HomeMy WebLinkAboutEquity Commission - 14 Mar 2023
AGENDA
EQUITY COMMISSION
5:30 PM -Tuesday, March 14, 2023
Council Chambers, 7th Floor, City Hall – 1055 S. Grady Way
Please note this regular meeting of the Renton Equity Commission is being offered as a hybrid
meeting and can be attended in person in the Council Chambers, Renton City Hall, 7th Floor, 1055
South Grady Way, Renton, 98057 or remotely through Zoom. Commission members are attending
this meeting in person.
For those wishing to attend by Zoom, please (1) click this link:
https://us06web.zoom.us/j/84989034992?pwd=UmhTWGpiVVZZSWowR252azREUUZnUT09
Passcode: 590901 (or copy the URL and paste into a web browser) or (2) call into the Zoom meeting
by dialing 253-215-8782 and enter Webinar ID: 849 8903 4992, Passcode 590901 or (3) call 425-430-
7394 by 10 a.m. on the day of the meeting to request an invite with a link to the meeting.
Public comment is permitted in person, via access using the above Zoom link, or may also be
submitted in writing to Lmoschetti@rentonwa.gov before 4 p.m. the day of the meeting. Those
providing audience comments will be limited to three (3) minutes each speaker unless an exception is
granted by the Commission. Attendees will be muted and not audible to the Commission except
during times they are designated to speak.
1. CALL TO ORDER
2. ROLL CALL
3. MAYOR PAVONE'S COMMENTS
a) Equity Commission Proposed Discussion Topics for 2023
4. STAFF COMMENTS
5. AUDIENCE COMMENT
Those wishing to address the Equity Commission will be called upon. Each speaker is allowed
three (3) minutes.
6. CONSENT AGENDA
a) Approval of the January 10, 2023 Renton Equity Commission Regular Meeting minutes.
Page 1 of 26
7. UNFINISHED BUSINESS
8. NEW BUSINESS
a) Housing Action Plan
Acting Community Development and Housing Manager Hannah Bahnmiller
b) Introduction to Policy 250-02 Purchasing, Bidding, and Contracting
Equity, Housing, and Human Services Administrator Maryjane Van Cleave will
briefly describe the review process and expectations.
9. COMMISSION MEMBER COMMENTS
10. COMMISSION CHAIR COMMENTS
11. ADJOURNMENT
Hearing assistance devices for use in the Council Chambers are available upon request.
For more information please email: Lmoschetti@rentonwa.gov
MEMBERS
Nicole Hill, Chair Manami Imaoka Cassandra Baddeley
Lisa Davis, Vice Chair Ashok Padhi Celina Kershner
Morgan Kroeger Youth Member - Vacant Rueben Turk
Page 2 of 26
January 10, 2023 REGULAR COUNCIL MEETING MINUTES
MINUTES
EQUITY COMMISSION
5:30 PM -Tuesday, January 10, 2023
Council Chambers, 7th Floor, City Hall – 1055 S. Grady Way
CALL TO ORDER
The January 10, 2023 Equity Commission Regular Meeting was called to order by
Administrative Assistant Linda Moschetti-Newing at 5:32 p.m.
ROLL CALL
Commissioners Present:
Cassandra Baddeley
Lisa Davis
Nicole Hill
Manami Imaoka
Celina Kershner
Ashok Padhi
Commissioners Absent:
Morgan Kroeger
Rueben Turk
MOVED BY PADHI, SECONDED BY IMAOKA TO CONSIDER ABSENCES OF COMMISSIONERS
KROEGER AND TURK AS UNEXCUSED. CARRIED.
ADMINISTRATIVE STAFF PRESENT
Patrice Kent, Senior Assistant City Attorney
Linda Moschetti-Newing, Administrative Assistant
Chan Te, Community Outreach Coordinator
Benita Horn, Equity and Inclusion Consultant
Attending Remotely:
Jason Seth, City Clerk
Katie Meehan, Health and Safety Coordinator
Erika Eddins, Human Resources Benefits Manager
Page 1 of 3
AGENDA ITEM #6. a)
Page 3 of 26
January 10, 2023 REGULAR COUNCIL MEETING MINUTES
ELECTION OF OFFICERS
Election of Chair
Equity, Housing, and Human Services Administrative Assistant Linda Moschetti-Newing
Election of Vice Chair
Equity Commission Chair
Commissioner Davis nominated Commissioner Hill for Chairperson. No other nominations.
ADMINISTRATIVE ASSISTANT MOSCHETTI-NEWING CLOSED NOMINATIONS AND ASKED FOR
A VOTE. COMMISSIONER HILL ELECTED 2023 CHAIRPERSON.
Commissioner Baddeley nominated Commissioner Davis for Vice Chairperson. Commissioner
Imaoka nominated Commissioner Baddeley for Vice Chairperson. Commissioner Baddeley
declined the nomination. ADMINISTRATIVE ASSISTANT MOSCHETTI-NEWING CLOSED
NOMINATIONS AND ASKED FOR A VOTE. COMMISSIONER DAVIS ELECTED 2023 VICE
CHAIRPERSON.
MAYOR, STAFF COMMENTS
Mayor Pavone was unable to attend the meeting.
Administrative Assistant Moschetti-Newing updated the Commission on the status of
applications received to fill the Commission's vacant youth position. Acceptance of
applications is ongoing.
APPROVAL OF AGENDA
MOVED BY PADHI, SECONDED BY DAVIS TO APPROVE THE AGENDA AS PRESENTED.
CARRIED.
AUDIENCE COMMENT
Those wishing to address the Renton Equity Commission will be called upon. Each
speaker is allowed three (3) minutes.
None.
CONSENT AGENDA
Approval of the November 3, 2022 Renton Equity Commission Special Meeting/Workshop
minutes.
