Loading...
HomeMy WebLinkAboutAddendum No. 3 - PlansLJBRJFJan 20, 2023Mar 1, 2023REN21-0234WHBPS-D-M01.DWGSHOWN M01 11 32 DWG NO.:DATEDESCRIPTIONREVISIONSBYREVIEWENGINEER:SAVE DATE:REVIEWED:PLOT DATE:CLIENT:FILENAME:SHEET NO.:JOB NO.:NO.0"1"2" DRAWING IS FULL SCALE WHEN BAR MEASURES 2" SCALE:CITY OF RENTONWEST HILL BOOSTER PUMP STATIONIMPROVEMENTS PROJECTCITY OF RENTONWEST HILL BOOSTER PUMP STATIONIMPROVEMENTS PROJECT001/20/23ISSUED FOR BIDDINGLJBRJFEXISTING MECHANICAL DEMOLITION PLAN CL 6" DISC6" DISC8" SUCT8" SUCTEXISTING HIGH CAPACITY PUMP, TO BE REMOVED. PUMP CAN TO BE REUSED FOR PROPOSED 150 HP PUMP. SEE PHASING NOTE THIS SHEET FOR ADDITIONAL INFORMATION.8" DISC10" SUCT4" DISC4" SUCT12" DISC 12" SUCT NOTE: BELOW GRADE PIPING SHOWN IN THIS VIEW AS DASHED LINES EXISTING PUMP, MOTOR, AND ANY APPURTENANCES FROM PUMP BAY 2 TO BE INSTALLED IN PUMP BAY 1. PUMP CAN TO BE REUSED FOR PROPOSED 75 HP PUMP. ADDITIONAL INFORMATION REGARDING EXISTING PUMP AND CAN CONFIGURATION IS PROVIDED IN APPENDIX D FOR REFERENCE PURPOSES, TYP. OF ALL EXISTING PUMPS. EXISTING MECHANICAL CONFIGURATION EXISTING DIESEL ENGINE AND FUEL TANK 03 04 DIESEL TANK TO BE REMOVED DIESEL ENGINE AND OTHER COMPONENTS INCLUDING EXISTING EXHAUST SYSTEM TO BE REMOVED PUMP BAY 4 EXISTING FUTURE CONNECTION 05 EXISTING CONCRETE CARRIER PIPE COVER, TO BE REMOVED PUMP BAY 1PUMP BAY 2PUMP BAY 3PUMP BAY 4 030504 CL GENERAL PHASING: 1.ISOLATE THE BPS FROM THE WATER SYSTEM AS NECESSARY TO INSTALL PROPOSED 90 DEGREE BENDS AND BUTTERFLY VALVES (AND BLIND FLANGES OR OTHER MECHANISM FOR SECONDARY ISOLATION) WITHIN PUMP BAY NO. 1. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION REGARDING ISOLATION/SHUTDOWN LIMITATIONS. 2.SUPPLY AND INSTALL TEMPORARY POWER SUPPLY AND STARTER/DRIVE FOR THE EXISTING 60 HP PUMP IN PUMP BAY NO. 3. SEE SPECIFICATIONS FOR TEMPORARY PUMP SYSTEM (EXISTING BAY NO. 3 PUMP AND CONTRACTOR PROVIDED POWER SUPPLY AND STARTER/DRIVE) PERFORMANCE REQUIREMENTS. CITY WILL OPERATE THE TEMPORARY PUMPING SYSTEM. 3.MOVE EXISTING PUMP FROM BAY NO. 2 TO BAY NO. 1 AND INSTALL ALL PROPOSED PIPING AND APPURTENANCES WITHIN PUMP BAY NO. 1. INSTALL PROPOSED PUMP IN BAY NO. 2. CONNECT BOTH BAY NO. 1 AND 2 TO THE NEW ELECTRICAL AND CONTROL SYSTEMS. PERFORM START UP AND TESTING PER SPECIFICATIONS. OBTAIN WRITTEN ACCEPTANCE FROM OWNER AND/OR ENGINEER PRIOR TO PERMANENT COMMISSIONING. 