HomeMy WebLinkAboutProspectusLocal Agency Federal AidProject Prospectus
Prefix Route ( )
Federal Aid
Project Number
Local Agency
Project Number WSDOT Use Only
Date
DUNS Number
Federal Employer
Tax ID Number
Agency CA Agency
Yes No
Federal Program Title
20.205 Other
Project Title Start Latitude N
End Latitude N
Start Longitude W
End Longitude W
Project Termini From-To Nearest City Name Project Zip Code (+4)
Begin Mile Post End Mile Post Length of Project Award Type
Local Local Forces State Railroad
Route ID Begin Mile Point End Mile Point City Number County Number County Name
WSDOT Region Legislative District(s) Congressional District(s) Urban Area Number
Phase Total
Estimated Cost (Nearest Hundred Dollar)
Local Agency
Funding (Nearest Hundred Dollar)
Federal Funds
(Nearest Hundred Dollar)
Phase Start
Date Month Year
P.E.
R/W
Const.
Total
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width Number of Lanes
Description of Proposed Work
Description of Proposed Work (Attach additional sheet(s) if necessary)
Local Agency Contact Person Title Phone
Mailing Address City State Zip Code
Project Prospectus
By
Mayor Armondo Pavone, Approving Authority
ATTEST Date
DOT Form 140-101
Revised 01/2022 Previous Editions Obsolete
( )
Page 1
CAG-23-037, Prospectus
Jason A. Seth, City Clerk 2/27/2023
Agency Project Title Date
Type of Proposed Work
Project Type (Check all that Apply)
New Construction
Reconstruction
Railroad
Bridge
Path / Trail
Pedestrian / Facilities
Parking
3-R
2-R
Other
Roadway Width Number of Lanes
Geometric Design Data
Description
Federal
Functional
Classification
Terrain
Posted Speed
Design Speed
Existing ADT
Design Year ADT
Design Year
Design Hourly Volume (DHV)
Through Route
Urban
Rural
NHS
Principal Arterial
Minor Arterial
Collector
Major Collector
Minor Collector
Local Access
Flat Roll Mountain
Crossroad
Urban
Rural
NHS
Principal Arterial
Minor Arterial
Collector
Major Collector
Minor Collector
Local Access
Flat Roll Mountain
Performance of Work
Preliminary Engineering Will Be Performed By Others
%
Agency
%
Construction Will Be Performed By Contract
%
Agency
%
Environmental Classification
Class I - Environmental Impact Statement (EIS)
Project Involves NEPA/SEPA Section 404
Interagency Agreement
Class III - Environmental Assessment (EA)
Project Involves NEPA/SEPA Section 404
Interagency Agreements
Class II - Categorically Excluded (CE)
Projects Requiring Documentation
(Documented CE)
Environmental Considerations
DOT Form 140-101
Revised 01/2022 Previous Editions Obsolete
Page 2
Agency Project Title Date
Right of Way
No Right of Way Needed
*All construction required by the
contract can be accomplished
within the existing right of way.
Right of Way Needed
No Relocation Relocation Required
Utilities
No utility work required
All utility work will be completed prior to the startof the construction contract
All utility work will be completed in coordinationwith the construction contract
Railroad
No railroad work required
All railroad work will be completed prior to the start ofthe construction contract
All the railroad work will be completed in coordinationwith the construction contract
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project? Yes No
Remarks
This project has been reviewed by the legislative body of the administration agency or agencies, or it’s
designee, and is not inconsistent with the agency’s comprehensive plan for community development.
Agency
ByDate Mayor Armondo Pavone
DOT Form 140-101
Revised 01/2022 Previous Editions Obsolete Page 3
2/27/2023
City of Renton
ATTEST:
Jason A. Seth, City Clerk