Approval of the November 8, 2022 Renton Equity Commission Regular Meeting minutes.
MOVED BY BADDELEY, SCONDED BY PADHI TO APPROVE THE CONSENT AGENDA AS
PRESENTED. CARRIED.
SPECIAL PRESENTATION
Open Public Meetings Act and Robert's Rules of Order Training
City Clerk Jason Seth
Page 2 of 3
AGENDA ITEM #6. a)
Page 4 of 26
January 10, 2023 REGULAR COUNCIL MEETING MINUTES
City Clerk Jason Seth conducted training covering the Open Public Meetings Act, Public
Records Act, and Robert's Rules of Order.
UNFINISHED BUSINESS
None.
NEW BUSINESS
None.
COMMITTEE MEMBER COMMENTS
COMMITTEE CHAIR COMMENTS
ADJOURNMENT
Meeting adjourned at 6:42 p.m.
Hearing assistance devices for use in the Council Chambers are available upon request.
For more information please email: lmoschetti@rentonwa.gov.
MEMBERS
Nicole Hill, Chair Manami Imaoka Cassandra Baddeley
Lisa Davis, Vice Chair Ashok Padhi Celina Kershner
Morgan Kroeger Youth Member - Vacant Rueben Turk
Page 3 of 3
AGENDA ITEM #6. a)
Page 5 of 26
Page 6 of 26
eklit"
ftati POLICY & PROCEDURE
Subject: Index: Administration
PURCHASING, BIDDING AND
Number 250-02
CONTRACTING REQUIREMENTS
Effective Date: Supersedes: Page:Staff Contact: Approv By:
3/9/2018 3/5/2015 1 of 20 Jan Hawn i _
1.0 PURPOSE:
To establish a uniform and efficient review, approval and execution policy and procedure
for selection, bidding, leasing, and contracting requirements for goods, services and public
works projects throughout the City.
2.0 ORGANIZATIONS AFFECTED:
All departments/divisions.
3.0 REFERENCES:
RCW 35.22.620; RCW 35A.40.200& 210; RCW 39.04.010 & 155 & 350; RCW 39.10.420 &
430; RCW 39.35A.020; RCW 39.80.
City of Renton Resolution No. 4029.
City Policy 400-12
4.0 POLICY:
It is the policy of the City of Renton to utilize uniform, efficient, and competitive bidding,
purchasing, quoting, Requests for Proposals (RFPs), cooperative purchasing, and
Statements of Qualifications (SOQs) consistent with State law, and to ensure that all public
purchases and contracts for services, equipment, materials, supplies and public works are
executed and managed at the highest professional and ethical standard and to achieve the
greatest attainable levels of quality and value permitted by law.
The City encourages funds expended by the City, to the extent possible and practical, be
reinvested in the local economy.
AGENDA ITEM #8. b)
Page 7 of 26
Policy 250-02
p.2
5.0 DEFINITIONS:
5.1 ALTERNATIVE PUBLIC WORK CONTRACTING PROCESSES: As it relates to this policy,
Alternative to the Competitive Sealed Bid process includes: 1) Small Works Roster
RCW 39.04.155); 2) Limited Public Works Projects Process (RCW 39.04.155(3)); 3)
Performance-Based Contracts for Energy Equipment; and 4)Job Order Contracting
RCW 39.10.420).
5.2 CHANGE ORDER: A written amendment or modification of a contract. Including, but
not limited to, contracts for construction of a Public Work using alternative public
works processes authorized by RCW 39.10.
5.3 CONTRACT: An agreement between the City and one or more entities.
5.4 CONTRACT CHECKLIST: A form required to be completed and submitted to the City
Clerk Division with appropriate attachments for any contract, agreement,
addendum, lease, or change order.
5.5 CRAFT: A "sub-unit" of a construction group such as carpenters, electricians and
masons.
5.6 DESIGNEE:A person who has been designated to act on behalf of a person
authorized by this policy to take action (e.g. approve or sign a contract). All such
delegations shall be made in writing with the scope and duration of the delegation
specified. Written delegations of authority shall be provided to and retained by the
City Clerk and updated or revoked upon any applicable changes to the scope of the
delegation.
5.7 ELECTRONIC WRITTEN QUOTES: A process whereby price quotations are obtained
by fax, email, or other paper or electronic format for the purpose of producing and
comparing a written record of vendor quotes.
5.8 EMERGENCY: Unforeseen circumstances beyond the control of the municipality that
either a) present a real, immediate threat to the proper performance of essential
functions; or b) will likely result in material loss or damage to property, bodily injury,
or loss of life if immediate action is not taken.
5.9 ENERGY CONSERVATION EQUIPMENT AND SERVICES: Equipment and services that
are expected, upon installation, to reduce the energy use or energy cost of an
existing building or facility. The services associated with the equipment, materials, or
supplies include, but are not limited to, design, engineering, financing, installation,
project management, guarantees, operations, and maintenance.
Reduction in energy use or energy cost may also include reductions in the use or cost
of water, wastewater, or solid waste. RCW 39.35A.020(1)
5.10 GOODS AND MATERIALS: Supplies and equipment not used in connection with a
Public Work including, but not limited to, office supplies, maintenance supplies (e.g.
beauty bark, top soil, etc), automobiles, equipment (e.g. specialty lighting, cameras,
AGENDA ITEM #8. b)
Page 8 of 26
Policy 250-02
p.3
and furniture).
5.11 INTERLOCAL COOPERATIVE PURCHASES: Cooperative or joint purchases by different
governmental entities established through interlocal agreements.
5.12 JOB ORDER CONTRACT: A contract the City has entered into pursuant to RCW
39.10.430 with a registered or licensed contractor for an indefinite quantity of work,
over a fixed period of time, for the use of future negotiated, definitive work orders
for public works projects.