4.REMOVE EXISTING PUMP FROM BAY NO. 4, DIESEL ENGINE AND ASSOCIATED FUEL SYSTEM AND STORAGE TANK AND REPLACE WITH PROPOSED PUMP. REMOVE TEMPORARY PUMPING SYSTEM AND INSTALL PROPOSED PUMP IN BAY NO. 3. PERFORM START UP AND TESTING PER SPECIFICATIONS. OBTAIN WRITTEN ACCEPTANCE FROM OWNER AND/OR ENGINEER PRIOR TO PERMANENT COMMISSIONING. NOTES: ·EXISTING PUMP AND MOTORS NOT SCHEDULED FOR RELOCATION SHALL BE REMOVED AND DELIVERED TO CITY SHOPS IN A CLEAN AND OPERABLE CONDITION. ·THE EXISTING DIESEL PUMP WILL BE MANUALLY OPERATED BY THE CITY, ON AN AS NEEDED BASIS, TO PROVIDE BACKUP SERVICE TO THE TEMPORARY PUMPING SYSTEM WHICH IS NECESSARY TO KEEP THE WH495 TANK AT THE DESIRED OPERATIONAL ELEVATION. CONTRACTOR SHALL KEEP THE AREA AROUND THE DIESEL PUMP AND TEMPORARY PUMPING SYSTEM CLEAR OF DEBRIS, TOOLS, AND OTHER CONSTRUCTION RELATED ITEMS AND ACCESSIBLE TO THE CITY AT ALL TIMES.EXISTING MECHANICAL ANDDEMOLITION PLANDO NOT DISTURB EXISTING CONCRETE PAD OR CONTAINMENT WALL EXISTING PUMP AND MOTOR, TO BE REMOVED. PUMP CAN TO BE REUSED FOR PROPOSED 75 HP PUMP. PUMP BAY 3 PUMP BAY 2 EXISTING DIESEL PUMP CONTROL PANEL TO BE REMOVED AND RETURNED TO THE CITY, SEE IMAGE ON DWG NO. E04 EXISTING CONCRETE EQUIPMENT PAD TO BE REMOVED 103/01/2023REVISED PER ADDENDUM 3LJBRJF MBDMWBFeb 27, 2023Feb 27, 2023REN21-0234WHBPS-D-ELEC02.DWGSHOWN E02 16 32 DWG NO.:DATEDESCRIPTIONREVISIONSBYREVIEWENGINEER:SAVE DATE:REVIEWED:PLOT DATE:CLIENT:FILENAME:SHEET NO.:JOB NO.:NO.0"1"2" DRAWING IS FULL SCALE WHEN BAR MEASURES 2" SCALE:ONE-LINE DIAGRAMCITY OF RENTONWEST HILL BOOSTER PUMP STATIONIMPROVEMENTS PROJECTCITY OF RENTONWEST HILL BOOSTER PUMP STATIONIMPROVEMENTS PROJECT001/20/23ISSUED FOR BIDDINGLJBRJF480/277V WEST HILL BPS ONE-LINE DIAGRAM 400/3 TM INSIDE OUTSIDE MOTOR CONTROL CENTER "MCC", 480V, 3Ø 50/2 TM 600/3 ET, LSI 600/3 TM PROPOSED STANDBY GENERATOR PROVIDED AND INSTALLED BY CONTRACTOR M 240/120V "L" CURRENT TRANSFORMER CABINET, TO BE REPLACED UTILITY METER, TO BE REPLACED PAD-MOUNT TRANSFORMER, TO BE REPLACED PRIMARY SERVICE 60 HP EXISTINGBAY 2 PUMP60 HP EXISTINGBAY 3 PUMP400KW 150/3 TM 150/3 TM SSRVS SSRVS 600/3 ET, LSI, SE PROPOSED MAIN SERVICE DISCONNECT ATS PROPOSED AUTOMATIC TRANSFER SWITCH, "ATS" PROPOSED LOAD BANK CIRCUIT BREAKER 75 HP PUMP 275 HP PUMP 3150 HP PUMP 1MOTOR CONTROL CENTER "MCC", 480/277V, 3Ø, 4W, 600A BUS, 42 KAIC WITHSTAND GND BUS NEUTRAL SPD "L1" 240/120V 5% REACTORS 5% REACTORS 600/3 ET, LSI DIGITAL METER 200/3 TM 300/3 TM 70/2 TM PROPOSED MOTOR CONTROL CENTER 5% REACTORS 200/3 TM 480V 25 kVA 1Ø, 3W, 240/120V 200/3 TM 60 HP 1. PROPOSED UTILITY METERING. METER BASE AND ENCLOSURE BY CONTRACTOR PER SERVING UTILITY REQUIREMENTS. METER BY PUGET SOUND ENERGY. 