wind turbine equipment type,provide documentation of solar and wind access, and include a calculation of the0.5 ELEVATION VIEWEXCEPTIONS:SHOWERDeck Ledger Connection to Band Joist (a, b)(Reference IRC Table R507.2 -For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm, 1 pound per square foot = 0.0479 kPa.Joist SpanConnection Details½ inch diameter lag screw with½ inch maximum sheathing c,d½ inch diameter bolt with ½ inchmaximum sheathingd½ inch diameter bolt with 1 inchmaximum sheathingea.b.c.d.e.223026162219131816On-center spacing of fasteners1191513The tip of the lag screw shall fully extend beyond the inside face of the band joist.Sheathing shall be wood structural panel or solid sawn lumber.Sheathing shall be permitted to be wood structural panel, gypsum board, fiberboard, lumber or foam sheathing. Upto 1/2-inch thickness of stacked washers shall be permitted to substitute for up to ½-inch of allowable sheathingthickness where combined with wood structural panel or lumber sheathing.131181110Ledgers shall be flashed in accordance with Section R703.4 to prevent water from contacting the house band joist.Snow load shall not be assumed to act concurrently with live load.7109Placement of Lag Screws and Bolts in Ledgers and Band Joists(Reference IRC Table 507.2.1)Ledger (a)Minimum End and Edge Distance and Spacing Between RowsTop Edge2 inches (d)Bottom Edge3/4 inchBand joist (c)3/4 inch2 inches (e)Ends2 inches (b)2 inches (b)Row Spacing1 5/8 inches (b)1 5/8 inches (b)For SI: 1 inch = 25.4mma. Lag screws or bolts must be staggered from the top and bottom along the horizontal run. See figure below.b. Maximum 5 inches.c. For engineered rim joists, the manufacturer's recommendations govern.d. The minimum distance from the bottom row to the top edge of the ledger must be in addordance with figure below.e. 2 inches may be reduced to 3/4 inch when the band joist is directly supported by a munsill, header, or by double top wall plates.*ARE USED OR IF BOLT SPACING IS REDUCED TOTHAT OF LAG SCREWS TO ATTACH 2X8 LEDGERS TO2X8 BAND JOISTS.DISTANCE CAN BE REDUCED TO 4.5" IF LAG SCREWS Notes:1.Outdoor environments are generally more corrosive to steel. If you choose to use ZMAX® or HDG finish or stainless steel material on an outdoor project, you should periodically inspect your connectors and fasteners or have a professionalinspection performed. Regular maintenance, including water-proofing of the wood used in your outdoor project is also a good practice.2.Coatings Available:2.1.ZMAX: Galvanized (G185) 1.85 oz. of zinc per square foot of surface area. (hot-dip galvanized per ASTM A653 total both sides). These products require hot-dip galvanized fasteners (fasteners which meet the specifications of ASTM A153).2.2.HDG - Hot Dip Galvanized: Products are hot-dip galvanized after fabrication (14 ga. and thicker). The coating weight increases with material thickness. The minimum specified coating weight is 2.0 oz. per square foot. (per ASTM A123 totalboth sides). These products require hot-dip galvanized fasteners (fasteners which meet the specifications of ASTM A153).2.3.SS - Stainless Steel: Connectors are manufactured from Type 316L stainless steel, and provide greater durability against corrosion. Stainless-steel nails are required with stainless-steel products, and are available from Simpson Strong-Tie.3.When using stainless steel connectors, use stainless steel fasteners. When applications allow the use of ZMAX/HDG galvanized connectors, use HDG fasteners that meet the specifications of ASTM A153 or equivalent coating offered onSimpson Strong-Tie fasteners.4.Due to many variables involved with outdoor construction, Simpson Strong-Tie cannot provide estimates on service life of connectors, anchors or fasteners.5.To obtain optimal performance from Simpson Strong-Tie products, the products must be installed properly and used in accordance with the installation