5.13 PERFORMANCE BASED CONTRACT:A contract that provides for payment only if
there are cost savings. RCW 39.35A.020(4)
5.14 PROFESSIONAL SERVICES: Activities rendered by any person, other than an
employee of a public or government agency, involving the presentation or delivery of
professional opinion, assessment, design, or other information to the City having a
primarily intellectual final product.
5.15 PUBLIC WORK: All work, construction, alteration, repair, demolition, or
improvement, other than ordinary maintenance, that is executed by contract,
purchase order, or any other legal agreement and that is executed at the cost of the
City, or which is by law a lien or charge on any property of the City (RCW 39.04.010
4)). The sources of the funding shall not determine the applicability of the statute,
and may include, but is not limited to, such sources as those payments made
through contract with insurance companies on behalf of the City.
5.16 ORDINARY MAINTENANCE: In the context of Public Works contracts and prevailing
wages, is defined as work that is not performed by contract' and that is performed
on a regularly scheduled basis not less frequently than once per year to service,
check, or replace items that are not broken; or work not performed by contract that
is not regularly scheduled but is required to maintain the asset so that repair does
not become necessary and is performed by City workers.
5.17 PUBLIC WORK(COMPETITIVE) BID PROCESS: Formal process of securing
competitive price quotes for public work projects based on a specific set of
specifications by publishing a call for bid in the City's official newspaper, or a paper
of general circulation most likely to bring responsive bids, at least 13 days prior to
the bid opening date. The advertisement designates a specific time and place for
sealed bids to be publicly opened and read by the City Clerk. The City Council
awards the contract to the contractor submitting the lowest responsible bid.
5.18 PUBLIC WORKS PROJECT TOTAL: The costs of a separate public work project shall
be the costs of all labor, materials, supplies, equipment, incidentals, and applicable
1 WAC 296-127-010(7)(b)lists situations under which prevailing wages do not have to be paid. The phrase"not
performed by public contract" must be in the definition of"ordinary maintenance,"when prevailing wages are at
issue because cities must pay prevailing wages when contracting for services as opposed to using City force. City
of Spokane v. Department of Labor and Industries.
AGENDA ITEM #8. b)
Page 9 of 26
Policy 250-02
p.4
sales taxes required to complete all work included in the project proposal.
5.19 REQUEST FOR PROPOSALS (RFP): Solicitation of proposals for professional services,
or equipment, materials or supplies not associated with a public work. RFP's are
project specific and distinctly describe the services needed and qualifications
required.
5.20 REQUEST FOR STATEMENT OF QUALIFICATIONS (SOQ/RFQ): Solicitation of
statements of qualifications for certain project types. SOQ's are a list of general
qualifications and are typically used for routine and/or smaller projects.
5.21 SEALED BID: A document containing all required State and City documents as well as
the bidder's proposal of project cost that is delivered to the City in a sealed envelope
and is only to be opened at the scheduled bid opening time.
5.22 SMALL WORKS ROSTER: A list of public work contractors who have requested
placement on the roster and who are properly licensed or registered to perform
work in this state.
5.23 SOLE SOURCE SUPPLY: A desired product clearly limited to a single source or supply.
5.24 TAXES: All amounts and thresholds contained herein shall be inclusive of applicable
sales and use taxes at the time of soliciting for bids/proposals.
5.25 WORK ORDER:An alternate method of procuring services for public works projects,
through the City's job order contractor for a specific public works project under
350,000. Aggregate work orders under the same Job order contract is limited to $4
million per year.
6.0 VENDOR SELECTION PROCEDURES
6.1 DETERMINING COST, SELECTION PROCESS, AUTHORIZATION AND SIGNING
AUTHORITY:Total estimated cost includes all applicable materials, supplies,
equipment, labor, and applicable sales and use tax for the entire scope of the
purchase. The entire scope should include all of the City's anticipated needs at the
time of solicitation. Intentionally limiting job scope to avoid the competitive
contractor selection process and proper authorization is prohibited.
Based on the purchase type and the total estimated cost the Purchasing Matrix in
Exhibit B shall be used to identify the appropriate selection process, and required
levels of authorization and signing authority.
6.1.1 Public Works Projects done by City Employees: For public works projects,
excluding ordinary maintenance,that exceed $40,000 for single craft and
65,000 for multiple craft, the project must not be done by City work crews
and must be competitively bid.
AGENDA ITEM #8. b)
Page 10 of 26
Policy 250-02
p.5
6.2 SOLICITING QUOTES, RFP'S, AND SOQ'S THROUGH SHARED VENDOR LISTS (SMALL
WORKS ROSTER):The City is a participant of the eCityGov Alliance, which allows
access to a wide variety of vendor lists through its Shared Procurement Portal,
including vendors for supplies, materials, equipment, Architecture and Engineering,
professional services, and public works. The eCityGov Alliance is responsible for
fulfilling the advertising requirements prescribed by RCW 39.04.155 for small works
rosters. This forum should be used to identify vendors and solicit quotes when
applicable. The eCityGov Alliance website can be found at
www.sharedprocurementportal.com. Usernames and passwords for individual users
can be obtained through the Finance Department.
When required, the City shall solicit quotations from all appropriate vendors to
assure that a competitive price is established. Invitations for quotes shall include an
estimate of the scope and nature of the work to be performed as well as materials
and equipment to be furnished. Detailed plans and specifications need not be
included in the invitation.
At the time quotes are solicited, the City representative shall not inform a contractor
of the terms or amount of any other contractor's quote for the same project.
6.2.1 Minimum Solicited Quotes: The minimum number of quotes solicited shall
be dictated by the selection process identified in the Purchasing Matrix
exhibit B). Quotations may be invited from all appropriate vendors who
have indicated the capability of performing the kind of work being contracted
in a manner that will equitably distribute the opportunity among all
appropriate vendors on the Shared Procurement Portal roster. It is likely not
all vendors will respond with quotes and there is no minimum requirement
for the number of quotes that are actually received prior to selecting a
vendor.
