FIELD REPORT
Project No. 7945.04 Page 1 of 1 Report ID 7945.04 E 01252023
Date Wed 1/25/2023 Weather 45°F Cloudy
Arrival/Departure Time(s) 1:45PM; 2:15PM Travel Time (hr) 0.75
Project Name Canopy Property
Location 413 Lincoln Ave NE, Renton
ESNW Rep. & Phone Willem Scherwin | 206 793 8569
Client Info/Contact Century Communities | Stacia Bloom
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
RAC
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested by the client, ESNW rep was onsite to observe and test backfill of sewer main onsite.
Sewer Backfill
While onsite, ESNW rep observed the contractor backfill the sewer pipe. ESNW rep observed the
excavation to approximately 12’ deep. The sewer pipe was backfilled with pea gravel and backfilled with
gray-brown silt and sand with gravel. Each lift was approximately 12” thick and compacted with a hoe
pack. ESNW rep took compaction tests and found adequate compaction of at least 95% of the proctor at
the tested locations.
ESNW rep will return as requested to observe future earthwork activities.
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of MDD
82 Sewer Fill -4 2 128.2 12.9 121.3 95
83 Sewer Fill SG 2 128.2 13.2 122.1 95
Report ID 7954.04 E 01252023 Page 2 of 2
Earth Solutions NW, LLC
82,83