Loading...
HomeMy WebLinkAboutProspectusLocal Agency Federal AidProject Prospectus Prefix Route ( ) Federal Aid Project Number Local Agency Project Number WSDOT Use Only Date DUNS Number Federal Employer Tax ID Number Agency CA Agency Yes No Federal Program Title 20.205 Other Project Title Start Latitude N End Latitude N Start Longitude W End Longitude W Project Termini From-To Nearest City Name Project Zip Code (+4) Begin Mile Post End Mile Post Length of Project Award Type Local Local Forces State Railroad Route ID Begin Mile Point End Mile Point City Number County Number County Name WSDOT Region Legislative District(s) Congressional District(s) Urban Area Number Phase Total Estimated Cost (Nearest Hundred Dollar) Local Agency Funding (Nearest Hundred Dollar) Federal Funds (Nearest Hundred Dollar) Phase Start Date Month Year P.E. R/W Const. Total Description of Existing Facility (Existing Design and Present Condition) Roadway Width Number of Lanes Description of Proposed Work Description of Proposed Work (Attach additional sheet(s) if necessary) Local Agency Contact Person Title Phone Mailing Address City State Zip Code Project Prospectus By Mayor Armondo Pavone, Approving Authority ATTEST Date DOT Form 140-101 Revised 01/2022 Previous Editions Obsolete ( ) Page 1 CAG-23-037, Prospectus Jason A. Seth, City Clerk 2/27/2023 Agency Project Title Date Type of Proposed Work Project Type (Check all that Apply) New Construction Reconstruction Railroad Bridge Path / Trail Pedestrian / Facilities Parking 3-R 2-R Other Roadway Width Number of Lanes Geometric Design Data Description Federal Functional Classification Terrain Posted Speed Design Speed Existing ADT Design Year ADT Design Year Design Hourly Volume (DHV) Through Route Urban Rural NHS Principal Arterial Minor Arterial Collector Major Collector Minor Collector Local Access Flat Roll Mountain Crossroad Urban Rural NHS Principal Arterial Minor Arterial Collector Major Collector Minor Collector Local Access Flat Roll Mountain Performance of Work Preliminary Engineering Will Be Performed By Others % Agency % Construction Will Be Performed By Contract % Agency % Environmental Classification Class I - Environmental Impact Statement (EIS) Project Involves NEPA/SEPA Section 404 Interagency Agreement Class III - Environmental Assessment (EA) Project Involves NEPA/SEPA Section 404 Interagency Agreements Class II - Categorically Excluded (CE) Projects Requiring Documentation (Documented CE) Environmental Considerations DOT Form 140-101 Revised 01/2022 Previous Editions Obsolete Page 2 Agency Project Title Date Right of Way No Right of Way Needed *All construction required by the contract can be accomplished within the existing right of way. Right of Way Needed No Relocation Relocation Required Utilities No utility work required All utility work will be completed prior to the startof the construction contract All utility work will be completed in coordinationwith the construction contract Railroad No railroad work required All railroad work will be completed prior to the start ofthe construction contract All the railroad work will be completed in coordinationwith the construction contract Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project FAA Involvement Is any airport located within 3.2 kilometers (2 miles) of the proposed project? Yes No Remarks This project has been reviewed by the legislative body of the administration agency or agencies, or it’s designee, and is not inconsistent with the agency’s comprehensive plan for community development. Agency ByDate Mayor Armondo Pavone DOT Form 140-101 Revised 01/2022 Previous Editions Obsolete Page 3 2/27/2023 City of Renton ATTEST: Jason A. Seth, City Clerk