The City must ensure that it equitably distributes the opportunity to bid to all
appropriate contractors (RCW 39.04.155 2(c)). Therefore, the same vendors
may not be singled out repeatedly for solicitation when other vendors are
excluded from solicitation.
If the estimated cost of the work is from one hundred and fifty thousand
dollars ($150,000)to three hundred thousand dollars ($300,000), and the City
has not solicited quotations from all appropriate vendors on Shared
Procurement Portal roster, the City must notify the remaining vendors on the
appropriate roster that quotations on the work are being sought. The City
has the sole option of determining whether this notice to the remaining
vendors is made by:
AGENDA ITEM #8. b)
Page 11 of 26
Policy 250-02
p.6
1. Publishing notice on the City's website, or if applicable, with a link
posted on the eCityGov shared procurement portal;
2. Sending a notice to these vendors by email based on an email address
provided by these contractors to the City or eCityGov database.
6.2.2 Record Keeping: A written record shall be made by the City representative of
each contractor's bid on the project and of any conditions imposed on the
bid. Immediately after an award is made the bid quotations obtained shall be
recorded, open to public inspection, and available by telephone inquiry.
6.3 SOLICITATION OF FORMAL SEALED BIDS: For a public work contract greater than
300,000 or where a "Formal Sealed Bid" is called for, a call for bids shall be
published at least 13 days in advance of the bid submission deadline. The call for bid
shall be e-mailed to the City Clerk and Deputy Clerk for advertisement at least two
days prior to the first date of legal publication.
6.3.1 Advertisement Content: The legal advertisement for the call for bid should
contain the following items:
1. Title of project;
2. Nature and scope of work to be performed and materials and
equipment to be furnished;
3. If applicable, statement of mandatory contractor criteria and notice of
any supplemental criteria under RCW 39.04.350
4. Location where contract documents (plans and specifications) may be
obtained or reviewed including the URL of any electronic posting;
5. Cost to obtain a set of contract documents, or instructions for
downloading or printing electronic documents;
6. Time after which bids will not be received and the location where bids
are to be submitted;
7. Place, date, and time set for opening of the sealed bids;
8. Name and telephone number of staff contact;
9. Requirements for an accompanying bid bond; and
10. Statements that the City retains the right to reject any and all bids
and to waive minor irregularities in the bidding process.
6.3.2 Bid Bond: For contracts of$300,000 or more, bid bonds are required to help
ensure that a bid has been made in good faith and that the bidder will enter
into a contract if his or her bid is accepted. RCW 35.23.352(1) provides that
each bid must be accompanied by a bid proposal deposit in the form of a
cashier's check, postal money order, or surety bond to the City for a sum of
not less than five percent of the bid amount, including sales tax.
After bids are opened and the contract is awarded to the lowest responsive
responsible bidder as required by RCW 35.23.352, the bid proposal deposits
AGENDA ITEM #8. b)
Page 12 of 26
Policy 250-02
p.7
or bid bonds are returned to the unsuccessful bidders. The successful bidder's
bid bond or deposit is retained until the bidder enters into a contract with the
municipality and furnishes a performance bond in the full amount of the
contract price. If the successful bidder fails to enter into a contract with the
municipality and does not provide a performance bond within ten days of
being notified of the bid's acceptance, the bidder generally is required to
forfeit the bid bond or deposit.
6.3.3 Public Works Contracts over$1 million: RCW 39.30.060 specifies that in
order for a bid to be considered responsive, every bidder for a public works
contract of over$1 million must submit (either with their bid or within one
hour of the bid submittal time)the names of all subcontractors that will be
used for heating, ventilation and air conditioning, plumbing, and electrical
work.
6.4 LOWEST RESPONSIBLE BIDDER: After all bids (through the formal sealed bid process)
or quotes (from the small works roster process) have been submitted, the contract
shall be awarded to the lowest responsible bidder as defined by RCW 39.04.350(1).
Formal sealed bids must be opened in public at the place, date, and time set forth in
the bid proposal. The City shall award the contract for the project to the lowest
responsible bidder (RCW 39.04.350) provided that, whenever there is a reason to
believe that the lowest acceptable bid is not the best price obtainable or other
reasons (i.e., defect or any other reason), all bids may be rejected and the City may
call for new bids.
6.5 DETERMINATION OF RESPONSIBLE BIDDER: For all public works contacts, a
responsible bidder is defined by RCW 39.04.350 as 1) being a registered contractor,
2) having current state unified business identifier number, 3) having valid workers'
compensation insurance coverage as evidenced by a valid certificate of registration
from the department of Labor and Industry for bidder employees, 4) valid
Employment Security number for unemployment insurance, 5) an affidavit that
bidder is not disqualified from bidding as provided by statutes governing
unregistered and unlicensed contractors and/or failing to pay prevailing wages per
RCW 39.12.065(3) or 39.06.010., and 6) holds a state excise tax registration number.
6.5.1 Supplemental Bidder Responsibility: In addition to the standard responsible
bidder requirements,the City may develop additional criteria to determine
whether the lowest bidder is responsible. Parameters for the supplemental
criteria are set by RCW 39.04.350(2).
The purpose of Supplemental Bidder Responsibility is to identify whether the
low bidder holds the relevant experience, training, and/or certification
requirements or qualifications. Criteria may include experience and other
qualifications of the bidder's subcontractors, suppliers, or employees who
will be performing specific work on the project. When developing
AGENDA ITEM #8. b)
Page 13 of 26
Policy 250-02
p.8
supplemental criteria, project managers should ensure the supplemental
criteria is deliberate, documented, defensible, and relevant to the project.
