Good Afternoon Matt,
After review of the letter Jack had sent Chip back in May of last year, our request has not changed. It is
our believe that we can obtain a greater efficiency of construction by focusing subcontractors on an
individual building at a time, rather than splitting efforts between the two. As Jack had mentioned in his
letter, we wish to focus on the affordable building first as we have made scheduling commitments to
our investors. This does not mean work will be completely halted on the market rate building, as there is
ample site work around the building that will continue. Framers will then rotate to the market rate
building after completion of framing the affordable building, this sequencing would carry on with the
remaining trades; with the market rate building being completed no later than 6-months behind the
affordable building. Please see a summarized schedule below:
Affordahle-
Framing- January 30, 2023
Finishes- North Tower: October 2023, South Tower: January 2024
Completion -
Market:
Framing -January 23, 2023
Finishes- North Tower: March 2024, South Tower June 2024
Completion -test Tower October 2024, East Tower January 20.A
Additional sequencing details:
Framing has started on both Blocks, and based on the manpower by the framing company they will be
framed simultaneously, though concentrating more on Block "A" where we will push any excess
manpower. Beyond that our focus will continue to be on Block " A" for the rough -in, and finish trades,
with the direction to concentrate on Block "A" and then follow to Block "B" with the goal of Block "B"
being around 3-4 months behind Block "A", but again manpower will concentrate on Block "A" first.
Please let me know if you know if have any additional questions.
Thank you,
Dalton Arndt
Development Manager, DevCo Development
DevCo Family of Companies
EXHIBIT 62
DocuSign Envelope ID: 7B0468D5-05FF-424C-BE5E-6F57A941153F
PO Box 41081 Bellevue, WA 98009
Mobile: 253.606.0715
Email: dalton.arndt@DevCoUs.com
Website: www.DevCoUs.com
From: Matthew Herrera <MHerrera@Rentonwa.gov>
Sent: Friday, January 20, 2023 12:07 PM
To: Dalton Arndt <dalton.arndt@devcous.com>
Subject: RE: Solera HEX decision modification
Hi Dalton,
I was able to review the file and bring myself back up to speed on the project this morning. I think the
scope of what I need to see in the submittal is fairly limited. I think it can be as simple as a narrative of
what the request entails. Jack had provided a letter back in May 2022. Take a look at that and see if any
changes are needed in what he was asking. I would also like a projected timeline of construction
milestones, i.e. when is Block A expected to be completed and how far is Block B anticipated to be
behind? Does all work on Block B stop and focus is all on Block A for a period of time? If you can provide
some insights here that would be helpful. You can send these to me via email and I will start the process
of getting it into the system. After I get everything, I'll send over an invoice for the modification fee.
Let me know if you have questions and/or want to have a quick call to discuss. Thanks! -Matt
MATT HERRERA, AICP, Current Planning Manager
City of Renton I CED I Planning Division
1055 S Grady Way 16th Floor I Renton, WA 98057
Virtual Permit Center I Online Applications and Inspections
DESK: (425) 430-6593 1 MOBILE: (206) 308-6231 1 mherrera@rentonwa.gov
From: Matthew Herrera
Sent: Thursday, January 19, 2023 3:11 PM
To: Dalton Arndt <dalton.arndt@devcous.com>
Subject: RE: Solera HEX decision modification
Hi Dalton,
Apologies in my delayed response. Just need to find some time to review the file and determine what I
need to process the modification. I should have something for you tomorrow. Thanks for your patience.
-Matt
DocuSign Envelope ID: 7B0468D5-05FF-424C-BE5E-6F57A941153F
May 16, 2022
City of Renton
1055 South Grady Way
Renton, WA 98057
Attn.: Mr. Chip Vincent
Director of Community and Economic Development
Re: Solera
Dear Chip:
We are writing to explain a minor modification that we would like to ask the City to approve for
the build -out of Solera. We are happy with the way the City has dealt with us to date and are
grateful for the civic investments made in the Highlands neighborhood. Please consider this letter
our request for a Minor Modification to amend the Hearing Examiner Decision for Solera' by
substituting the following condition for Condition 1.d of the HEX Decision:
"d. The Applicant shall complete the project phases in the sequence of the updated phasing plan
as provided in Exhibit 15, as modified by this Condition 1.d. Construction of Phase 2 may occur
concurrently with Phase 1. The City shall not issue any Temporary Certificates of Occupancy
for Buildings A-1 and A-2 until the roofs have been fully installed on Buildings B-1 and B-2.