2. GROUNDING PER DETAIL, THIS SHEET. 3. GROUND ROD PER N.E.C. (TYPICAL). SEE DWG NO. E12 FOR DETAIL. 4. EXISTING BAY 2 PUMP TO BE REUSED AS PUMP 1. 5. PROPOSED FUSING OR CIRCUIT BREAKER PER SURGE PROTECTION DEVICE MANUFACTURER'S RECOMMENDATION. 6. CONNECT EXISTING GROUNDING SYSTEM TO PROPOSED GROUND BUS. EXTEND EXISTING GROUND ELECTRODE CONDUCTOR WITH PROPOSED GROUND ELECTRODE AS NECESSARY TO REACH TERMINATION POINT. 7. SEE DWG NO. E13 FOR CONDUIT AND CONDUCTOR SCHEDULE. 8. SEE DWG NO. E13 FOR ELECTRICAL EQUIPMENT SCHEDULE. ELECTRICAL NOTES STATION LOAD CALCULATIONS PUMP 4 (150 HP)180 A X 1.25 =225 AMPS PUMP 3 (75 HP)96 A X 1.00 =96 AMPS PUMP 2 (75 HP)96 A X 1.00 =96 AMPS PUMP 1 (60 HP)77 A X 0.00 =0 AMPS HEATER 1 7.5 A X 1.00 =7.5 AMPS HEATER 2 7.5 A X 1.00 =7.5 AMPS LIGHTING TRANSFORMER (25 kVA)52.1A X 1.00 =52.1 AMPS TOTAL 484.1 AMPS #4 MIN. GND BUS #6 MIN. S/N GROUNDING #2/0 MIN.#2/0 MIN. PUMP MOTOR, TYP WATER PIPE SERVICE ENTRANCE DISCONNECT SWITCH LIGHTING TRANSFORMER UFER CONNECTION BUILDING REBAR MAT DV/DT FILTER 600/3 ET, LSI PROPOSED GENERATOR DISCONNECT PUMP 420/3 TM 20/3 TM HEATER 5KW HEATER 1HEATER 5KW HEATER 22K 1G 2F, 3K 4A 5A, 6K 7A, 8K 9F, 10F 3G 3I 1A "L2" 240/120V EXISTING MOTOR CONTROL CENTER, TO BE REMOVEDEXISTING CONDUCTORS FROM TRANSFORMER SECONDARY TO BE REMOVED 200/3 TM ACTIVE HARMONIC FILTER 22/27/23REVISED PER ADDENDUM 3MBDMWB12/27/23REVISED PER ADDENDUM 1MBDMWB MBDMWBMar 1, 2023Mar 1, 2023REN21-0234WHBPS-D-ELEC05.DWGSHOWN E05 19 32 DWG NO.:DATEDESCRIPTIONREVISIONSBYREVIEWENGINEER:SAVE DATE:REVIEWED:PLOT DATE:CLIENT:FILENAME:SHEET NO.:JOB NO.:NO.0"1"2" DRAWING IS FULL SCALE WHEN BAR MEASURES 2" SCALE:POWER DISTRIBUTION AND SIGNALPLANPOWER DISTRIBUTION AND SIGNAL PLAN PUMP 1 PROPOSED UTILITY METER PROPOSED GENERATOR DISCONNECT PROPOSED AUTOMATIC TRANSFER SWITCH, "ATS" PROPOSED MOTOR CONTROL CENTER, "MCC" PROPOSED TELEMETRY PANEL, "RTU" PROPOSED MAIN SERVICE DISCONNECT PROPOSED CONCRETE EQUIPMENT PAD DOOR CITY OF RENTONWEST HILL BOOSTER PUMP STATIONIMPROVEMENTS PROJECTCITY OF RENTONWEST HILL BOOSTER PUMP STATIONIMPROVEMENTS PROJECT001/20/23ISSUED FOR BIDDINGLJBRJF"MCC" "RTU" "RTU" PUMP 2PUMP 3PUMP 4 "RTU" "MCC""MCC""MCC""MCC" 1. SEE ELECTRICAL SITE PLAN DWG NO. E03, FOR CONTINUATION. 2. SEE DWG NO. E13 FOR CONDUIT AND CONDUCTOR SCHEDULE. 3. SEE DWG NO. E13 FOR ELECTRICAL EQUIPMENT SCHEDULE. 4. SEE DWG NO. E12 FOR CONDUIT WALL PENETRATION DETAIL. 5. SEE DWG NO. E12 FOR SURFACE MOUNT CONDUIT DETAIL. 