The supplemental bidding criteria must be advertised in the bid documents.
In addition the City must state the basis for evaluation, deadline for
submitting bidder responsibility documentation, and the deadline for the
appeal of any "not responsible" determination that has been made.
The City shall evaluate the low bidder's submitted documentation to
determine whether they meet the supplemental criteria for a responsible
bidder. If the low bidder fails to submit the required supplemental criteria
documentation, that bidder may be found not responsible. Determination of
responsibility must be made prior to award of contract.
Appendix A includes a list of Supplemental Bidder Responsibility Criteria
examples. This appendix should be used as a tool only.
6.6 EVALUATION OF RFPS AND SOQS: If the City has solicited SOQs or RFPs for the
procurement of Architecture and Engineering type services or other professional
services, qualifications should be evaluated as follows: evaluation of the
qualifications and performance data along with any information submitted regarding
the proposed project. Following evaluation of the written proposals and other
relevant information,the City may perform oral interviews with the firms rated the
highest.
The City shall select the firm "most highly qualified" to provide the required services.
The price or cost of the service may not be considered by the City when determining
which firm is the most highly qualified. After selection,the City may negotiate a
contract for the services at a price that it determines is fair and reasonable,
considering the estimated value of the services to be rendered, as well as the scope
and complexity of the project. If a satisfactory contract cannot be negotiated,the
City shall formally terminate the negotiations with that firm and attempt to
negotiate a contract with the next most qualified firm. The process continues until
an agreement is reached or the search is terminated.
6.7 PURCHASES WITH FEDERAL FUNDS: On any purchase either partially or fully funded
with federal funds, bidders must provide a non-collusion and debarment affidavit.
The project manager must also verify that the bidder is not debarred or suspended
from federally funded programs by: 1) verifying the contractor is not on the "Lists of
parties Excluded from Federal procurement or Nonprocurement Programs", 2)
printing the verification and 3) maintaining the printed verification with original bid
documents as proof of responsibility.
6.8 MAINTENANCE CONTRACTS: For the purpose of fulfilling all contractor selection,
AGENDA ITEM #8. b)
Page 14 of 26
Policy 250-02
p.9
procurement, and contract requirements, maintenance contracts are treated the
same as procurement for public work projects. While maintenance contracts are
subject to prevailing wage requirements, they are not subject to the performance
and payment bonds and retainage requirements that other public works contracts
are subject.
All maintenance contracts that are procured by the City must have a written
contract that clearly defines scope, time frame for job completion/contract period,
and cost. To properly identify total cost the City's needs for the entire year should
be considered and combined, when appropriate.
The City's preference is to create annual, or even multiyear, contracts for recurring
and routine maintenance services if it can achieve significant cost savings with a
longer contract period. Total contract cost is determined by the aggregate value of
the contract including all periods the contract entails. All maintenance services
contracted each year will be required to have a fully executed contract if the
services will cost more than $10,000 a year.
6.9 ON-CALL CONTRACTS: City departments may solicit bids for on-call contracted
services for small maintenance, public work projects, and professional service
contracts. These services can include, but are not limited to: emergency tree
removal, plumbing, electrical and housing repair. The benefit of using an on-call
contract gives the City flexibility for getting repairs done quickly, and reducing
administrative time spent on managing very small public works projects. Therefore,
each on-call contract amount should not exceed $35,000.
When establishing an on-call contract, special care should be given to ensure all
procurement and contracting laws are followed. The Purchasing Matrix in Exhibit B
should be used to identify the performance bond, prevailing wage, and retainage
requirements applicable to the services provided by the on-call contract.
On-call contracts must only be made with contractors who meet the applicable
minimum requirements established by RCW 39.04.350 and outlined in section 6.5 of
this policy.
The following are considerations to make when establishing an on-call contract:
1. Identify all of the potential small tasks that will need, or may need,
completion throughout the duration of the contract. Do not include tasks that
are so large that they should be procured individually through a stand-alone
maintenance, service, or public works project.
2. Parts and materials can be bid by the vendor as cost plus a defined markup.
3. Vendors can also bid the hourly cost of their workers based on prevailing
wage plus a defined markup.
AGENDA ITEM #8. b)
Page 15 of 26
Policy 250-02
p. 10
4. The total bid should be the sum of the unit prices items times the task
quantity. The vendors who bid are not guaranteed any minimum contract
amount; only the maximum contract amount.
5. Consider including a contract clause that reserves the City's right to ask for a
price in advance for each project that is estimated to exceed $2,500.The City
can select one on call vendor or several. Within the bid documents, the City
can outline the expectations of how quickly the vendor will respond.
Selecting several vendors to be on the list provides for availability of a
number of firms and each City department can use the list to find a vendor to
meet its timeframe and/or budget constraints.
6. These contracts should be one year in duration, with a maximum of two
separate one year extensions.
7. Prevailing wage intents must be filed prior to the first payment under the
contract and affidavits need to be filed with the Department of Labor and
Industries at least annually.
6.10 EXCEPTIONS TO THE COMPETITIVE SELECTION PROCESS
6.10.1 Interlocal Purchasing Authorized: State contracts, and other interlocal
cooperative purchasing agreements may be utilized for acquisition of non-
public work goods, supplies, materials, equipment, and services without
going through additional processes described in this policy.
6.10.2 Purchase at Auctions: RCW 39.30.045 allows for the purchase of any supplies
or equipment at auctions rather than through competitive bidding, if the
items can be obtained at a competitive price.
6.10.3 Emergencies: In the event an emergency situation arises which necessitates a
deviation from bidding and contracting requirements, the Mayor or his/her
designee shall award, on behalf of the City,those contracts necessary to
address the emergency situation. In emergency situations, RCW 39.04.280
requires that a written finding of the existence of an emergency be made and
entered into the public record no later than two weeks following the award
of the contract.