instructions and design limits provided by Simpson Strong-Tie.6.All installation notes and guidelines within the current Wood Construction Connectors catalog shall apply for the connectors, anchors, and fasteners shown.7.Simpson Strong-Tie reserves the right to change the specifications, design and models shown without notice or liability for such changes.8.Simpson Strong-Tie does not guarantee the performance or safety of products that are modified, improperly installed or not used in accordance with the design.9.All references to bolts or machine bolts (MB) are structural quality through bolts (not lag screws or carriage bolts) equal to or better than ASTM A307, grade A. Bolt holes shall be at least a minimum 1/32" and no more than a maximum of 1/16"larger than the bolt diameter per 2005 NDS Section 11.1.2.10.Unless noted otherwise, all references to standard cut washers refer to Type A plain washers (W) conforming to the dimensions shown in ASME B18.22.1 for the appropriate rod sizes.11.Unless stated otherwise, Simpson Strong-Tie cannot and does not make any representation regarding the suitability of use or load-carrying capacities of connectors installed with improper fasteners.0.162"0.148"0.162"0.161"0.131"0.131"0.161"0.148"0.131"0.131"0.25"16dCommon10dCommonSDScrew#10x2½16dx2½SDScrew#9x2½8dCommonSDScrew#10x1½10dx1½SDScrew#9x1½8dx1½SDS Screw¼" x variouslengths3½32½1½0Fastener Notes:1.The specified quantity, type and size of fastener must be installed in the correct holes on the connector to achievepublished loads. Incorrect fastener selection or installation can compromise connector performance and could leadto failure.2.Nail diameter assumes no coating. See technical bulletin T-NAILGUIDE for more information.3.The Simpson Strong-Drive® SD structural-connector screw is the only screw approved for use with our connectors.4.NAIL reference in tables: 16d = 16d common, 10d = 10d commonFasteningIdentificationRound HolesPurpose: to fasten aconnector.Fill requirements:always fill, unlessnoted otherwise.Obound HolesPurpose: to makefastening a connector ina tight location easier.Fill requirements:always fill.Hexagonal HolesPurpose: to fasten aconnector to concreteor masonry.Fill requirements:always fill whenfastening a connectorto concrete or masonry.Triangular HolesPurpose: to increase aconnector's strength orto achieve Max strength.Fill requirements:when the designerspecifies Max nailing.Diamond HolesPurpose: to temporarilyfasten a connector to makeinstalling easier.Fill requirements: none.Speed ProngsUsed to temporarilyposition and securethe connector foreasier and fasterinstallation.Dome NailingThis feature guidesthe nail into thejoist and header ata 45° angle.Double Shear NailingThe nail is installed in thejoist and header,distributing the load throughtwo points on each joist nailfor greater strength.Pilot HolesTooling holes formanufacturingpurposes. Nofasteners required.LUSTypicalLUS28ZInstallation1. indicates connector is available in stainless steel. Replace Z in model number with SS when ordering.2. Refer to current Wood Construction Connectors catalog for additional information.Installation:·LUS hangers install with double shear nailing.·For installations into single 2x headers or ledgers,use the specified full length fasteners into the joistand the following fasteners into the header forreduced loads in accordance withwww.strongtie.com:··10dx1½ nails for installations with Nails··SD #9x1½ for LUS28Z and LUS210Zinstallations with SD Screws··SD #10x1½ for LUS26-2Z and LUS210-2Zinstallations with SD ScrewsModel No.Dimensions (in.)FastenersNailsSD ScrewsWHBHeaderJoistHeaderJoistLUS26Z1 9/164 3/41 3/44-10d4-10d--LUS28Z1 9/166 5/81 3/46-10d4-10d6-SD #9x2½4-SD #9x2½LUS210Z1 9/167 13/161 3/48-10d4-10d8-SD #9x2½4-SD #9x2½LUS26-2Z3 1/84 7/824-16d4-16d4-SD #10x2½4-SD #10x2½LUS210-2Z3 1/8928-16d6-16d8-SD #10x2½6-SD #10x2½LUCTypical HUC