6. ALL CONDUITS BETWEEN PUMP BAYS AND MCC TO BE ROUTED OVERHEAD BY CONTRACTOR DESIGNED SUPPORTS. CONDUITS AND SUPPORTS SHALL NOT INTERFERE WITH OPERATION OF OVERHEAD CRANE. ELECTRICAL NOTES PROPOSED CURRENT TRANSFORMER CABINET "MCC" "MCC" LIGHTING PANEL, "L1", THIS SECTION "RTU" CONTINUE CIRCUIT TO EXISTING ANTENNA MOUNTED ON ROOF. CONNECT PROPOSED CABLE TO EXISTING ANTENNA. "MCC""MCC""MCC" "MCC" "L1" "RTU" RELOCATED FLOW METER TRANSMITTER EXISTING INTRUSION DISABLE SWITCH "RTU" "MCC" "MCC""MCC""MCC" "RTU" "RTU" FLOOD SWITCH, SEE DWG NO. E12 FOR DETAIL EXISTING WALL VENTILATOR "L1" A "RTU" B 14 12/27/23REVISED PER ADDENDUM 3MBDMWBMCC DIMENSIONS MODIFIED IN ACCORDANCE WITH MOTOR FILTERING CHANGE MBDMWBMar 1, 2023Mar 1, 2023REN21-0234WHBPS-D-ELEC05.DWGSHOWN E06 20 32 DWG NO.:DATEDESCRIPTIONREVISIONSBYREVIEWENGINEER:SAVE DATE:REVIEWED:PLOT DATE:CLIENT:FILENAME:SHEET NO.:JOB NO.:NO.0"1"2" DRAWING IS FULL SCALE WHEN BAR MEASURES 2" SCALE:LIGHTING, RECEPTACLE, AND,GROUNDING PLANLIGHTING, RECEPTACLE, AND GROUNDING PLAN PUMP 1 PUMP 2 PROPOSED UTILITY METER PROPOSED CURRENT TRANSFORMER CABINET PROPOSED GENERATOR DISCONNECT PROPOSED AUTOMATIC TRANSFER SWITCH, "ATS" PROPOSED TELEMETRY PANEL, "RTU" PROPOSED MAIN SERVICE DISCONNECT PROPOSED CONCRETE EQUIPMENT PAD DOOR A2 A3 A1 A1 A1 A1 A1A1A1A1 A1 A1 A1 A1 "L1"1 "L1"2 "L1"3 GFI 6 WP GFI 4 GFI 5 GFI 5 GFI 5 GFI 4 GFI 6 WP ELECTRICAL NOTES 1. DOUBLE GANG BOX AND SWITCHES MOUNTED TO WALL. 2. GROUND ROD PER N.E.C. (TYPICAL). USE EXOTHERMIC WELD CONNECTION AT THE GROUND ROD. SEE DWG NO. E12 FOR DETAIL. LOCATE GROUND RODS 2' MINIMUM FROM BUILDING FOUNDATION. 3. CONNECTION TO EXISTING REINFORCEMENT GRID (TYPICAL OF 2 LOCATIONS). SEE DWG NO. E12 FOR ADDITIONAL DETAIL. CONTRACTOR TO VERIFY EXACT LOCATION 4. BOND GROUND SYSTEM TO WATER PIPING (TYPICAL OF 2 LOCATIONS). 5. BOND GROUND SYSTEM TO MOTOR CASING. 6. SEE DWG NO. E13 FOR LIGHTING FIXTURE SCHEDULE. 7. SEE DWG NO. E13 FOR ELECTRICAL EQUIPMENT SCHEDULE. 8. PROVIDE AND INSTALL LABELS FOR ALL LIGHT SWITCHES. LABELS SHALL INDICATE THE DEVICE CONTROLLED BY THE SWITCH. 9. LOCATE ALL LIGHT FIXTURES, SWITCHES, AND DEVICES IN LOCATION SHOWN ON THE PLANS USING ENGINEERING SCALE. ADJUST LOCATION AS NECESSARY TO AVOID INTERFERENCE WITH OTHER EQUIPMENT. 10. SEE DWG NO. E12 FOR CONDUIT WALL PENETRATION DETAIL. 