RCW 39.04.280 defines an emergency as "unforeseen circumstances beyond
the control of the municipality that either: a) present a real, immediate threat
to the proper performance of essential functions; or b) will likely result in
material loss or damage to property, bodily injury, or loss of life if immediate
action is not taken."
AGENDA ITEM #8. b)
Page 16 of 26
Policy 250-02
p. 11
6.10.4 Sole Source: In the event a department finds it necessary to use a sole source
for the acquisition of materials, supplies, equipment, or services, the
department shall first submit, for approval, a rationale to the department
head for contracts less than $35,000 or the Mayor for contracts in excess of
35,000. If approved,the sole source acquisition may be executed subject to
the Contracting section (Section 7) and Approval and Execution section
Section 8) of this policy.
Sole source acquisition may only be used in instances where there is exclusive
distributorship of product or service or if such service or product is clearly
unique. A requirement for a particular proprietary item does not justify sole
source procurement if there is more than one potential bidder or offeror for
that item.
6.10.5 Performance-Based Contracts for Energy Conservation Equipment and
Services: Cities may enter into performance-based contracts when
contracting for certain water conservation services, solid waste reduction
services, and energy conservation equipment and services.
To acquire such equipment, services or supplies,the City need not follow a
competitive bid process. Instead,the City shall announce its requirements
and seeks proposals to meet those requirements. Using evaluation criteria it
has established in the Request for Proposals, the City then negotiates with
the person or firm that has submitted the "best proposal" according to the
criteria. If the City is unable to develop a satisfactory contract with that
person or firm, it may select the next best person or firm and negotiate with
it until a contract can be agreed to or the selection process is terminated.
6.10.6 Job Order Contract (JOC): Small public works projects, not exceeding
350,000, may be procured by creating a work order through the City's job
order contractor. The project manager shall be familiar with the terms of the
contractor's price book and must be comfortable negotiating prices. The
City's project manager must ensure that the contractor has identified the
correct line items in the price book, and quantities, for the project.
Using the JOC only offers an alternative to the procurement method of a
small public works project. Each work order procured through the job order
contractor is still bound, but not limited, to the following requirements:
1. Each work order is subject to approval per the City's authorization
thresholds identified in the Purchasing Matrix and section 6.1 of this
policy and procedure.
2. The job order contractor shall pay prevailing wages, pursuant to RCW
39.12, and section 7.1 of this policy.
AGENDA ITEM #8. b)
Page 17 of 26
Policy 250-02
p. 12
3. The job order contractor shall be subject to all performance and
payment bonds, pursuant to RCW 39.08, and section 7.2 of this policy.
4. Retainage shall be withheld, pursuant to RCW 60.28, and section 7.3
of this policy.
5. Each work order is still subject to compliance with sections 6.9, 7.4,
and 7.5 of this policy.
6.10.7 Telecommunications and Data Processing Equipment and Software: For
purchases of telecommunications and data processing equipment, the City
may opt to use an RFP process for solicitation. Refer to section 6.6, Evaluation
of RFPs and SOQ5.
6.11 Purchases with Grant Funds: If the purchase is funded either fully or partially with
grant money, the purchasing requirements stipulated in the grant award supersede
the City of Renton's purchasing procedures. Unless the City's purchasing
requirements are more restrictive, in which case the most restrictive requirements
must be followed.
6.12 Local Business Preference: City departments shall make their best effort to
purchase goods and services from local businesses when price, availability,
quality/qualification and responsibility are comparable. This preference is not
applicable when prohibited by law, agreement, funding source or when the
purchase is made through competitive or cooperative/interlocal purchase
agreement in accordance with procedures prescribed herein.
7.0 CONTRACTING REQUIREMENTS
Whenever the City enters into a service agreement (maintenance, professional service, or
public work) there are several contracting requirements that must be considered. All
contracts should include the total contracted amount, detailed description of work to be
done, scope, and time frame requirements. In addition,the Purchasing Matrix in Exhibit
B identifies three additional potential requirements: prevailing wage, payment and
performance bond, and retainage.
7.1 PREVAILING WAGES:The City is required by RCW 39.12.040 to require contractors
to pay prevailing wages on all public works contracts. A "Statement of Intent to Pay
Prevailing Wages", approved by L&I, must be received from a contractor before any
payment is made, and an L&I certified "Affidavit of Wages Paid" must be received
following final acceptance of the work. Final payment will be withheld on all
contracts until the L&I certified Intent and Affidavit forms are received. If retainage is
being withheld, final payment will be the retainage release; if no retainage is being
withheld, final payment is the final pay estimate.
AGENDA ITEM #8. b)
Page 18 of 26
Policy 250-02
p. 13
7.1.1 Alternate Process: RCW 39.12.040 allows for an alternate process to accept
combined Intent and Affidavit short forms for contracts with a value under
2,500, when a small works roster is used to solicit quotes. This process
allows the contractor to submit both the "Statement of Intent to Pay
Prevailing Wages" and "Affidavit of Wages Paid" directly to the City without
prior L&I approval or certification. Within 30 days of receiving the
contractor's Affidavit, the City must submit the Affidavit of Wages Paid to L&I
for approval. If a small works roster is not used to solicit quotes, this
alternate process cannot be used.
For multi-year maintenance contracts; Intents must be filed no less than once
in the beginning of the contract period (prior to first payment) and approved
affidavits must be filed at least once annually at the end of the year.
7.2 PERFORMANCE AND PAYMENT BONDS: Performance and payment bonds are a
required contract component for all public works and maintenance service
contracts. Depending on the total cost and the selection process used, the
retainage requirements may vary.
Contracts Greater than $35,000: Performance and payment bonds are
required for no less than 100% of the contract amount.