Phase 3 townhome construction shall not begin until the building permits for Phase 1 have been
paid for by the Applicant and issued by the City. One block of Phase 3 townhome construction
(north or south of NE 11" St) may begin following building permit issuance of Phase 1. The
second block of Phase 3 townhomes may begin following building permit issuance for the
second mixed use building in Phase 2. Certificates of occupancy for the townhomes will not be
issued until the podium and framing for Phase 1 has passed inspection. (Modified Condition
#18y,
Solera unit type plans have firmed up since the hearing, so that we now know that Block A will
be all affordable units, and Block B will be mostly market rate." We know it is important to the
City to ensure the successful completion of the market rate component of Solera. That is what we
intend to do. We have closed the financing for both the affordable and the market rate rental
components of the Project. We would be happy to share those documents with the City. Our
concrete subcontractor has the capacity to build the parking structures for both the market rate
and affordable components at the same time. That work is underway concurrently on both
blocks. The ability to work both blocks at once does not hold true for the balance of our
subcontractors. They are only able to work on one side at a time and maintain efficiency. We
would like to be able to assign the other subcontractors, starting with the framer, to the
'Revised Findings of Fact, Conclusions of Law and Final Decision on the Solera Master Plan, Modification to Master Plan, Site
Plan and Preliminary Plat; Street Modification (LUA20,000305, SA-M, PP, SA-H, MOD), dated March 14, 2021 (the "HEX
Decision").
" Block B will include two affordable units and 313 market rate units, Block A will include 275 affordable units and no market
rate units, with the overall multifamily unit mix for Blocks A and B of Solera being 313 market rate units, and 277 affordable
units.
10900 NE 8'11 Street, #1200, Bellevue, WA 98004 425-452-4041
DocuSign Envelope ID: 7B0468D5-05FF-424C-BE5E-6F57A941153F
affordable component first. With this approach, we think the spread between completion of the
market rate and affordable components will not exceed six months.
We are making this request for two reasons: (1) Because of the time value of the tax credits
generated by the affordable component, we have an incentive to complete those buildings first.
(2) More importantly, we would like to fulfill as best we can the scheduling representations we
have made to our tax credit investor Boston Financial, a very important tax credit investor
relationship for us. They in turn have relied on those representations to make commitments to
their upper tier investors. While we are now making good progress, we will be unable to deliver
the affordable buildings on the schedule we originally promised, because of supply chain issues
and COVID. To the extent we can, we would like to minimize that delay.
The City can rely on our commitment to complete the market rate component based on the
amendment to the Hearing Examiner Decision proposed above. Our agreement with Citibank
(the lender for both the affordable and market rate rental components of the Project) states that
we shall contribute the first $40,000,000 required to build the market rate rental component
before the lender will advance funds. We have contributed about $11,000,000 so far to purchase
the market rate land and pay for the market rate construction to date. We will have contributed
the full $40,000,000 to the market rate component by the time we have installed the roofs on the
market rate buildings. We will have a compelling incentive to complete the market rate buildings
in a timely manner after having invested $40,000,000 in the land and those buildings.
With the City's cooperation, we also undertake to complete the 11,000 square feet retail portion
of Buildings A-1 and A-2 as soon as possible so that Highlands residents can enjoy those retail
uses as soon as possible.
We believe our request can be achieved through a Minor Modification to the Hearing Examiner
Decision, consistent with Condition 21.b of the HEX Decision, if this sequencing adjustment is
acceptable to the City.
We would be happy to introduce you to Citibank and Boston Financial for any additional
perspective that you might consider useful. Also, please let us know if there is any other
additional information that would be helpful in reviewing our request.
Thank you in advance for your consideration.
Yours truly,
SOLERA AFFORDABLE, LLC
Per:
Evan J. Hunden
SOLERA MARKET, LLC
Per:
Evan J. Hunden
Managing Member Managing Member
10900 NE 811' Street, #1200, Bellevue, WA 98004 425-452-4041
DocuSign Envelope ID: 7B0468D5-05FF-424C-BE5E-6F57A941153F
Armondo Pavone
Mayor
Community & Economic Development C. E. "Chip" Vincent, Administrator
E. Jack Hunden, Managing Member May 27th, 2022
Solera Affordable, LLC
Solera Market
10900 Northeast Bch Street, #1200
Bellevue, Washington 98004
425.452.4041
Dear Jack,
Thank you for meeting with me earlier this month to discuss the Solera project. The Solera master plan is a
significant private investment for the Sunset Highlands neighborhood following years of capital public
investments to the area. The community planning effort in the years preceding the capital and private
investment foresaw the mixed income and mixed use development that Solera will bring to the neighborhood.
As you know from our discussions with your team during the entitlement period, the balance of affordable and
market rate units is a priority for the City and the master plan phasing schedule prioritized the market rate and
the master plan's infrastructure to be completed in the initial phase. The City has issued construction and
building permits for the concrete podiums for the affordable Block A (Phase 2) and the market rate Block B
(Phase 1) and work is now occurring on both phases concurrently.
I understand from our conversation that the concurrent construction capacity and efficiency can be maintained
through the podium process, however as the buildings begin to move to the vertical stage this would no longer
be the case. Due to financing commitments, it is my understanding that the affordable Block A (Phase 2) would
need to be prioritized following the completion of the podiums. You have indicated that although Block A would
be completed first, the completion of Block B would not exceed six (6) months following the Block A completion.
A modification to the master plan phasing schedule would need to be processed in order to alter the completion
of the Blocks.
The City supports the Solera project and would also support a modification to the master plan phasing schedule
to accommodate your noted financing commitments and construction efficiencies. The Department of
Community and Economic Development stands ready to process a modification when the project nears
completion of the podiums for Blocks A and B. At that time, please contact Current Planning Manager Matt
Herrera to determine materials needed for the modification application.
Respectfully,
C.E. Chip Vincent