Installation(LUC Similar)Model No.Dimensions (in.)FastenersNailsSD ScrewsWHBHeaderJoistHeaderJoistLUC26Z1 9/164 3/41 3/46-10d4-10dx1½6-SD #9x2½4-SD #9x1½LUC210Z1 9/167 3/41 3/410-10d6-10dx1½10-SD #9x2½6-SD #9x1½HUC26-2Z3 1/85 3/82 1/212-16d6-10d--HUC28-2Z3 1/872 1/214-16d6-10d--HUC210-2Z3 1/88 13/162 1/218-16d10-10d--1. indicates connector is available in stainless steel. Replace Z in model number with SS when ordering.2. Refer to current Wood Construction Connectors catalog for additional information.Installation:·For HUC installations, models have triangle and round holes. To achievemaximum loads, fill both round and triangle holes (fastener quantities listed fillboth holes).·For installations into single 2x headers or ledgers, use the specified full lengthfasteners into the joist and the following fasteners into the header for reducedloads in accordance with www.strongtie.com:··10dx1½ nails for installations with Nails··SD #9x1½ for LUC26Z and LUC210Z installations with SD ScrewsSUL SkewedLeft Hanger(SUR is SkewedRight)TypicalSURInstallationModel No.Joist SizeDimensions (in.)FastenersWHBA1A2HeaderJoistSUR/L26Z2x6, 81 9/16521 1/81 5/166-16d6-10dx1½SUR/L210Z2x10, 121 9/168 1/821 1/81 5/1610-16d10-10dx1½SUR/L210-2Z(2) 2x10, 123 1/88 11/162 5/81 7/162 3/814-16d6-16dx2½1. indicates connector is available in stainless steel. Replace Z in model number with SS when ordering.2. Refer to current Wood Construction Connectors catalog for additional information.LSTypicalLS50ZInstallationLS Top ViewModel No.L (in)FastenersLS30Z3 3/86-10dLS50Z4 7/88-10dLS70Z6 3/810-10d1. indicates connector is available in stainless steel. Replace Z in model number with SS when ordering.2. Refer to current Wood Construction Connectors catalog for additional information.Installation:·Field skewable; bend one time only.·Joist must be constrained against rotation(for example, with solid blocking) whenusing a single LS per connection.Model No.Dimensions (in.)FastenersWHAHeaderJoistLSU26Z1 9/164 7/81 1/26-10d5-10dx1 1/2LSSU210Z1 9/168 1/21 5/810-10d7-10dx1 1/21. For skewed LSSU, the inner most face fasteners on the acute angle side are not installed.2. Refer to current Wood Construction Connectors catalog for additional information.Installation:·Follow 3-step installation sequence forskewed or sloped/skewed applications.·Do not substitute 10dx1½ nails for facenails.·To see an installation video on this product,visit www.strongtie.comLSSU210ZSlope to45 ° up or down."A" FlangesABA44ZABU44ZTypical ABA Installation(ABU Similar)ModelNo.PostSizeDimensions (in.)AnchorDia.Post FastenersWLHHBNailsSD ScrewsMachine BoltsQty.Dia.ABA44Z4x43 9/163 1/83 1/16-1/26-10d6-SD #9x1½--ABU44Z4x43 9/1635 1/21 3/45/812-16d12-SD #10x1½21/2ABA46Z4x63 9/165 3/163 1/8-5/88-16d8-SD #10x1½--ABU46Z4x63 9/16572 5/85/812-16d-21/2ABA66Z6x65 1/25 1/43 1/8-5/88-16d8-SD #10x1½--ABU66Z6x65 1/256 1/161 3/45/812-16d-21/2ABU88Z8x87 1/277-2 - 5/818-16d---1. indicates connector is available in stainless steel. Replace Z in model number with SS when ordering.2. Refer to current Wood Construction Connectors catalog for additional information.Installation:·ABA, ABU - for pre-pour installed anchors. For SimpsonStrong-Tie epoxy or mechanical anchors, select andinstall in accordance with www.strongtie.com.·Products require washers between the nut and the base.Washers are supplied with the ABU but not the ABA,which requires a standard cut washer.Model No.Dimensions (in.)Post FastenersWLHHBNailsSD ScrewsMachine BoltsQty.Dia.PBS44AHDG3 9/163 1/26 1/43 7/1614-16d14-SD #10x1½21/2PBS66HDG5 1/25 3/86 1/23 11/1614-16d-21/21. Refer to current Wood Construction Connectors catalog for additional information.Installation:·Embed into wet concrete upto the bottom of the 1"standoff base plate. A 2"minimum side cover isrequired to obtain the fullload. Holes in the bottomof the straps allow for freeconcrete flow.