Contracts $10,000-$35,000, using small works roster: Performance and
payment bonds may be waived, provided the contract is procured through
the small works roster, as described in section 6.2 of this policy.
Contracts $10,000-$35,000, not using small works roster: If solicitation has
not occurred through the small works roster process, Performance and
payment bonds are required for no less than 100% of the contract amount.
At the option of the contractor, the performance and payment bond may be
waived in lieu of 50% retainage.
7.3 RETAINAGE AND CLAIMS AGAINST A CONTRACTOR: Retainage is a required
contract component for all public works and maintenance service contracts, except
for public improvement contracts involving the construction, alteration, repair, or
improvement of any highway, road, or street funded in whole or in part by federal
transportation grants. For these contracts, the City shall rely upon the contractor's
performance bond for project completion and fulfillment of claims and liens. For all
other contracts, the retainage requirements vary depending on the total cost and
selection process used.
Contracts Greater than $35,000: Per RCW 60.28.11, a 5% retainage will be
withheld from all contractor payments for the purpose of fulfillment of claims
and liens. In lieu of having retainage withheld,the contractor may submit a
AGENDA ITEM #8. b)
Page 19 of 26
Policy 250-02
p. 14
bond for all or any portion of the contract retainage in a form acceptable to
the public body and from a bonding company meeting standards established
by the public body.
Contracts$10,000- $35,000, using small works roster: Retainage may be
waived if the contractor is selected through the small works roster process, as
outlined in section 6.2 of this policy.
Contracts $10,000-$35,000,not using small works roster: A 5% retainage
will be withheld from all contractor payments for the purpose of completion
of projects and fulfillment of claims and liens. If the contractor has exercised
their option to waive performance and payment bond (section 7.2), then 50%
retainage will be withheld.
All claims filed against a contractor's retainage and/or performance bond on a
public work project shall be submitted to the City Clerk Division and filed within 45
days of final project closeout. Copies will be forwarded to the project manager, risk
manager, and City attorney. The original will be forwarded to the Accounts Payable
Division of the Finance Department. The closeout provisions in section 7.5 of this
policy must be fulfilled within 60 days of project completion so retainage is ready
for release provided the City has received all State releases identified in RCW
60.20.021.
7.4 CHANGE ORDERS AND ADDENDA: A change order, a supplement, an amendment,
or an addendum is any alteration to an existing contract or agreement.
Change orders and addenda may occur during a project in progress that is
consistent with the initial scope, quantities, specifications, or contracting period
upon which the contract was awarded. New bids are not required when unforeseen
extra work becomes necessary under a valid preexisting contract. However, when
change in scope and purposes deviates substantially from the original plans as to
constitute a new undertaking, such change shall be reviewed by the City Attorney in
consultation with the contracting department to determine if it constitutes a
separate project and requires a new selection and contract process.
When the cumulative value of addenda or change orders exceeds the higher of
100,000 or 10%of the initial contract award amount, that contract will be
highlighted on the City Clerk's quarterly contract report to the City Council as
information only. At the Council's request, further information on specific contract
change orders or addenda that exceed the $100,000 or 10%thresholds will be
provided by the Department Head or designee.
7.5 PROJECT CLOSEOUT: All public work contracts must be authorized and approved
for final completion by the authority that originally approved the contract (i.e.
AGENDA ITEM #8. b)
Page 20 of 26
Policy 250-02
p. 15
contracts less than $35,000 will require a department head signature for final
closeout). For projects requiring Council authorization the project manager will
present the final completion to Council for approval.
1. Once the project has been authorized for final completion, the project
manager will issue the Notice of Completion and send to Accounts Payable
A/P). A/P will send the Notice of Completion to Department of Revenue,
Department of Labor& Industries, and the Employment Security Department
to start the process of retainage release. A/P will also review the project file
to ensure that all the affidavits of prevailing wages have been filed by the
primary contractor and all the sub-contractors. If there are any outstanding
claims against the bond, A/P will contact the project manager to get those
claims cleared up prior to release of retainage.
2. Once A/P receives all notifications of compliance from Department of
Revenue, Department of Labor& Industries and the Employment Security
Department, and all claims against the bond have been cleared, a final email
will be sent to the project manager verifying the job is complete and ready to
release the retainage.
Final pay estimates can be paid to the contractor prior to council approval, but
retainage will not be released until project closeout is complete and any claims
against the retainage have been settled. Full project closeout must be completed
within 60 days of project completion, so retainage may be released, provided all
state releases identified by RCW 60.28.021 have been received.
8.0 APPROVAL AND EXECUTION OF CONTRACTS AND AGREEMENTS:
8.1 COUNCIL APPROVAL OF CONTRACTS: All contracts and agreements that exceed
100,000 or public works contracts that exceed $150,000 require Council approval
prior to execution.
7.1.1 Public Work Contracts: Following bid opening and tabulation, an agenda bill
will be prepared by the City Clerk. The project manager shall prepare a
memo to the City Council recommending award of the project contract to the
lowest, responsible bidder and identifying the funding source. The memo will
be submitted to the City Clerk to accompany the agenda bill and the bid
tabulation. If all three of the following criteria are met, the project will be
placed on the Council's consent agenda for a recommended action of
Council concur":
1. The lowest responsible bid is within the project budget;
2. More than one bid was received; and
3. The bids contained no significant irregularities
If one of more of these criteria are not met, the bid award will be referred to
AGENDA ITEM #8. b)
Page 21 of 26
amok
Policy 250-02
p. 16
the appropriate Council committee for review and recommendation.
All bid packages, including date-stamped envelopes, shall be returned to the
City Clerk Division for archiving.
7.1.2 Non-Public Work Contracts: Non-public works contracts $100,000
and over shall be placed on the Council consent agenda with recommended
action of referral to the appropriate Council committee, unless the purchase
is for routine or reoccurring goods or services, in which case it may be placed
on the Council consent agenda with the recommended action of"Council
concur."