11. SEE DWG NO. E12 FOR SURFACE MOUNT CONDUIT DETAIL. A# PUMP 3 PUMP 4 CITY OF RENTONWEST HILL BOOSTER PUMP STATIONIMPROVEMENTS PROJECTCITY OF RENTONWEST HILL BOOSTER PUMP STATIONIMPROVEMENTS PROJECT001/20/23ISSUED FOR BIDDINGLJBRJFGFI 6 WP GFI 4 PROPOSED MOTOR CONTROL CENTER, "MCC" LIGHTING PANEL, "L1", THIS SECTION 5 "L1" "L1"6 "L1"4 GFI 11 11 "L1" AQUA-MAG CONTROLLER DEDICATED RECEPTACLE 12/27/23REVISED PER ADDENDUM 3MBDMWBMCC DIMENSIONS MODIFIED IN ACCORDANCE WITH MOTOR FILTERING CHANGE MBDMWBFeb 27, 2023Feb 27, 2023REN21-0234WHBPS-D-ELEC06.DWGSHOWN E07 21 32 DWG NO.:DATEDESCRIPTIONREVISIONSBYREVIEWENGINEER:SAVE DATE:REVIEWED:PLOT DATE:CLIENT:FILENAME:SHEET NO.:JOB NO.:NO.0"1"2" DRAWING IS FULL SCALE WHEN BAR MEASURES 2" SCALE:MOTOR CONTROL CENTER DETAILSMOTOR CONTROL CENTER LAYOUT VFD PANEL LAYOUT A B C D E F G H I J K L M 21 PROPOSED MOTOR CONTROL CENTER "MCC" WITH DEPTH EQUAL TO 20" PROPOSED CONCRETE EQUIPMENT PAD. NAMEPLATE RUN-TIME METER START COUNTS ILLUMINATED EMERGENCY STOP PUSHBUTTON VFD FAULT LIGHT HIGH PRESSURE ALARM RESET PUSHBUTTON DISCONNECT SWITCH VFD KEYPAD MODULE PUMP RUNNING LIGHT HAND-OFF-AUTO SWITCH HIGH DISCHARGE PRESSURE LIGHT CITY OF RENTONWEST HILL BOOSTER PUMP STATIONIMPROVEMENTS PROJECTCITY OF RENTONWEST HILL BOOSTER PUMP STATIONIMPROVEMENTS PROJECT001/20/23ISSUED FOR BIDDINGLJBRJFN O 3 4 MCC CONTROL DEVICES PUMP CONTROL VALVE OPEN LIGHT 6 7 8 95 14 B 15' - 4"12/27/23REVISED PER ADDENDUM 3MBDMWB MBDMWBMar 1, 2023Mar 1, 2023REN21-0234WHBPS-D-ELEC07.DWGSHOWN E08 22 32 DWG NO.:DATEDESCRIPTIONREVISIONSBYREVIEWENGINEER:SAVE DATE:REVIEWED:PLOT DATE:CLIENT:FILENAME:SHEET NO.:JOB NO.:NO.0"1"2" DRAWING IS FULL SCALE WHEN BAR MEASURES 2" SCALE:CONTROL LOGIC DIAGRAMS 1CITY OF RENTONWEST HILL BOOSTER PUMP STATIONIMPROVEMENTS PROJECTCITY OF RENTONWEST HILL BOOSTER PUMP STATIONIMPROVEMENTS PROJECT001/20/23ISSUED FOR BIDDINGLJBRJFDIAGRAM 1: PUMP CONTROL LOGIC, PUMP 2, PUMP 3, PUMP 4, TYP.12/27/23REVISED PER ADDENDUM 3MBDMWBPASSIVE FILTER EQUIPMENT REMOVED MBDMWBMar 1, 2023Mar 1, 2023REN21-0234WHBPS-D-ELEC07.DWGSHOWN E09 23 32 DWG NO.:DATEDESCRIPTIONREVISIONSBYREVIEWENGINEER:SAVE DATE:REVIEWED:PLOT DATE:CLIENT:FILENAME:SHEET NO.:JOB NO.:NO.0"1"2" DRAWING IS FULL SCALE WHEN BAR MEASURES 2" SCALE:CONTROL LOGIC DIAGRAMS 2CITY OF RENTONWEST HILL BOOSTER PUMP STATIONIMPROVEMENTS PROJECTCITY OF RENTONWEST HILL BOOSTER PUMP STATIONIMPROVEMENTS PROJECT001/20/23ISSUED FOR BIDDINGLJBRJFDIAGRAM 2: PUMP CONTROL LOGIC, PUMP 1 DIAGRAM 3: BUILDING SMOKE DETECTOR CIRCUIT 120V L N DIAGRAM 4: OUTDOOR BUILDING LIGHTING CIRCUIT L PHOTOCELL PROVIDE ON/OFF/AUTO TOGGLE SWITCH. PHOTOCELL SHALL CONTROL LIGHTS IN AUTO POSITION. NUMBER OF FIXTURES VARY DEPENDING ON CIRCUIT. WALL-MOUNTED OUTDOOR PHOTOCELL HANDSWITCH ON OFF AUTO 12/27/23REVISED PER ADDENDUM 3MBDMWBPASSIVE FILTER EQUIPMENT REMOVED