·Allow concrete to curebefore installation of thepost.TypicalPBSTypicalCBSQ44Installation3" Min.Sidecover1. indicates connector is available in stainless steel. Replace -SDS2HDG in model number with SS when ordering.2. Refer to current Wood Construction Connectors catalog for additional information.Model No.PostSizeDimensions (in.)Number ofSDS ScrewsW1W2DHCBSQ44-SDS2HDG4x43 9/163 1/27 1/88 3/814-SDS ¼"x2"CBSQ46-SDS2HDG4x63 9/165 5/167 13/168 11/1614-SDS ¼"x2"CBSQ66-SDS2HDG6x65 1/25 1/26 7/88 3/414-SDS ¼"x2"CBSQ86-SDS2HDG6x87 1/25 3/86 1/88 11/1612-SDS ¼"x2"CBSQ88-SDS2HDG8x87 1/27 3/86 1/88 11/1612-SDS ¼"x2"Installation:·Install Simpson Strong-Tie SDS 14" x 2"wood screws, which are provided withthe column base, with a 38" hex headdriver. (Lag screws will not achieve thesame load.)·Allow concrete to cure beforeinstallation of the post.·For full loads, a minimum of 3" sidecover shall be provided.TypicalCBSQTypicalBCSInstallation(BCSimilar)BCS(BCSimilar)Model No.Dimensions (in.)FastenersW1W2L1L2H1H2NailsSD ScrewsBeamFlangePostFlangeBeam FlangePost FlangeBC4Z3 9/163 9/162 7/82 7/8336-16d6-16d6-SD #10x1½6-SD #10x1½BC6Z5 1/25 1/24 3/84 3/83 3/83 3/812-16d12-16d--BCS2-2/4Z3 1/83 9/162 7/82 7/82 15/162 15/168-10d6-10d8-SD #9x2½6-SD #9x2½BCS2-3/6Z4 5/85 9/164 3/82 7/83 5/162 15/1612-16d6-16d--1. indicates connector is available in stainless steel. Replace Z in model number with SS when ordering.2. Refer to current Wood Construction Connectors catalog for additional information.Installation:·BCS: Install dome nails onbeam; drive nails at an anglethrough the beam into the postbelow.·BC: Do not install bolts intopilot holes.TypicalLCE4ZInstallationLPCZACModel No.Dimensions (in.)FastenersWLNailsSD ScrewsBeamPostBeamPostAC4Z3 9/166 1/214-16d14-16d14-SD #10x1½14-SD #10x1½AC6Z5 1/28 1/214-16d14-16d14-SD #10x1½14-SD #10x1½LPC4Z3 9/163 1/28-10d8-10d8-SD #9x1½8-SD #9x1½LPC6Z5 9/165 1/28-10d8-10d--LCE4Z-5 3/814-16d10-16d14-SD #10x1½10-SD #10x1½1. indicates connector is available in stainless steel. Replace Z in model number with SS when ordering.2. Refer to current Wood Construction Connectors catalog for additional information.Installation:·Install in pairs.·For LCE4Z installations on mitered corner conditions,refer to www.strongtie.com for more information.PCTypicalEPCInstallationModelNo.PostSizeDimensions (in.)FastenersW1W2L1L2L3NailsSD ScrewsPostBeamPostBeamPCEPCPCEPCPC44-16Z4x43 9/163 9/162 5/8117 5/168-16d12-16d8-16d8-SD#10x1½12-SD#10x1½8-SD#10x1½PC46-16Z4x63 9/165 1/22 5/8139 1/48-16d12-16d8-16d---PC66-16Z6x65 1/25 1/24 9/16139 1/48-16d12-16d8-16d---1. Refer to current Wood Construction Connectors catalog for additional information.Installation:·For end condition,specify EPC·Use all specifiedfasteners.·Do not install bolts intopilot holes.CCQECCQTypicalCCQInstallationModel No.BeamWidthDimensions (in.)No. of SDS ¼"x2½" ScrewsW1W2L1HCCQECCQBeamPostCCQ3-6HDG3 1/83 1/45 1/2118 1/271614CCQ44HDG4x3 5/83 5/8118 1/271614CCQ46HDG4x3 5/85 1/2118 1/271614CCQ48HDG4x3 5/87 1/2118 1/271614CCQ66HDG6x5 1/25 1/2118 1/271614CCQ68HDG6x5 1/27 1/2118 1/2716141. indicates connector is available in stainless steel. Replace HDG in model number with SS when ordering.2. Refer to current Wood Construction Connectors catalog for additional information.Installation:·For end conditions, specify ECCQ·Install Simpson Strong-Tie SDS 14" x 212" screws,which are provided with the column cap, with a 38"hex head driver. SDS screws install best with alow speed 12" drill.·Beam depth must be a minimum 7".CCECCTypicalCCInstallationModel No.BeamWidthDimensions (in.)Machine BoltsW1W2LH1Dia.BeamPostCCECCCCECCCC3-1/4-4HDG3 1/83 1/43 5/8117 1/26 1/25/8422CC3-1/4-6HDG3 1/83 1/45 1/2117 1/26 1/25/8422CC44HDG4x3 5/83 5/875 1/245/8212CC66HDG6x5 1/25 1/2117 1/26 1/25/84221. indicates connector is available in stainless steel. Replace HDG in model number with SS when ordering.2. Refer to current Wood Construction Connectors catalog for additional information.Installation:·For end conditions, specify ECC·Bolt holes shall be a minimum 132" to a maximum 116" larger than the bolt diameter.