If the contract or purchase is through an interlocal agreement that has not
been previously approved by the City Council, the interlocal agreement
requires adoption of a resolution.
8.2 CHANGE ORDERS AND ADDENDA: Any eligible addenda or change order that either
individually or cumulatively have a cost in excess of$100,000 or 10% of the original
contract (whichever is greater), shall be highlighted on the City Clerk's quarterly
contract list and placed on the consent agenda with the recommended action of
Council concur" if the following conditions exist:
1. The cost of the change order or addenda does not exceed the budgeted
amount originally approved for the contract, including previously approved
addenda;
2. The line item has been budgeted and does not exceed the budgeted
amount;
If one or more of the conditions listed above are not met, a separate consent
agenda item the change order or addenda will be referred to the appropriate
Council committee for review and recommendation.
Change orders and addendum shall be executed by both parties before the contract
period of
the performance ends and before the contractor begins work as authorized by the
amendment.
8.3 EXCEPTIONS THAT APPLY TO ALL CONTRACTS: In addition to the new contracts,
changes orders, and addenda referenced above,the following circumstances also
require Council review:
1. The line item exceeds the amount budgeted or is not budgeted, in which
case it will require referral to appropriate Council committee.
AGENDA ITEM #8. b)
Page 22 of 26
Policy 250-02
p. 17
2. The contract or purchase is through an interlocal agreement or grant that
has not been approved by the City Council and requires adoption of a
resolution.
8.4 EXECUTION OF CONTRACTS
8.4.1 Transmittal and Approvals Required: All City contracts and contract change
orders, amendments, addendum, supplements, regardless of signature
authority, will be submitted to the City Clerk Division accompanied by a
completed contract checklist form (available through the City Clerk and on the
intranet). Staff is responsible for completion and attachment of all applicable
requirements as indicated on the contract checklist. Whenever possible, the
original contracts should be signed first by the contractor, consultant or
governmental agency entering into the contract before being submitted to the
City Clerk for execution by the Mayor.
8.4.2 Signing Authority: Contracts or change orders/amendments involving an
exchange of less than $35,000 may be signed by a department Administrator
or Designee so long as sufficient funding is budgeted and the contract does
not involve a real estate transaction, an obligation by the City to indemnify a
third party, or an obligation of City resources (e.g. staff, equipment...) that has
a value of$35,000 or more. All other contracts shall be signed by the Mayor
or Designee. Contracts that require Council approval shall not be signed until
after such approval is obtained. Following execution, the City Clerk Division
will return one or more original contracts to the department to transmit to
the contractor, consultant or agency. One original contract will be retained by
the City Clerk Division.
8.4.3 Indexing and Archiving: All City contracts will be assigned a CAG (Contract
Agreement) number, indexed and archived by the City Clerk Division in
accordance with the State records retention schedule.
8.5 INFORMATIONAL REPORT
The City Clerk Division shall maintain a contract log and provide Council with
quarterly reports on all new contracts executed by the City during the past quarter
that are $50,000 or more in value.
AGENDA ITEM #8. b)
Page 23 of 26
Policy 250-02
p. 18
EXHIBIT A
Sample of Supplemental Bidder Responsibility Criteria
Supplemental criteria can vary from contract to contract. Project managers should keep in mind
that not all criteria are applicable to all projects and some criteria will require customization for
a specific project. When developing supplemental criteria the project manager should ensure
the criteria are 1) relevant to the specific project, 2) necessary, and 3) clear and specific.
General and subjective language should not be used. The following are some examples that are
generally relevant to most contracts. More specific criterion may be developed for each
contract.
1. Criterion:The Bidder shall not owe delinquent state taxes to the Washington State
Department of Revenue in the past three years.
Documentation:The Bidder shall not be listed on the Washington State Department of
Revenue's "Delinquent Taxpayer List" on State website.
2. Criterion: The Bidder shall not currently be debarred or suspended by the Federal
Government.
Documentation:The Bidder shall not be listed as a current debarred or suspended
bidder on the U.S. General Administration's "Excluded Parties List System" on the GA
website.
3. Criterion:The Bidder shall not have been convicted of a crime involving bidding on a
public works contract within five years from the bid submittal deadline.
Documentation:The Bidder shall sign a statement (on a form to be provided by the City)
that the Bidder has not been convicted of a crime involving bidding on a public works
contract. The City may also use independent sources of information to demonstrate
whether the Bidder is in compliance with the criterion.
4. Criterion: The Bidder shall not have had any public works contract terminated for cause
by a government agency during the five year period immediately preceding the bid
submittal deadline for this project.
Documentation:The Bidder shall sign a statement (on a form to be provided by the City)
that the Bidder has not had any public works contract terminated for cause by a
government agency during the five year period immediately preceding the bid submittal
deadline for this project. The City may also use independent sources of information to
demonstrate whether the Bidder is in compliance with this criterion.
5. Criterion:The Bidder shall not have lawsuits with judgments entered against the Bidder
within five years of the bid submittal date.
AGENDA ITEM #8. b)
Page 24 of 26
Policy 250-02
p. 19
Documentation: The Bidder shall submit a list of lawsuits with judgments entered
against the Bidder within five years of the bid submittal date, along with a written
explanation of the circumstances surrounding each such lawsuit.
6. Criterion: The Bidder shall not have a record of prevailing wage complaints filed against
it within five years of the bid submittal date that demonstrates a pattern of failing to pay
workers prevailing wages.
Documentation:The Bidder shall submit a list of prevailing wage complaints filed against
it within five years of the bid submittal date. The City may also evaluate complaints filed
within the time period specified that were not reported by the Bidder.
AGENDA ITEM #8. b)
Page 25 of 26
AGENDA ITEM #8. b)Page 26 of 26