·Contact engineered wood manufacturers for connections that are not through thewide face.·Beam depth must be at least as tall as H1.Typical H1Zand H2.5ZInstallationH1ZH2.5ZModelNo.FastenersNailsSD ScrewsTo JoistTo BeamTo JoistTo BeamH1Z6-8dx1½4-8dx1½6-SD #9x1½4-SD #9x1½H2.5Z5-8dx1½5-8dx1½5-SD #9x1½5-SD #9x1½H8Z5-10dx1½5-10dx1½5-SD #9x1½5-SD #9x1½1. indicates connector is available in stainless steel. Replace Z in model number with SS when ordering.2. Refer to current Wood Construction Connectors catalog for additional information.H8ZInstallation:·Use all specified fasteners.H1ZH2.5ZTA10ZInvertedInstallationModelNo.FastenersStringerTreadTA9Z3-SDS ¼"x1½"2-SDS ¼"x1½"TA10Z3-SDS ¼"x1½"4-SDS ¼"x1½"TA10Z4-SDS ¼"x1½"3-SDS ¼"x1½"1. indicates connector is available in stainless steel. Replace Z in model number with SS when ordering.2. Refer to current Wood Construction Connectors catalog for additional information.TA9Z(TA10Z length =10 1/4")Installation:·Use all specified fasteners.·For double 2x6 treads, installTA10Z inverted with 4 screwsinstalled into the treads.SDSLedgerInstallation1½" minimum from top of ledger and band joist4" to 5"from end ofledgerOn-center spacingof SDS wood screwsper designer3" minimumrow spacing1½" minimum frombottom of ledgerand band joistSize (in.)Model No.Thread Length(in.)¼" x 3½"SDS253122¼¼" x 5"SDS255002¾1. indicates connector is available in stainless steel. Add SS to model number when ordering.2. Refer to current F-SDSLDGR for spacing and additional information.3. The screws shall be staggered from the top to the bottom along the horizontal run of the deck ledger per IRC 2009 Section R502.2.2.1.1.SDSScrewInstallation:·Install Simpson Strong-Tie SDSwood screws with a 38" hexhead driver.·SDS screws install best with alow speed 12" drill.DTT2ZModel No.CLAnchorDia.FastenersDTT2Z13/161/2"8-SDS ¼"x1½"1. indicates connector is available in stainless steel. Replace Z in model numberwith SS when ordering.2. Refer to T-GRDRLPST and T-DECKLATLOAD for additional information.Installation:·Install Simpson Strong-Tie SDS wood screwswith a 38" hex head driver. SDS screws installbest with a low speed high torque drill.·A standard cut washer (provided) must beinstalled between the nut and the DTT2Z seat.·Bolt holes shall be a minimum 132" to a maximum116" larger than the bolt diameter.DTT2Z Installed as a Lateral Connector for a DeckGuardrail Post.For more information on guardrail post connections,and installation instructions, see technical bulletinT-GRDRLPST (available at www.strongtie.com).DTT2Z Installed as a Lateral Connector for aDeck-to-House Lateral Load ConnectionFor more information on this connection, and installationinstructions, see technical bulletin T-DECKLATLOAD(available at www.strongtie.com).LSCZ TypicalInstallationLSCZDeck FramingStair StringerModelNo.FastenersNailsSD ScrewsRim JoistStringerWide FaceStringerNarrow FaceRim JoistStringerWide FaceStringerNarrow FaceLSCZ8-10dx1½8-10dx1½1-10dx1½8-SD #9x1½8-SD #9x1½1-SD #9x1½LSCZInstallation:·Before fastening, position the stair stringer with the LSCZ on the carrying member to verify where the bendshould be located.·Tabs on the LSCZ must be positioned to the inside of the stairs.·The fastener that is installed into the bottom edge of the stringer must go into the second-to-last hole.·A minimum distance of 34" measured from the lowest rim-joist fastener to the edge of rim joist is required.1. indicates connector is available in stainless steel. Replace Z in model number with SS when ordering. Stainless steel models must be fastened with nails.2. Refer to current Wood Construction Connectors catalog for additional information.Installation:·The joist may be square cut or bevel cut.·These hangers will normally accommodate a 40° to50° skew.